What percentage of load gives a 1 Hz change in an island condition? - ANSWER6-10% (Think 6-10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? - ANSWERNothing! ACE bias and interchange schedule will improve frequency If ACE is Zero, why not adjust generation to help frequency? - ANSWERCould overload equipment, this is a NERC violation When restoring from blackout condition, what should be done with load? - ANSWERAll load breakers should be opened, load should be restored in a controlled manner not to exceed 5% of current available gen What's the point of COM-001? - ANSWEREach TO, BA, RC and NERCNet Use Orgs need to have good comms Where do they need to have comms? - ANSWERInternal, Between RC, TO and BA, Other RC, TO, BA and authorities Where applicable comms should be ______ and _______ routed. - ANSWERRedundant and Diversely routed, just in case something fails How do we know comms will be

Mostrar más Leer menos
Institución
NERC
Grado
NERC

Vista previa del contenido

NERC TEST QUESTIONS AND
ANSWERS 2025

, What percentage of load gives a 1 Hz change in an island condition? - ANSWER6-10%
(Think 6-10 day island vacation)

If ACE is Zero but system Hz is off, what should a system operator do? -
ANSWERNothing! ACE bias and interchange schedule will improve frequency

If ACE is Zero, why not adjust generation to help frequency? - ANSWERCould overload
equipment, this is a NERC violation

When restoring from blackout condition, what should be done with load? - ANSWERAll
load breakers should be opened, load should be restored in a controlled manner not to
exceed 5% of current available gen

What's the point of COM-001? - ANSWEREach TO, BA, RC and NERCNet Use Orgs
need to have good comms

Where do they need to have comms? - ANSWERInternal, Between RC, TO and BA,
Other RC, TO, BA and authorities

Where applicable comms should be ______ and _______ routed. -
ANSWERRedundant and Diversely routed, just in case something fails

How do we know comms will be good? - ANSWERThey will manage, alarm, test and/or
actively monitor, especially emergency comm facilities and equipment (non-routine
equipment)

When can languages other than English be used? - ANSWEROnly for internal
operation, Operation of the BES requires comms in English

What is required so operation during a loss of comms will be ensured? -
ANSWERWritten operating instructions and procedures

What is the point of COM-002? - ANSWEREnsure BA, TO, GO, and RC have comms
and capability to use them for addressing emergency and that operators are trained to
use them

Who should a BA or TO notify if they are aware of any condition that could threaten
area reliability or when shedding load? - ANSWERNotify their RC and any other
potentially affected BA or TO

How should directives be issued by an RC, TO or BA? - ANSWERIn a clear, concise
and definitive manner, using 3 part(way) communications

, Who is required to create a blackstart restoration plan? Who approves it? -
ANSWERTransmission Operators; Its RC

When is the blackstart condition finished? - ANSWERWhen the choice of the next load
to be restored is not driven by frequency and voltage control

Who directs the procedure for restoring interconnection between Tos? - ANSWERRC

What must be done prior to implementing changes in a restoration plan? - ANSWERThe
parties invloved must be told of changes to their role and specific tasks prior to
implementation.

How often must the plan be confirmed given no changes were made? - ANSWERTO
annually review the plan and report to RC

After a system modification is made, how long does the TO have to update restoration
plans? - ANSWER90 days

Where is a copy of the restoration plan required to be kept? - ANSWERMain and
backup control rooms

What must be done on the restoration plan every five years? - ANSWERAnalyze the
plan through actual events, steady state and dynamic simulations or testing that the
plan can work as intended.

How often must a Blackstart Resource verify it can meet real and reactive power
requirements of its cranking path and intial load? - ANSWEREvery 5 years

How often must the location of loads required to control voltage and Hz in a blackstart
be verified within operating limits? - ANSWEREvery 5 years

How often is the capability of generating resources required to control voltage and Hz in
a blackstart condition verified? - ANSWEREvery 5 years

What should a TO use if the restoration plan cannot be executed? - ANSWERUse its
restoration strategies

Under what conditions can a TO resynchronize with its neighboring TO? -
ANSWEROnly with RC approval or with the established procedures of the RC

What is the point of Blackstart Resource testing? - ANSWERTo ensure the resource is
capable of me4eting the requirements of the restoration plan

How often must a Blackstart Resource be verified at a minimum? - ANSWEROnce
every 3 years

Escuela, estudio y materia

Institución
NERC
Grado
NERC

Información del documento

Subido en
29 de junio de 2025
Número de páginas
17
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$19.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
papersmaster01 Howard Community College
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
301
Miembro desde
2 año
Número de seguidores
106
Documentos
14704
Última venta
1 mes hace
PAPERSMASTER01

On this page you will find documents , package deals, flashcards offered by seller PAPERSMASTER01.With our documents on your side you"ll be well equipped to tackle you exams and achieve the grades you need.

3.9

73 reseñas

5
22
4
34
3
10
2
3
1
4

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes