Questions And Correct Answers(Verified Answers)|Already Graded A+
1. Performing in-depth fact finding to understand 3. Discover and understand de-
details is done as part of which Core Process? tails
2. A(n ) includes hardware, software, inputs, information system
outputs, data, people, and procedures.
3. An automation boundary is best described as the automated part of a system and
separation between the . the manual part of a system
4. Two of the primary benefits of iterative develop- early deployment of part of the
ment include (choose two). system
high risk elements done first
5. The purpose of a use case is to . Identify a business event that re-
quires system action
6. Determining the major subsystems and assign- 2. Plan and monitor the project
ing them to an iteration is done in which Core
Process?
7. Things such as how to do project planning, or how techniques
to do cost/benefit analysis, or how to conduct an
interview are called .
8. Systems analysis means understanding and spec- True
ifying in detail what the information system
should accomplish.
9. The process of understanding and specifying in analysis
detail what the information system should ac-
complish is called systems .
10.
, TMA ICT 284 Exam Revision Newest 2025 Actual Exam Complete
Questions And Correct Answers(Verified Answers)|Already Graded A+
What are the first two models, e.g. diagrams that Use case diagram
include the entire system, that are built during
the Core Process to "discover and understand de- Class diagram
tails"?
11. Which phase of the SDLC is the following task Design
most likely to occur in?
The analyst and database administrator make de-
cisions about replicating tables in the database
12. When a system is partitioned into pieces, each subsystem
piece is referred to as a .
13. SDLC stands for what? Systems Development Life Cycle
14. A person that functions as an architect to plan, systems analyst
capture the vision, and understand the needs for
a new system is often called a .
15. A set of comprehensive guidelines for carrying methodology
out all of the activities of each core process of the
SDLC is called a(n ):
16. Determining team members and assigning re- 2. Plan and monitor the project
sponsibilities is done in which Core Process?
17. Programming is included in which Core Process? 5. Build, test and integrate sys-
tem components
18. Which phase of the SDLC would the following task Implementation
most likely occur in?
The analyst teaches the plant manager how to
, TMA ICT 284 Exam Revision
generate a new predefined report using a new
system.
19. The purpose of a class diagram is to . document the information re-
quirements in the new system
20. The core process "Discover and understand de- True
tails" is equivalent to the Analysis phase of the
SDLC.
21. A combines three components: the problem System vision document
description, the business benefits, and the sys-
tem capabilities.
22. Which two of the following are activities belong- Perform risk and feasibility
ing to the first core process? analysis
Quantify project approval factors
23. Which would be the least desirable reason to ini- To take advantage of new tech-
tiate a new development project? nology
24. Which two of the following are activities of Core Gather detailed information
Process 3, Discover and Understand Details?
(choose two) Develop user-interface dialogs
25. As part of the interview process, any unresolved put on an open-items list
issues should be .
26. Clients play what role in the development of the Fund the project
new system?
27. During a fact-finding interview, an important to probe to get suflcient details
guideline is .