100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Asphalt and Concrete UPDATED ACTUAL Exam Questions and CORRECT Answers

Puntuación
-
Vendido
-
Páginas
5
Grado
A+
Subido en
24-06-2025
Escrito en
2024/2025

Asphalt and Concrete UPDATED ACTUAL Exam Questions and CORRECT Answers

Institución
Asphalt
Grado
Asphalt

Vista previa del contenido

Asphalt and Concrete UPDATED ACTUAL Exam Questions and
CORRECT Answers


What is the estimated batching production in cy/hr? - 201.6



A concrete batch plant has a batching chamber capacity of 11 cy and an average batching cycle
time of 2 min. Plant efficiency is 80%. What is the estimated batching production in cy/hr? - 264



A concrete batch plant has a batching chamber capacity of 12.5 cy and an average batching cycle
time of 3 min. Plant efficiency is 84%.



What is the estimated batching production in cy/hr? - 210


A batch plant mixes 12 tons of asphalt mix with an average mixing cycle of 1.5 min. Plant
efficiency is 92%. Estimate plant production in ton/hr - 441.6


A batch plant mixes 5 tons of asphalt mix with an average mixing cycle of 1 min. Plant
efficiency is 95%. Estimate plant production in ton/hr. - 285


A specification requires a residual application rate of 0.045 gal/sy. The distributor spray bar
coverage is 8 ft. Estimate the gallons of emulsion needed for a 16 ft wide 2-mile stretch of
paving. - 845 gallons


A specification requires a residual application rate of 0.03 gal/sy. The distributor spray bar
coverage is 6 ft. Estimate the gallons of emulsion needed for a 12 ft wide and 2,200 ft stretch of
paving. - 88 gallons



What is the surface treatment area for the first and second course (sy)? Note: the numbers are the
same - do not add them together. - 4878 sy

, According to the project General Notes, you cannot place the seal coat asphalt between which
period of time? - Sep 1st to April 30



Can flat wheel rollers be used on this project? - No



What is the asphalt rate basis of estimate for the prime coat (gal/sy)? - 0.2


What is the surface treatment basis of estimate asphalt (AC-20-5TR) rate for the first course
ONLY (gal/sy)? - 0.55


By holding several loads of asphalt concrete, the material transfer device increases surge loading
of the paver. - False


Environmental concerns over the volatile organic compounds released during blending have
diminished the use of cutbacks. - True



The prime coat acts as a waterproof barrier, preventing moisture that penetrates the wearing
surface from reaching the base. - True



The ground track pressure of the paver is typically in the range of 50 to 60 psi. - False


Concrete mixer's cycle time is composed of loading time, mixing time, and discharging time. -
True



Properly constructed pavements should have a maximum 92% in-place density. - False


When necessary, rounded aggregates can be crushed to create more angular surfaces. - True

Escuela, estudio y materia

Institución
Asphalt
Grado
Asphalt

Información del documento

Subido en
24 de junio de 2025
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$13.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
GradeVaultAcademy

Documento también disponible en un lote

Conoce al vendedor

Seller avatar
GradeVaultAcademy Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2
Miembro desde
8 meses
Número de seguidores
0
Documentos
841
Última venta
5 meses hace
GradeVault Academy.

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes