RWP PG Guide Set Questions and Answers Complete pass 100%
RWP PG Guide Set Questions and Answers Complete pass 100% Type of working limits on controlled track - foul time, exclusive track occupancy Type of working limits on non-controlled track - inaccessible track Type of train approach warning - watchman Type of train approach warning - individual train detection What type of work roadway workers do? - inspection and construction of track, maintenance of bridges, repair of signal and communication systems, repair of RMM True or false. Fouling a track can apply to both people and machinery - True Within what distance to the track is a roadway worker considered fouling it? - 4 feet from the nearest running rail A what authorizes movements on controlled track. - Operator/Dispatcher The RWIC is required to be qualified on physical characteristics when their group is working on.... - All tracks The EIC is an employee who is in charge of.... - A work group The main role of the RWIC is.... - To establish on track safety When can personal electronic devices be used while on duty? - If there is an emergency at the job site and no other forms of communication are available Prior to performing any task that requires fouling a track or has the potential to foul a track, all roadway workers must participate in an.... - on-track safety briefing The safety briefing must be conducted.... - At the job location Whistle boards are required when.... - 5 or more employees are working for more than 1 hour When using foul time with off-track equipment for more than 5 minutes on a main track you must use.... - a supplemental shunting device Local control is used for.... - C&S inspections/testing or joint C&S and MW switch inspection How is a job briefing documented? - NRPC 4104 When is an on-track safety briefing required? - When performing any task that has potential to foul a track. Who is responsible for establishing on-track safety? - RWIC What does foul time ensure for the crew working in the designated area(working limits)? - That no trains will operate within the working limits What information is provide by the RWIC when requesting foul time? - Name and title, time limits, track designation, track limits When is the use of an SSD required? - Any situation in which equipment is used for foul time longer than 5 minutes What allows an RWIC to establish ETO(Exclusive Track Occupancy)? - Permission from the dispatcher, flagman stationed at each entrance of working limits, fixed signals indicating "stop" When are whistle boards required? - When working with 5 or more employees for more than 1 hour Do whistle boards replace watchman? - No All movements made on non-controlled track must be made using.... - Restricted Speed Using restricted speed train/equipment must be able to.... - Stop within half the range of vision
Escuela, estudio y materia
- Institución
- RWP Training Course
- Grado
- RWP Training Course
Información del documento
- Subido en
- 26 de junio de 2025
- Número de páginas
- 5
- Escrito en
- 2024/2025
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
type of working limits on controlled track foul
-
type of working limits on non controlled track
-
type of train approach warning watchman
-
type of train approach warning individual train