100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

PMD PRO LEVEL 1 EXAM 2025 QUESTIONS AND ANSWERS

Puntuación
-
Vendido
-
Páginas
10
Grado
A+
Subido en
16-06-2025
Escrito en
2024/2025

Compared with projects managed by organizations working in the commercial sector, what characteristic is unique to managing projects in the international development sector organizations? - ANS Projects aspire to social and behavioral changes that improve target population well-being What is the correct sequence for different phases in the PMD Pro Project Phase Model? - ANS Project identification and design Project set up Project planning Project implementation Which phase is continually present throughout the entirety of the PMD Pro Project Phase Model? - ANS Project Monitoring, Evaluation, and Control How many phases are there in the PMD Pro Project Phase Model for the international development sector? - ANS 6 Which best describes the relationship between Project Management and Design, Monitoring, and Evaluation (DM&E)? - ANS While strong DM&E is a necessary component of a project management system, it is not sufficient to ensure project success PMD PRO LEVEL 1 EXAM 2025 QUESTIONS AND ANSWERS COPYRIGHT © 2025 THESTAR ALL RIGHTS RESERVED 2 What area tends to be a relative weakness of a projet manager's in the international development sector? - ANS Establishing a balanced approach to project management through all phases of the life of a project What term defines the amount of time that a task in a project network diagram can be delayed by without causing a delay to the project? - ANS Float What are responsibilities of a project manager? - ANS Ensuring the success of the project Working with an array of stakeholders to complete the work of the projects Resolving internal conflicts among the project team The _______ competency area includes the knowledge, skills, and behaviors required to identify, select, and employ the right tools and processes to ensure project management success. - ANS Technical What is an example of a "technical" competency required of project managers? - ANS The ability to define and collect information and data (metrics) to monitor project process What are the three most important factors that determine the skill level a project manager requires to effectively manage a project? - ANS Size Complexity Risk of Project Which analysis tool is sometimes replaced by assets-based approach? - ANS Problem analysis The discipline of _______ management focuses on selecting, initiating, and managing the overall collection of

Mostrar más Leer menos
Institución
PMD PRO
Grado
PMD PRO









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PMD PRO
Grado
PMD PRO

Información del documento

Subido en
16 de junio de 2025
Número de páginas
10
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PMD PRO LEVEL 1 EXAM 2025
QUESTIONS AND ANSWERS



Compared with projects managed by organizations working in the commercial sector, what
characteristic is unique to managing projects in the international development sector
organizations? - ANS Projects aspire to social and behavioral changes that improve target
population well-being


What is the correct sequence for different phases in the PMD Pro Project Phase Model? -
ANS Project identification and design
Project set up
Project planning
Project implementation


Which phase is continually present throughout the entirety of the PMD Pro Project Phase
Model? - ANS Project Monitoring, Evaluation, and Control


How many phases are there in the PMD Pro Project Phase Model for the international
development sector? - ANS 6


Which best describes the relationship between Project Management and Design, Monitoring,
and Evaluation (DM&E)? - ANS While strong DM&E is a necessary component of a project
management system, it is not sufficient to ensure project success




COPYRIGHT © 2025 THESTAR ALL RIGHTS RESERVED 1

, What area tends to be a relative weakness of a projet manager's in the international
development sector? - ANS Establishing a balanced approach to project management
through all phases of the life of a project


What term defines the amount of time that a task in a project network diagram can be delayed
by without causing a delay to the project? - ANS Float



What are responsibilities of a project manager? - ANS Ensuring the success of the project
Working with an array of stakeholders to complete the work of the projects
Resolving internal conflicts among the project team


The _______ competency area includes the knowledge, skills, and behaviors required to
identify, select, and employ the right tools and processes to ensure project management
success. - ANS Technical



What is an example of a "technical" competency required of project managers? - ANS The
ability to define and collect information and data (metrics) to monitor project process


What are the three most important factors that determine the skill level a project manager
requires to effectively manage a project? - ANS Size
Complexity
Risk of Project



Which analysis tool is sometimes replaced by assets-based approach? - ANS Problem analysis


The discipline of _______ management focuses on selecting, initiating, and managing the
overall collection of projects in a way that addresses the strategic objectives of the
organization. - ANS Portfolio




COPYRIGHT © 2025 THESTAR ALL RIGHTS RESERVED 2
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TheStar Florida State University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
588
Miembro desde
1 año
Número de seguidores
178
Documentos
23565
Última venta
17 horas hace
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

117 reseñas

5
56
4
21
3
20
2
3
1
17

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes