Operating reserve may be provided by which of the following? A. LTCs B. Capacitor banks C. Voltage regulators D. Interruptible loads - ANSWERD. Interruptible loads Which of the following is the responsibility of a reserve sharing group (RSG)? A. Complying with DCS as if it was a single control area B. Proving regulation service for neighboring RSGs C. Ensuring each control area in the group maintains 50% blackstart capability D. Complying with the control performance standards as if it was a single control area - ANSWERA. Complying with DCS as if it was a single control area Generation is not sufficient to meet load, the control area is importing heavily, and voltage is decaying, which of the following actions should be taken by the operator? A. Shed load B. Correct schedule deviation C. Use the Interconnection Hotline D. Schedule interchange transaction - ANSWERA. Shed load What measures power flow data between control areas? A. OASIS B. Interchange C. Transactions D. Tie-Line metering - ANSWERD. Tie-Line metering Transmission line removal as a voltage control can be used if: A. Loop flow remains high

Mostrar más Leer menos
Institución
NERC
Grado
NERC

Vista previa del contenido

NERC TEXT QUESTIONS AND
ANSWERS 100% CORRECT

,Operating reserve may be provided by which of the following?
A. LTCs
B. Capacitor banks
C. Voltage regulators
D. Interruptible loads - ANSWERD. Interruptible loads

Which of the following is the responsibility of a reserve sharing group (RSG)?
A. Complying with DCS as if it was a single control area
B. Proving regulation service for neighboring RSGs
C. Ensuring each control area in the group maintains 50% blackstart capability
D. Complying with the control performance standards as if it was a single control area -
ANSWERA. Complying with DCS as if it was a single control area

Generation is not sufficient to meet load, the control area is importing heavily, and
voltage is decaying, which of the following actions should be taken by the operator?
A. Shed load
B. Correct schedule deviation
C. Use the Interconnection Hotline
D. Schedule interchange transaction - ANSWERA. Shed load

What measures power flow data between control areas?
A. OASIS
B. Interchange
C. Transactions
D. Tie-Line metering - ANSWERD. Tie-Line metering

Transmission line removal as a voltage control can be used if:
A. Loop flow remains high
B. Reactive equipment is available
C. Reliability stays at acceptable levels
D. Synchronous condensers are off the line - ANSWERC. Reliability stays at acceptable
levels

Control Area A is generating and sending Control Area B a schedule. Both control areas
should verify all of the following EXCEPT:
A. Magnitude (MW)
B. Ramp rate
C. Price
D. Start/stop times - ANSWERC. Price

The AGC control mode that is normally used for system operation is:
A. Flat Tie Mode

, B. Flat Frequency Mode
C. Frequency Bias Mode
D. Tie Line Bias Mode - ANSWERD. Tie Line Bias Mode

There has been a wide-area disturbance. The transfers through the system have
increased and there is a possibility that loss of one major tie line would cause
corresponding loading and voltage deviations. Having system resources available, the
security coordinator should:
A. Increase generation to reduce flows across the ties
B. Implement schedule changes across the hour
C. Implement a voltage reduction plan
D. Advise the supervisor - ANSWERA. Increase generation to reduce flows across the
ties

When referring to transmission lines of an interconnected network, neighboring systems
should use:
A. Own line identifiers and ratings
B. NERC line identifiers and ratings
C. Region line identifiers and ratings
D. Uniform (common) line identifiers and ratings - ANSWERD. Uniform (common) line
identifiers and ratings

To what level should a control area maintain its own reactive reserves?
A. 105% voltage level
B. 95% voltage level
C. First contingency conditions
D. Second contingency conditions - ANSWERC. First contingency conditions

Which load shedding step should be implemented first (per Policy 6B)?
A. Manual
B. Underfrequency
C. Rate of voltage decay
D. Rate of frequency decay - ANSWERA. Manual

Between sending, receiving, and intermediary control areas, what is the minimum
information pertaining to an interchange schedule that must be confirmed?
1. The scheduling path & magnitude of the transaction
2. The Start/stop times, ramp times, and duration
3. Price of energy
4. Loss accounting including MVAR at points of receipt and delivery
A. 1 and 2
B. 1 and 4
C. 2 and 3
D. 3 and 4 - ANSWERA. 1 and 2

Escuela, estudio y materia

Institución
NERC
Grado
NERC

Información del documento

Subido en
29 de junio de 2025
Número de páginas
24
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$19.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
papersmaster01 Howard Community College
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
301
Miembro desde
2 año
Número de seguidores
106
Documentos
14704
Última venta
1 mes hace
PAPERSMASTER01

On this page you will find documents , package deals, flashcards offered by seller PAPERSMASTER01.With our documents on your side you"ll be well equipped to tackle you exams and achieve the grades you need.

3.9

73 reseñas

5
22
4
34
3
10
2
3
1
4

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes