100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Project Management Unit Test C722 Questions with Accurate Answers

Puntuación
-
Vendido
-
Páginas
21
Grado
A+
Subido en
02-07-2025
Escrito en
2024/2025

8 and 80 rule correct answer According to the ____________, a project manager should avoid controlling tasks that take less than eight hours and should not let more than two weeks go by without checking in. A diverse group of scorers correct answer The effectiveness of results achieved from a scoring model is improved by using: A project manager must manage people at all organizational levels as well as costs, expectations, procurement, and partners. correct answer Which of the following statements about project manager responsibilities is true? Achievement of business results correct answer Which of the following does not present a project management challenge? active listening correct answer Which of the following is important to understanding what others are saying both verbally and nonverbally and for effective project management? agile correct answer The _________method of project management has been developed for use on projects where the end product is not clearly defined in advance.

Mostrar más Leer menos
Institución
Project Managememt
Grado
Project Managememt










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Project Managememt
Grado
Project Managememt

Información del documento

Subido en
2 de julio de 2025
Número de páginas
21
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Project Management Unit Test
C722 Questions with Accurate
Answers
8 and 80 rule correct answer According to the ____________, a project
manager should avoid controlling tasks that take less than eight hours
and should not let more than two weeks go by without checking in.


A diverse group of scorers correct answer The effectiveness of results
achieved from a scoring model is improved by using:


A project manager must manage people at all organizational levels as
well as costs, expectations, procurement, and partners. correct answer
Which of the following statements about project manager
responsibilities is true?


Achievement of business results correct answer Which of the following
does not present a project management challenge?


active listening correct answer Which of the following is important to
understanding what others are saying both verbally and nonverbally
and for effective project management?

,agile correct answer The _________method of project management
has been developed for use on projects where the end product is not
clearly defined in advance.


Beta distribution estimation method correct answer Which of the
following estimation methods was developed as the project evaluation
and review technique (PERT) to support the U.S. Navy's Polaris missile
project?


business scenario correct answer Which of the following represents an
important business need or issue and provides an opportunity for
others to create an appropriate, valuable solution?


calendarized correct answer A budget distributes costs across the time
periods of the project.


capable correct answer For a project selection model to be considered
____________ it must be able to integrate the relevant factors of the
evaluation including: time, risk, cost, and the internal as well as external
environments.


checklist project selection model correct answer ____________ use a
series of questions to evaluate each potential project and then the
answers to the questions would be compared to determine whether a
project is accepted or rejected.

, closing correct answer Which of the following processes includes
activities such as reconciling vendor accounts, writing lessons learned,
and receiving customer sign-off?


communication correct answer Which of the following is the two-way
process where the people involved share and respond to ideas and
information via verbal, written or nonverbal means?


comparable correct answer A(n) ____________ project selection model
should be usable across a range of projects such that the outcomes of
the model can be used to compare projects.


Competitive necessity correct answer The ____________ model
evaluates projects based on whether implementing the project will
ensure the viability of the company in the competitive market.


complexity correct answer A typical example of ____________ in a
project is the involvement of many different people, many different
materials, and many different outcomes.


controlling activities correct answer When monitoring detects changes
that need to take place,_________________are/is required.


cost management correct answer Which of the following is the process
of measuring how close actual costs are to the budget and then making
changes in project execution as needed?
$17.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
starwid Yale University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
13
Miembro desde
6 meses
Número de seguidores
1
Documentos
8058
Última venta
4 días hace

3.3

4 reseñas

5
1
4
0
3
2
2
1
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes