ICC Vapor Recovery 1 Exam with best question and verified graded A+answers 1. Which of the following is not considered "hanging hardware"? a. nozzle b. swivel c. whip hose d. shear valve: d. shear valve 2. Per Executive Order. VR-201-E, if the dispensing vacuum of the Healy VP-1000 pump is below inches of WC, the dispenser should be removed from service. A. 50 B. 60 C. 75 D. 100: B. 60 3. In a coaxial hose for a balance system, the product flows through the ? A. the belllows B. the inner hose C. the outer hose D. both hoses: B. the inner hose 4. Per the Vapor Recovery Equipment Defects List (VRED), the of any component required to be used by the system's EO. Is not considered a defect.