Which agency approves a site-specific variance which allows for an alternative method of construction or monitoring: a.) The Regional Water Quality Board b.) The State Water Resources Control Board c.) The Department of Toxic Substance Control d.) The local agency - ANS a.) The Regional Water Quality Board CCR Title 23, Sec 2681(a) The regulations to enforce compliance of underground storage tank systems in the state are found in? a.) Code of Federal Regulations, 40 CFR Part 281 b.) California Code of Regulations, Title 23, Chapter 16 c.) Code of Federal Regulations, 40 CFR Part 280 d.) California Code of Regulations, Title 23, Chapter 17 - ANS b.) California Code of Regulations; Title 23, Chapter 16 By definition an "underground storage tank system" includes a.) The tank, all connected piping and dispensers b.) The tank, all connected piping, ancillary equipment and containment system c.) Only the tank ICC CALIFORNIA UST INSPECTOR EXAM 2025 QUESTIONS AND ANSWERS COPYRIGHT © 2025 THESTAR ALL RIGHTS RESERVED 2 d.) Only tanks totally beneath the surface of the ground - ANS b.) The tank, all connected piping, ancillary equipment and containment system (H&SC, Sec 25281(z)) The written report submitted to the local agency after an unauthorized release is required to include the following except: a.) Description of actions taken to stop the release b.) Cause of the release c.) Method of disposal of released product d.) Date on which the release was discovered - ANS b.) Cause of the release CCR Title 23, Sec 2652(c) An unauthorized release which does not escape from secondary containment only requires a record on the operator's monitoring reports provided: A. It did not increase the hazard of fire B. It did not cause any deterioration of the secondary containment C. It was cleaned up within 8 hours of detection D. All of the above - ANS D. All of the above H&SC, Sec 25294 The annual monitoring certification may be performed by: A. A person possessing the appropriate contractors licenses B. An individual trained and certified by the manufacturer of the monitoring equipment C. A designated UST operator D. A person who meets the requirements of both a and b - ANS D. A person who meets the requirements of both a and b CCR Title 23, Sec 2715(i) COPYRIGHT © 2025 THESTAR ALL RIGHTS RESERVED 3 When an automatic tank gauge is utilized for single-walled tank leak detection, it shall generate a post-test hard copy data report of the following information, except: a.) Liquid volume b.) Fuel depth c.) Outside air temperature d.) Time and date of test - ANS c.) Outside air temperature CCR Title 23, Sec 2643(b)(1) If a UST system is utilizing an overfill alarm, the alarm must be triggered to alert the transfer operator when the tank is no more than ___________ full a.) 85% b.) 95% c.) 90% d.) 80% - ANS c.) 90% An automatic tank gauge is utilized for leak detection of the ______________. a.) Tank b.) Tank and Piping c.) Piping d.) Interstitial space - ANS a.) Tank CCR Title 23, Sec 2643(b)(1) After completion of enhanced leak detection (ELD) test, the ELD test results must be submitted to the _________________. a.) The local agency b.) The SWRCB c.) Owner of the UST system d.) To both the SWRCB and the local agency - ANS d.) To both the SWRCB and the local agency COPYRIGHT © 2025 THESTAR ALL RIGHTS RESERVED 4 CCR Title 23, Sec 2644.1(a)(5) A permit to operate a UST system must have all of the following listed on the permit, EXCEPT: a.) The state UST identification number(s) b.) Name of the tank manufacturer and tank capacity c.) Permit expiration date d.) Monitoring requirements - ANS b.) Name of the tank manufacturer and tank capacity CCR Title 23, Sec 2712(c) A temporary closure is appropriate for which of the following: a.) The UST system is empty and will be removed from service indefinitely b.) The UST system has ceased to store hazardous materials but will be used within the next 12 consecutive months c.) The UST system is unable to meet compliance requirements and will be removed d.) The UST system has been red-tagged - ANS b.) The UST system has ceased to store hazardous materials but will be used within the next 12 consecutive months CCR Title 23, Sec 2671 & 2670 A local agency determines that a UST facility within the last year had compliance issues. Prior to issuing a new permit or renewal to operate an UST the local agency shall: a.) Ask the state to assist in a joint inspection b.) Request the owner/operator to submit a "Return to Compliance" form. c.) Refer to a District Attorney Investigator d.) Inspect the facility and determine compliance - ANS d.) Inspect the facility and determine compliance CCR Title 23, Sec

Mostrar más Leer menos
Institución
ICC CALIFORNIA UST INSPECTOR
Grado
ICC CALIFORNIA UST INSPECTOR











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ICC CALIFORNIA UST INSPECTOR
Grado
ICC CALIFORNIA UST INSPECTOR

Información del documento

Subido en
15 de junio de 2025
Número de páginas
135
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

ICC CALIFORNIA UST
INSPECTOR EXAM 2025 QUESTIONS
AND ANSWERS



Which agency approves a site-specific variance which allows for an alternative method of
construction or monitoring:
a.) The Regional Water Quality Board
b.) The State Water Resources Control Board
c.) The Department of Toxic Substance Control

d.) The local agency - ANS a.) The Regional Water Quality Board
CCR Title 23, Sec 2681(a)


The regulations to enforce compliance of underground storage tank systems in the state are
found in?
a.) Code of Federal Regulations, 40 CFR Part 281
b.) California Code of Regulations, Title 23, Chapter 16
c.) Code of Federal Regulations, 40 CFR Part 280

d.) California Code of Regulations, Title 23, Chapter 17 - ANS b.) California Code of
Regulations; Title 23, Chapter 16


By definition an "underground storage tank system" includes
a.) The tank, all connected piping and dispensers
b.) The tank, all connected piping, ancillary equipment and containment system
c.) Only the tank

COPYRIGHT © 2025 THESTAR ALL RIGHTS RESERVED
1

,d.) Only tanks totally beneath the surface of the ground - ANS b.) The tank, all connected
piping, ancillary equipment and containment system


(H&SC, Sec 25281(z))


The written report submitted to the local agency after an unauthorized release is required to
include the following except:
a.) Description of actions taken to stop the release
b.) Cause of the release
c.) Method of disposal of released product

d.) Date on which the release was discovered - ANS b.) Cause of the release
CCR Title 23, Sec 2652(c)


An unauthorized release which does not escape from secondary containment only requires a
record on the operator's monitoring reports provided:
A. It did not increase the hazard of fire
B. It did not cause any deterioration of the secondary containment
C. It was cleaned up within 8 hours of detection

D. All of the above - ANS D. All of the above
H&SC, Sec 25294


The annual monitoring certification may be performed by:
A. A person possessing the appropriate contractors licenses
B. An individual trained and certified by the manufacturer of the monitoring equipment
C. A designated UST operator

D. A person who meets the requirements of both a and b - ANS D. A person who meets the
requirements of both a and b
CCR Title 23, Sec 2715(i)



COPYRIGHT © 2025 THESTAR ALL RIGHTS RESERVED
2

,When an automatic tank gauge is utilized for single-walled tank leak detection, it shall generate
a post-test hard copy data report of the following information, except:
a.) Liquid volume
b.) Fuel depth
c.) Outside air temperature

d.) Time and date of test - ANS c.) Outside air temperature
CCR Title 23, Sec 2643(b)(1)


If a UST system is utilizing an overfill alarm, the alarm must be triggered to alert the transfer
operator when the tank is no more than ___________ full
a.) 85%
b.) 95%
c.) 90%

d.) 80% - ANS c.) 90%


An automatic tank gauge is utilized for leak detection of the ______________.
a.) Tank
b.) Tank and Piping
c.) Piping

d.) Interstitial space - ANS a.) Tank
CCR Title 23, Sec 2643(b)(1)


After completion of enhanced leak detection (ELD) test, the ELD test results must be submitted
to the _________________.
a.) The local agency
b.) The SWRCB
c.) Owner of the UST system

d.) To both the SWRCB and the local agency - ANS d.) To both the SWRCB and the local
agency

COPYRIGHT © 2025 THESTAR ALL RIGHTS RESERVED
3

, CCR Title 23, Sec 2644.1(a)(5)


A permit to operate a UST system must have all of the following listed on the permit, EXCEPT:
a.) The state UST identification number(s)
b.) Name of the tank manufacturer and tank capacity
c.) Permit expiration date

d.) Monitoring requirements - ANS b.) Name of the tank manufacturer and tank capacity
CCR Title 23, Sec 2712(c)


A temporary closure is appropriate for which of the following:
a.) The UST system is empty and will be removed from service indefinitely
b.) The UST system has ceased to store hazardous materials but will be used within the next 12
consecutive months
c.) The UST system is unable to meet compliance requirements and will be removed

d.) The UST system has been red-tagged - ANS b.) The UST system has ceased to store
hazardous materials but will be used within the next 12 consecutive months
CCR Title 23, Sec 2671 & 2670


A local agency determines that a UST facility within the last year had compliance issues. Prior to
issuing a new permit or renewal to operate an UST the local agency shall:
a.) Ask the state to assist in a joint inspection
b.) Request the owner/operator to submit a "Return to Compliance" form.
c.) Refer to a District Attorney Investigator

d.) Inspect the facility and determine compliance - ANS d.) Inspect the facility and determine
compliance
CCR Title 23, Sec 2712(c)


All the following components require third party certification, except:
a.) Automatic tank gauging systems

COPYRIGHT © 2025 THESTAR ALL RIGHTS RESERVED
4
$14.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TheStar Florida State University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
611
Miembro desde
2 año
Número de seguidores
179
Documentos
24416
Última venta
4 días hace
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

122 reseñas

5
58
4
22
3
21
2
4
1
17

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes