What |is |partnering? |- |CORRECT |ANSWER✔✔-A |team |building |technique, |calling |upon |the |
parties |to |the |construction |contract |to |establish |a |common |set |of |project |goals |and |objectives |
and |develope |a |protocol |for |communication |and |conflict.
What |is |a |RFI? |- |CORRECT |ANSWER✔✔-(Request |for |information) |A |written |request |for |
clarification |regarding |details |presented |in |the |plans |or |specifications. |(Usually |made |by |
subcontractors |through |the |genereal |contractor)
What |is |Submittals? |- |CORRECT |ANSWER✔✔-Data, |samples, |details, |colors, |and |product |
literature |required |by |the |terms |of |the |contract |to |be |presented |by |the |architect |by |the |
contractor |for |approval |prior |to |ordering.and |installing |them.
What |is |Mock-Up? |- |CORRECT |ANSWER✔✔-Physical |models |or |small |samples |constructed |to |
allow |the |architect |and |owner |to |review |the |appearance |and |fuction |of |the |materials |beofre |
incorperation |into |the |project
What |is |shop |drawings? |- |CORRECT |ANSWER✔✔-A |supplemental |drawing |to |the |plans |and |
sepcifeiations |that |details |fabrication |methods, |materials, |and |models |of |a |product |or |
installation |associated |with |the |project
What |is |schedule |of |values? |- |CORRECT |ANSWER✔✔-a |budget |template |established |early |in |
the |project |against |which |progress |payments |are |mesasured. |Summarizes |the |total |project |
cost |by |various |divisions |of |work
What |is |retainage? |- |CORRECT |ANSWER✔✔-A |certain |percentage |of |money |owed |to |the |
contractor |for |work |progress |that |is |held |back |by |the |owner |to |encourage |completion |of |the |
project.
, What |is |Claim? |- |CORRECT |ANSWER✔✔-An |issue |that |occurs |during |the |constriction |and |
remains |unresolved |after |the |job |is |complete
What |is |will |call? |- |CORRECT |ANSWER✔✔-A |verbal |confirmation |of |an |order |that |has |been |
placed |prior |to |the |date |it |is |acutally |due |for |delivery. |Occurs |just |before |the |scheduled |
delivery |date
What |is |a |Concrete |washout |station? |- |CORRECT |ANSWER✔✔-A |temporary |container |installed |
on |a |constriuction |site |to |collect |all |water |runnoff |from |the |washing |of |trucks, |tools, |and |
equipent |associated |with |concrete
What |is |straw |wattles? |- |CORRECT |ANSWER✔✔-An |erosion |control |prouct |made |of |compacted
|straw |or |other |materials |such |as |geotecile |fibers, |bound |into |a |tght, |tubular |roll |that |comes |in
|10-25 |foot |leangths.
What |is |Back |charges? |- |CORRECT |ANSWER✔✔-An |amount |of |money |charged |against |a |
subcontractor |for |work |that |the |general |contractor |performed |because |the |subcontractors |
failed |to |do |so.
What |is |dry |shacks? |- |CORRECT |ANSWER✔✔-provide |dry |places |for |workers |to |eat |and |change
|clothes
What |is |project |staging? |- |CORRECT |ANSWER✔✔-A |layout |plan |identifying |the |placement |of |
all |temporary |facilities |needed |during |the |construictyiopn |stahge |of |the |project, |such |as |the |
office |trailer, |dumpsters |and |such
What |is |laydown |area? |- |CORRECT |ANSWER✔✔-A |designated |area |on |the |building |site |where |
large |orders |can |be |stored |and |sorted |in |an |organized |manner
answers
What |is |partnering? |- |CORRECT |ANSWER✔✔-A |team |building |technique, |calling |upon |the |
parties |to |the |construction |contract |to |establish |a |common |set |of |project |goals |and |objectives |
and |develope |a |protocol |for |communication |and |conflict.
What |is |a |RFI? |- |CORRECT |ANSWER✔✔-(Request |for |information) |A |written |request |for |
clarification |regarding |details |presented |in |the |plans |or |specifications. |(Usually |made |by |
subcontractors |through |the |genereal |contractor)
What |is |Submittals? |- |CORRECT |ANSWER✔✔-Data, |samples, |details, |colors, |and |product |
literature |required |by |the |terms |of |the |contract |to |be |presented |by |the |architect |by |the |
contractor |for |approval |prior |to |ordering.and |installing |them.
What |is |Mock-Up? |- |CORRECT |ANSWER✔✔-Physical |models |or |small |samples |constructed |to |
allow |the |architect |and |owner |to |review |the |appearance |and |fuction |of |the |materials |beofre |
incorperation |into |the |project
What |is |shop |drawings? |- |CORRECT |ANSWER✔✔-A |supplemental |drawing |to |the |plans |and |
sepcifeiations |that |details |fabrication |methods, |materials, |and |models |of |a |product |or |
installation |associated |with |the |project
What |is |schedule |of |values? |- |CORRECT |ANSWER✔✔-a |budget |template |established |early |in |
the |project |against |which |progress |payments |are |mesasured. |Summarizes |the |total |project |
cost |by |various |divisions |of |work
What |is |retainage? |- |CORRECT |ANSWER✔✔-A |certain |percentage |of |money |owed |to |the |
contractor |for |work |progress |that |is |held |back |by |the |owner |to |encourage |completion |of |the |
project.
, What |is |Claim? |- |CORRECT |ANSWER✔✔-An |issue |that |occurs |during |the |constriction |and |
remains |unresolved |after |the |job |is |complete
What |is |will |call? |- |CORRECT |ANSWER✔✔-A |verbal |confirmation |of |an |order |that |has |been |
placed |prior |to |the |date |it |is |acutally |due |for |delivery. |Occurs |just |before |the |scheduled |
delivery |date
What |is |a |Concrete |washout |station? |- |CORRECT |ANSWER✔✔-A |temporary |container |installed |
on |a |constriuction |site |to |collect |all |water |runnoff |from |the |washing |of |trucks, |tools, |and |
equipent |associated |with |concrete
What |is |straw |wattles? |- |CORRECT |ANSWER✔✔-An |erosion |control |prouct |made |of |compacted
|straw |or |other |materials |such |as |geotecile |fibers, |bound |into |a |tght, |tubular |roll |that |comes |in
|10-25 |foot |leangths.
What |is |Back |charges? |- |CORRECT |ANSWER✔✔-An |amount |of |money |charged |against |a |
subcontractor |for |work |that |the |general |contractor |performed |because |the |subcontractors |
failed |to |do |so.
What |is |dry |shacks? |- |CORRECT |ANSWER✔✔-provide |dry |places |for |workers |to |eat |and |change
|clothes
What |is |project |staging? |- |CORRECT |ANSWER✔✔-A |layout |plan |identifying |the |placement |of |
all |temporary |facilities |needed |during |the |construictyiopn |stahge |of |the |project, |such |as |the |
office |trailer, |dumpsters |and |such
What |is |laydown |area? |- |CORRECT |ANSWER✔✔-A |designated |area |on |the |building |site |where |
large |orders |can |be |stored |and |sorted |in |an |organized |manner