Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 9 páginas
Examen

Florida Electrical Business Exam Questions with Correct Answers 2025

Document preview thumbnail
Vista previa 2 fuera de 9 páginas

Florida Electrical Business Exam Questions with Correct Answers 2025 Florida Electrical Business Exam Questions with Correct Answers 2025

Vista previa del contenido

Florida Electrical Business Exam Questions
with Correct Answers 2025
The right to repossess or replevy unused materials from a jobsite will not be effective if someone, in
good faith, purchased it after removal from the site of the improvement. --PRECISE ANS---True.



The contractor must within days after the receipt of the property owner's request, furnishish to
property owner or the property owner's agent a list of the subcontractors and suppliers who have a
contract with the contractor as of the date the request is received by the contractor. -
CORRECT ANSWER -10 days.



A property perfected lien may be discharged by an order of the circuit court of the where the
property is located. --PRECISE ANS---county



When any interested party files a complaint, the clerk will issue a summons to the lienor to show cau
se within days why his or her lien should not to be enforced by action or vacated and canceled
of record. --PRECISE ANS---20 days



If a lienor fails to show cause why his or her lien should not be enforced or fails to start such action b
efore the return date of the summons, the court will immediately order cancellation of the lien. --
PRECISE ANS---True



No lien provided by part 713.22 will continue for longer then years after the claim of lien has be
en recorded. --PRECISE ANS---1 year



No lien provided by part 713.22 will continue for no longer then years after the recording of
an amended claim of lien that shows a later date of final furnishing of labor, services, or materials. --
PRECISE ANS---1 year



The lien of any lienor upon whom Notice of contest of Lien is served and who fails to institute a suit t
o enforce his or her lien within days after service of such notice will be extinguished autom
atically. --PRECISE ANS---60

, The payment bond is required to an owner under s. 713.23 must be furnished by the contract or
in at least the amount of the original contract price before commencing the construction of the im
provement under the direct contract. --PRECISE ANS---exempt



A copy the payment bond must be attached to the Notice of Commencement when it is .-
-PRECISE ANS---recorded



Anyone who willfully files a fraudulent lien as defined in 713.31 commits a felony of the degre
e --PRECISE ANS---third



When a construction project is "put out" for bid, the contractors are given the plans and specification
s for the project. If any deviations for these specifications occur, who will be held responsible and ma
y be required to correct them at their own expense? --PRECISE ANS---The contractor



The for a protect are interpreted as a legal document that specifically defines the responsibilit ies
of the owner and his representatives intended for the project and what the contractors responsibil ities
are. --PRECISE ANS---specifications



The CSI-
MASTERFORMAT divides the specifications into specific divisions to provide a standard ref
erence and filing numbers for bidding and contract forms. --PRECISE ANS---50



Which of the following would appear as a heading in the index of the General Clauses and Conditions
sections of General Requirements? --PRECISE ANS---
All of these ( General Conditions, Notice to Bidders and Proposal)



is the contractors price for performing the work as specified. --PRECISE ANS---
The proposal



"Contract Documents" "Insurance," "payments," and "Guarantee" are some typical items that would b
e included under what heading in the General Clauses and Conditions section? --PRECISE ANS---
General Conditions

Información del documento

Subido en
25 de junio de 2025
Número de páginas
9
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
kiarienaomi88
3.6
(28)
Vendido
211
Seguidores
11
Artículos
3911
Última venta
1 mes hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes