Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 21 páginas
Examen

CMRP Certified Maintenance and Reliability Professional Exam 2025

Document preview thumbnail
Vista previa 3 fuera de 21 páginas

3 Items Performance of an Asset is Based On - - 1. Inherent Reliability 2. Operating Environment 3. Maintenance Plan Benchmark - Maintenance Cost as % of RAV - -2% - 3% Benchmark - Maintenance Cost as % of RAV - -0.25% - 1.25% Benchmark - Schedule Compliance - -90% Benchmark - Percent of Planned Work - -85% Benchmark - Production/Operations Breakdown Losses - -1% - 2% Benchmark - Parts Stock Out Rate - -1% - 2% Leadership Attributes Survey - -Vision - 33% Energizing People - 31% Communication - 21% Competence - 8% Charisma - 7% Mission Statement Benefits (3) - - 1. Help companies focus their strategy by defining boundaries within which to operate 2. Define dimensions along which an organization performance is measured and judged 3. Suggest standards for individual ethical behavior 2 Key Elements of Successful Effort to Change Culture - - 1. Influencing behavior to change 2. Overcoming resistance to change Actions to Influence Change (6) - - 1. Increase understanding 2. Set goals and expectations 3. Establish a process for praise and recognition 4. Define and clarify roles 5. Establish and standardize process and procedures 6. Create discipline, develop tenacity, and be persistent CDC CMRP CDC Key Performance Indicators Attributes (3) - - 1. Encourage the right behavior 2. Difficult to manipulate 3. Easy to measure Condition Based Maintenance - -Vibration analysis Infrared thermography Acoustic/ultrasonic Oil analysis Electrical Shock pulse method Partial discharge and corona discharge Operational performance - pressure, temp, flow rates, etc. 3 Cautions with Preventive Maintenance - - 1. Intrusive inspections 2. Tasks must be reviewed frequently to determine accuracy 3. Equip,met is hazarded and frequently degraded by tasks Condition Based Maintenance Activities (3) - - 1. Condition Measurement 2. Condition monitoring and health assessment 3. Repair and maintenance actions Reliability Centered Maintenance - -A systematic, disciplined process to ensure safety, mission compliance, and system function Defines system boundaries and identifies system functions, functional failures, and likely failure modes for equipment and structures in a specific operating context 4 Essential Elements of RCM - - 1. Define system and required functions 2. Define functional failures and specific component failure modes that can defeat required functions 3. Prioritize the importance of the failure modes 4. Select the applicable and effective PM countermeasure for the high priority failure modes Key Players in the Work Process - -Coordinator - asset/resource Planner Scheduler Configuration specialist Craft supervisor Work performer Benchmark - % of Planned Work - - 90% CMRP CDC Benchmark - % of Schedule Compliance - - 85% Benchmark - % of Time the Right Part is Delivered - - 99% Economic Order Quantity - - 3 Key Parts of Asset Reliability - -Asset function Conditions under which Asset operates Mission time Reliabiltiy - -Probability that an item will perform its intended function for a specific interval under stated conditions Availability - -Function of reliability and maintainability Measured by degree to which an item or asset is an operable and committable state at the start of the mission when the mission is called at an unspecified time =MTBF/(MTBF+MTTR) Percentage of actual time that an asset is operated compared to how long it was scheduled to operate Cost Breakdown of Asset Life Cycle - -Design and development - 5-10% Installation - 10 -20% Operations and maintenance - 65 - 85% Disposal - 5% Key Elements of Reliability Specs - -Probability of successful performance Function to be performed Usage time Operating conditions Environment Skill or operators/maintainers Equipment Design Phase Analysis - -Reliability analysis Maintain ability analysis System safety and hazard analysis Human factors engineering analysis Logistics analysis Total Productive Maintenance Pillars (8) - - 1. Autonomous Maintenance 2. Focused Improvement 3. Planned maintenance 4. Quality maintenance 5. Training and development 6. Design and early equipment management 7. Office improvement CMRP CDC 8. Safety, health, and environment 5S Steps - -Sort Set in Order Shine Standardize Sustain (Safety) Overall Equipment Effectiveness (OEE) - -Availability x Performance x Quality Total Overall Equipment Effectiveness (TOEE) - -Utilization x availability x performance x quality Utilization - -Percentage of time equipment is used based on 24 hours per day and 365 days per year Reliability Centered Maintenance Principles - - 1. Primary objective is to preserve system functions 2. Identify failure modes that can defeat the functions 3. Prioritize function needs 4. Select applicable and effective tasks Primary Functions in RCM - -The reason the asset exists at all Secondary Functions in RCM - -Environmental integrity Safety/structural integrity Control/containment/comfort Appearance Protection Economic/efficiency Superfluous functions RCM 7 Critical Questions - -What are the functions? What are the functional failures? What are the failure modes? What are the failure effects? What are the failure consequences? What are the proactive tasks and task intervals? What are the default actions? RCM Analysis Process - -System selection and info collection System boundary definition System description and functional block diagram System functions and functional failures Failure Mode and Effects Analysis (FMEA) CMRP Logic Tree Analysis Selection of Maintenance Tasks Task packaging and implementation Continuous improvement RCM Benefits - -Reliability Cost Documentation Equipment/parts replacement Efficiency/productivity Broadband Vibration Analysis - -Broad view of machines vibration Total vibration of a machine Narrow bend trending Vibration Analysis - -Monitors total energy for a specific bandwidth of vibration frequencies More specific Signature Vibration Analysis - -Provides visual representation of each frequency component generated by a machine Ultrasonic Testing - -Leak detecti

Vista previa del contenido

CMRP



CMRP Certified Maintenance and
Reliability Professional Exam 2025

3 Items Performance of an Asset is Based On - -
1. Inherent Reliability
2. Operating Environment
3. Maintenance Plan

Benchmark - Maintenance Cost as % of RAV - -2% - 3%

Benchmark - Maintenance Cost as % of RAV - -0.25% - 1.25%

Benchmark - Schedule Compliance - ->90%

Benchmark - Percent of Planned Work - ->85%

Benchmark - Production/Operations Breakdown Losses - -1% - 2%

Benchmark - Parts Stock Out Rate - -1% - 2%

Leadership Attributes Survey - -Vision - 33%
Energizing People - 31%
Communication - 21%
Competence - 8%
Charisma - 7%

Mission Statement Benefits (3) - -
1. Help companies focus their strategy by defining boundaries within which to operate
2. Define dimensions along which an organization performance is measured and judged
3. Suggest standards for individual ethical behavior

2 Key Elements of Successful Effort to Change Culture - -
1. Influencing behavior to change
2. Overcoming resistance to change

Actions to Influence Change (6) - -
1. Increase understanding
2. Set goals and expectations
3. Establish a process for praise and recognition
4. Define and clarify roles
5. Establish and standardize process and procedures
6. Create discipline, develop tenacity, and be persistent


CDC

,CMRP


Key Performance Indicators Attributes (3) - -
1. Encourage the right behavior
2. Difficult to manipulate
3. Easy to measure

Condition Based Maintenance - -Vibration analysis
Infrared thermography
Acoustic/ultrasonic
Oil analysis
Electrical
Shock pulse method
Partial discharge and corona discharge
Operational performance - pressure, temp, flow rates, etc.

3 Cautions with Preventive Maintenance - -
1. Intrusive inspections
2. Tasks must be reviewed frequently to determine accuracy
3. Equip,met is hazarded and frequently degraded by tasks

Condition Based Maintenance Activities (3) - -
1. Condition Measurement
2. Condition monitoring and health assessment
3. Repair and maintenance actions

Reliability Centered Maintenance - -A systematic, disciplined process to ensure safety,
mission compliance, and system function
Defines system boundaries and identifies system functions, functional failures, and
likely failure modes for equipment and structures in a specific operating context

4 Essential Elements of RCM - -
1. Define system and required functions
2. Define functional failures and specific component failure modes that can defeat
required functions
3. Prioritize the importance of the failure modes
4. Select the applicable and effective PM countermeasure for the high priority failure
modes

Key Players in the Work Process - -Coordinator - asset/resource
Planner
Scheduler
Configuration specialist
Craft supervisor
Work performer

Benchmark - % of Planned Work - -> 90%



CDC

, CMRP


Benchmark - % of Schedule Compliance - -> 85%

Benchmark - % of Time the Right Part is Delivered - -> 99%

Economic Order Quantity - -

3 Key Parts of Asset Reliability - -Asset function
Conditions under which Asset operates
Mission time

Reliabiltiy - -Probability that an item will perform its intended function for a specific
interval under stated conditions

Availability - -Function of reliability and maintainability
Measured by degree to which an item or asset is an operable and committable state at
the start of the mission when the mission is called at an unspecified time
=MTBF/(MTBF+MTTR)
Percentage of actual time that an asset is operated compared to how long it was
scheduled to operate

Cost Breakdown of Asset Life Cycle - -Design and development - 5-10%
Installation - 10 -20%
Operations and maintenance - 65 - 85%
Disposal - <5%

Key Elements of Reliability Specs - -Probability of successful performance
Function to be performed
Usage time
Operating conditions
Environment
Skill or operators/maintainers

Equipment Design Phase Analysis - -Reliability analysis
Maintain ability analysis
System safety and hazard analysis
Human factors engineering analysis
Logistics analysis

Total Productive Maintenance Pillars (8) - -
1. Autonomous Maintenance
2. Focused Improvement
3. Planned maintenance
4. Quality maintenance
5. Training and development
6. Design and early equipment management
7. Office improvement


CDC

Información del documento

Subido en
25 de junio de 2025
Número de páginas
21
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$28.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
AlexScorer
2.5
(2)
Vendido
10
Seguidores
0
Artículos
1813
Última venta
2 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes