Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

CEM 301 CE 322 EXAM 2 QUESTIONS AND ANSWERS

Puntuación
-
Vendido
-
Páginas
14
Grado
A+
Subido en
13-06-2025
Escrito en
2024/2025

CEM 301 / CE 322 EXAM 2 QUESTIONS AND ANSWERS risks take many forms including (select all that apply): a) schedule b) safety c) costs d) specifications e) weather - CORRECT ANSWERa) schedule b) safety c) costs e) weather

Mostrar más Leer menos
Institución
CEM 301 / CE 322
Grado
CEM 301 / CE 322

Vista previa del contenido

CEM 301 / CE 322 EXAM 2 QUESTIONS AND ANSWERS
risks take many forms including (select all that apply):

a) schedule

b) safety

c) costs

d) specifications

e) weather - CORRECT ANSWER✅✅✅a) schedule

b) safety

c) costs

e) weather



% complete equation - CORRECT ANSWER✅✅✅units complete / total units



time ratio equation - CORRECT ANSWER✅✅✅time elapsed / total duration



cost (man hour) - CORRECT ANSWER✅✅✅cost to date / total budget



name the 6 project controls - CORRECT ANSWER✅✅✅1. units completed

2. cost (man hour) or time ratio

3. start - finish method

4. supervisor's opinion

5. incremental milestone

6. weighted / equivalent units



t/f when a project is updated, the critical path may change in route or length - CORRECT
ANSWER✅✅✅true



t/f an engineering design firm does not need to know how to control a project (the develop of a building
or highway) - CORRECT ANSWER✅✅✅false

, project controls include of these except:

a) incremental milestones

b) superintendent opinion

c) owner's opinion

d) time or cost ratio - CORRECT ANSWER✅✅✅c) owner's opinion



supervisor's opinion of percent complete is a _____ measure - CORRECT ANSWER✅✅✅subjective



an example of units completed measures is:

a) inches over foot

b) roof over foundation

c) CYDs excavated over total CYDs planned

d) feet over mile - CORRECT ANSWER✅✅✅c) CYDs excavated over total CYDs planned



define project planning and scheduling. differentiate between the two terms. - CORRECT
ANSWER✅✅✅project planning - process of developing a course of action to achieve the required
objectives to complete a project (i.e. what action is needed to carry out the goal of the project?)



scheduling - part of project planning for determining the time and sequence of operations for the given
project (i.e. how to carry out the project)



define project. what makes planning and scheduling construction projects different from general
planning? - CORRECT ANSWER✅✅✅def: a temporary endeavor undertaken to create a unique
product, service, or result



all projects will have a starting and ending point and a desirable product or service that is unique, that
makes planning and scheduling of a construction project different form general planning



what is project control? why is it important? - CORRECT ANSWER✅✅✅this is done as the project is
running to keep the project in lines with the plan and schedule. once the project has started, this is

Escuela, estudio y materia

Institución
CEM 301 / CE 322
Grado
CEM 301 / CE 322

Información del documento

Subido en
13 de junio de 2025
Número de páginas
14
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$12.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
STANGRADES Stanford University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
90
Miembro desde
1 año
Número de seguidores
1
Documentos
12011
Última venta
1 día hace
STAN-GRADES

EXCELLENCY IN ACADEMIC MATERIALS

3.4

14 reseñas

5
6
4
1
3
3
2
1
1
3

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes