BECC Mod 4 (2025) EXAM QUESTIONS AND ALL
CORRECT ANSWERS 100% SOLVED AND
GUARANTEED SUCCESS!!
Save
Terms in this set (124)
Firemain system originates Seachest
below the waterline with
the
What monitoring method local
must the assigned
watchstander notify DCC
that the firepump is
aligned for operation
what firemain system uses single
a main that extends
forward and aft on the
damage control deck
how are the mains vertically and horizontally
separated on the vertical
offset loop system
the composite firemain 2 mains
system contains ....
installed on the damage
control deck and
separated athwartships
https://quizlet.com/1056811910/becc-mod-4-2025-exam-questions-and-all-correct-answers-100-solved-and-guaranteed-success-flash-cards/?new 1/13
, 25/06/2025, 09:52 BECC Mod 4 (2025) EXAM QUESTIONS AND ALL CORRECT ANSWERS 100% SOLVED AND GUARANTEED SUCCESS!! Flas…
what drainage system is main
used for dewatering main
machinery spaces
the secondary drainage forward and aft
system is used for
dewatering spaces .... of
the machinery
compartments
special drainage are used gravity flow
for .... spaces
who must give permission EDO
for eductor operation
while inport?
Who gives permission for EOOW
eductor operation
underway?
What term defines the stability
tendency for the ship to
remain upright at sea
level?
what device is used to clinometer
check ship stability
what term defines a list
persisting heel brought by
instability
what repair party locker is Repair 1
assigned as the main deck
repair party?
what repair party locker is repair 5
responsible for
maintaining ship
propulsion equipment
https://quizlet.com/1056811910/becc-mod-4-2025-exam-questions-and-all-correct-answers-100-solved-and-guaranteed-success-flash-cards/?new 2/13