What is an accelerometer used for?
| | | | |
- Temperature measurement |
- Acoustic monitoring |
- Vibration measurement |
- Oil analysis
|
| Vibration
measurement
|
Corrective work is performed following preventive
| | | | |
maintenance when
| . | |
- The schedule calls for it
| | | |
- The supervisor requests it
| | |
- The PM work was performed incorrectly
| | | | |
- Problemsare discovered | |
Problems are discovered
| | |
should be disposed of in an OSHA-approved | | | | | |
fireproof container.
| |
,- Oily rags |
- Paper
- Wood
- Metalscraps |
Oily rags
| |
What is established when operating equipment is in good
| | | | | | | |
condition?
|
- The best operator for the job
| | | | |
- Normal running levels for physical characteristics
| | | | |
- Optimal order schedules for part inventory
| | | | |
- The storage of maintenance logs
| | | |
Normal running levels for physical characteristics
| | | | |
What is everyone responsible for?
| | | |
- Scheduling maintenance after equipment breakdown | | | |
- Completing work orders on time | | | |
- Keeping the work area clean of dirt, dust, and debris
| | | | | | | | |
- Filling out corrective action reports
| | | |
Keeping the work area clean of dirt, dust, and debris
| | | | | | | | |
,Results of tests, inspections, and a schedule for future maintenance
| | | | | | | | |
can be found where?
| | | |
- User Manual |
- Statement of work (SOW) | | |
- Preventive maintenance log | |
- The employee break area
| | |
Preventive maintenance log
| | |
The employee verifies that preventive maintenance is
| | | | | |
complete when
| . | |
- Closing out a PM work order | | | | |
- Beginning a PM work order | | | |
- Making random equipment inspections
| | |
- Completing a corrective action report | | | |
Closing out a PM work order
| | | | | |
A maintenance log records work performed on a piece of
| | | | | | | | |
equipment. A maintenance log should be kept for
| | | | | | | |
.
- Machines without safety guards | | |
- Two weeks following a machine failure
| | | | |
, - Machines that show signs of wear | | | | |
- Everymachine |
Every machine
| |
Brooms and mops should be stored | | | | | | .
- Next to the machine | | |
- In pairs |
- In chemical cabinets
| |
- In a designated area or cleaning closet In
| | | | | | |
a designated area or cleaning closet
| | | | | |
If a machine is obviously leaking,
| | | | | | .
- The employee should notify a supervisor
| | | | |
- The employee should attempt to fix the machine
| | | | | | |
- The employee should shut down the machine immediately
| | | | | | |
and evacuate
| |
- The employee should throw some rags on the floor to soak up
| | | | | | | | | | |
the leak
| |
The employee should notify a supervisor
| | | | |
2026) QUESTIONS AND VERIFIED CORRECT
ANSWERS
What is an accelerometer used for?
| | | | |
- Temperature measurement |
- Acoustic monitoring |
- Vibration measurement |
- Oil analysis
|
| Vibration
measurement
|
Corrective work is performed following preventive
| | | | |
maintenance when
| . | |
- The schedule calls for it
| | | |
- The supervisor requests it
| | |
- The PM work was performed incorrectly
| | | | |
- Problemsare discovered | |
Problems are discovered
| | |
should be disposed of in an OSHA-approved | | | | | |
fireproof container.
| |
,- Oily rags |
- Paper
- Wood
- Metalscraps |
Oily rags
| |
What is established when operating equipment is in good
| | | | | | | |
condition?
|
- The best operator for the job
| | | | |
- Normal running levels for physical characteristics
| | | | |
- Optimal order schedules for part inventory
| | | | |
- The storage of maintenance logs
| | | |
Normal running levels for physical characteristics
| | | | |
What is everyone responsible for?
| | | |
- Scheduling maintenance after equipment breakdown | | | |
- Completing work orders on time | | | |
- Keeping the work area clean of dirt, dust, and debris
| | | | | | | | |
- Filling out corrective action reports
| | | |
Keeping the work area clean of dirt, dust, and debris
| | | | | | | | |
,Results of tests, inspections, and a schedule for future maintenance
| | | | | | | | |
can be found where?
| | | |
- User Manual |
- Statement of work (SOW) | | |
- Preventive maintenance log | |
- The employee break area
| | |
Preventive maintenance log
| | |
The employee verifies that preventive maintenance is
| | | | | |
complete when
| . | |
- Closing out a PM work order | | | | |
- Beginning a PM work order | | | |
- Making random equipment inspections
| | |
- Completing a corrective action report | | | |
Closing out a PM work order
| | | | | |
A maintenance log records work performed on a piece of
| | | | | | | | |
equipment. A maintenance log should be kept for
| | | | | | | |
.
- Machines without safety guards | | |
- Two weeks following a machine failure
| | | | |
, - Machines that show signs of wear | | | | |
- Everymachine |
Every machine
| |
Brooms and mops should be stored | | | | | | .
- Next to the machine | | |
- In pairs |
- In chemical cabinets
| |
- In a designated area or cleaning closet In
| | | | | | |
a designated area or cleaning closet
| | | | | |
If a machine is obviously leaking,
| | | | | | .
- The employee should notify a supervisor
| | | | |
- The employee should attempt to fix the machine
| | | | | | |
- The employee should shut down the machine immediately
| | | | | | |
and evacuate
| |
- The employee should throw some rags on the floor to soak up
| | | | | | | | | | |
the leak
| |
The employee should notify a supervisor
| | | | |