1. Quality assurance is defined as plans or action taken by an agency that provides con-
fidence that a product or service with be satisfacto-
ry/adequate
I-15
2. A Quality Assurance program serves the framework necessary for construction Quality As-
as surance implementation
I-18
3. The making and revision of QA specs agency and industry personnel (engineers, inspec-
should include... tors, technicians)
I-19
4. The 6 elements used in "design bid True
build" QA programs are the same as I-22
"Design build" construction QA pro-
grams
5. Quality control activities include... Sampling, testing and visual inspection
I-24
6. QC plans ... -are Project Specific
- Address specific processes for individual categories
of work on a construction process
I-25
7. Acceptance is the responsibility of ... the transportation agency
I-26
8. Engineering limits are ... the absolute threshold values for individual test re-
sults
I-29
, Nettcp Training
Study online at https://quizlet.com/_97xmfd
9. QA specs use Quality measures
I-28
10. The purpose of IA is to... identify discrepancies or differences in testing proce-
dures or equipment
I-34
11. IA comparison is performed on ... split samples
I-34
12. If contractor QC test results are not a dispute resolution system is not needed
used in acceptance... I-35
13. All agency central labs are ... required to be accredited through AASHTO accredita-
tion program AAP
14. Qualification/certification personnel required to re-cert every 2-5 yrs
should be... I-40
15. Each agency construction QA pro- 23 CFR 637B and is required to be approved by
gram must meet FHWA
I-41
16. The D-3665 Random number table 10000 numbers from 0.0000 to 1
contains... II-4
17. The purpose of random numbers is help the sampler obtain unbiased samples
to... I-1
18. A lot is... an isolated quantity of materials from one source that
is assumed to be produced and placed by the same
process
II-2
Nettcp Training
SOLUTION GUIDE (A+ GRADED 100% VERIFIED) LATEST VERSION
Study online at https://quizlet.com/_97xmfd
2025!!
1. Quality assurance is defined as plans or action taken by an agency that provides con-
fidence that a product or service with be satisfacto-
ry/adequate
I-15
2. A Quality Assurance program serves the framework necessary for construction Quality As-
as surance implementation
I-18
3. The making and revision of QA specs agency and industry personnel (engineers, inspec-
should include... tors, technicians)
I-19
4. The 6 elements used in "design bid True
build" QA programs are the same as I-22
"Design build" construction QA pro-
grams
5. Quality control activities include... Sampling, testing and visual inspection
I-24
6. QC plans ... -are Project Specific
- Address specific processes for individual categories
of work on a construction process
I-25
7. Acceptance is the responsibility of ... the transportation agency
I-26
8. Engineering limits are ... the absolute threshold values for individual test re-
sults
I-29
, Nettcp Training
Study online at https://quizlet.com/_97xmfd
9. QA specs use Quality measures
I-28
10. The purpose of IA is to... identify discrepancies or differences in testing proce-
dures or equipment
I-34
11. IA comparison is performed on ... split samples
I-34
12. If contractor QC test results are not a dispute resolution system is not needed
used in acceptance... I-35
13. All agency central labs are ... required to be accredited through AASHTO accredita-
tion program AAP
14. Qualification/certification personnel required to re-cert every 2-5 yrs
should be... I-40
15. Each agency construction QA pro- 23 CFR 637B and is required to be approved by
gram must meet FHWA
I-41
16. The D-3665 Random number table 10000 numbers from 0.0000 to 1
contains... II-4
17. The purpose of random numbers is help the sampler obtain unbiased samples
to... I-1
18. A lot is... an isolated quantity of materials from one source that
is assumed to be produced and placed by the same
process
II-2