Project Delivery System - CORRECT ANSWERS.️️How team members are organized, establishes when parties engage, determines roles of parties, and determines sequence of design, procurement, and construction (db, cmar, dbb) Procurement Method - CORRECT ANSWERS.️️how team members are selected (QBS, best value, low price, sole source) contracting approach - CORRECT ANSWERS.️️how team members are paid (fp, gmp, cost reimbursement, target price, unit price) Design-Bid-Build (DBB) - CORRECT ANSWERS.️️linear, sequential process, A/E selected on qualifications, GC selected on low price, design is fully completed without input from GC, A/E acting in owner's interests, with a historically strong bond, process is well-established and understood construction manager at risk - CORRECT ANSWERS.️️similar org structure to DBB, construction manager selected by QBS or best value, contractor provides precon services, negotiated gmp contracting approach, open book estimating process, potential to fast track project, construction cost determined before design completed, potential issues over what is reasonably inferable from gmp design documents Design-Build - CORRECT ANSWERS.️️The owner contracts with one entity (a person or firm) to provide both design and construction services, designer and contractor have a direct contractual relationship, selected by QBS or best value, wide spectrum of contracting approaches and organizational structures, single point responsibility, owner does not manage designer, owner exposure to claims is significantly reduced engineer procure construct (epc) - CORRECT ANSWERS.️️similar to design build, in industrial and power generation sectors, systems and performance testing are central to scope, contractor will typically perform engineering with its in-house staff, owner has need for single point responsibility, contracts include plant and process performance guarantees, contract items include performance and schedule liquidated damages and limitations of liability Multiple Prime Contracting - CORRECT ANSWERS.️️owner contracts with multiple trade contractors, attributes are typically similar to dbb, owner's ability to schedule and coordinate the work Integrated Project Delivery (IPD) - CORRECT ANSWERS.️️multi-party agreement - all parties equal, QBS procurement and target pricing contract approach, private sector use (limited at this time), key: owner's ability to accept risk public-private partnership (p3) - CORRECT ANSWERS.️️Instead of government building and maintaining major infrastructure (such as highway, water treatment plant), build and maintenance is outsourced to a private company. Opposed by public sector unions. this is not considered a delivery system but its underlying approaches are delivery systems and typically use DB. multiple procurement and contracting approaches shift left - CORRECT ANSWERS.️️intense efforts to establish scope early in the process; drives early team formation to include key trade subcontractors; can enable big decisions to be made early, affect project outcomes at lowest cost, establish a need for co-location and collaboration, and compress time during concurrent design and construction traditional design build - CORRECT ANSWERS.️️typically two-phase best value procurement with lump sum contract; owner defines project requirements and scope of prescriptive work; use of performance-based technical requirements with limited prescriptive specifications progressive design build - CORRECT ANSWERS.️️design and price are progressively developed after the design-builder is under contract; final project cost and schedule commitment is not established as part of the selection process; two phases: preliminary services and final design and construction services criteria documents - CORRECT ANSWERS.️️describe the end result bridging documents - CORRECT ANSWERS.️️prescribes how to achieve the end result design bid build paradigm - CORRECT ANSWERS.️️prior to bidding, owner undertakes a process to design the project and all of its details to 100% complete plans and specs. the owner is therefore responsible for success or failure of details of the design, and warrants the sufficiency of design to the contractor. the owner is therefore liable to the contractor for any gaps between plans and specifications and owner's requirements for project performance

Mostrar más Leer menos
Institución
DBIA
Grado
DBIA










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
DBIA
Grado
DBIA

Información del documento

Subido en
4 de junio de 2025
Número de páginas
18
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

STUDYSAGE



DBIA TEST EXAM|COMPLETE STUDY
GUIDE WITH HIGH YIELD QUESTIONS
AND 100% RIGHT/VERIFIED
ANSWERS|ALREADY GRADED A|GET A
PASS ON YOUR FIRST TRIAL
Project Delivery System - CORRECT ANSWERS.✔️✔️How team members are
organized, establishes when parties engage, determines roles of parties, and
determines sequence of design, procurement, and construction (db, cmar, dbb)


Procurement Method - CORRECT ANSWERS.✔️✔️how team members are
selected (QBS, best value, low price, sole source)


contracting approach - CORRECT ANSWERS.✔️✔️how team members are paid
(fp, gmp, cost reimbursement, target price, unit price)


Design-Bid-Build (DBB) - CORRECT ANSWERS.✔️✔️linear, sequential process, A/E
selected on qualifications, GC selected on low price, design is fully completed
without input from GC, A/E acting in owner's interests, with a historically strong
bond, process is well-established and understood


construction manager at risk - CORRECT ANSWERS.✔️✔️similar org structure to
DBB, construction manager selected by QBS or best value, contractor provides
precon services, negotiated gmp contracting approach, open book estimating
process, potential to fast track project, construction cost determined before
design completed, potential issues over what is reasonably inferable from gmp
design documents




SUCCESS

,STUDYSAGE


Design-Build - CORRECT ANSWERS.✔️✔️The owner contracts with one entity (a
person or firm) to provide both design and construction services, designer and
contractor have a direct contractual relationship, selected by QBS or best value,
wide spectrum of contracting approaches and organizational structures, single
point responsibility, owner does not manage designer, owner exposure to claims
is significantly reduced


engineer procure construct (epc) - CORRECT ANSWERS.✔️✔️similar to design
build, in industrial and power generation sectors, systems and performance
testing are central to scope, contractor will typically perform engineering with its
in-house staff, owner has need for single point responsibility, contracts include
plant and process performance guarantees, contract items include performance
and schedule liquidated damages and limitations of liability


Multiple Prime Contracting - CORRECT ANSWERS.✔️✔️owner contracts with
multiple trade contractors, attributes are typically similar to dbb, owner's ability
to schedule and coordinate the work


Integrated Project Delivery (IPD) - CORRECT ANSWERS.✔️✔️multi-party
agreement - all parties equal, QBS procurement and target pricing contract
approach, private sector use (limited at this time), key: owner's ability to accept
risk


public-private partnership (p3) - CORRECT ANSWERS.✔️✔️Instead of government
building and maintaining major infrastructure (such as highway, water treatment
plant), build and maintenance is outsourced to a private company. Opposed by
public sector unions. this is not considered a delivery system but its underlying
approaches are delivery systems and typically use DB. multiple procurement and
contracting approaches




SUCCESS

, STUDYSAGE


shift left - CORRECT ANSWERS.✔️✔️intense efforts to establish scope early in the
process; drives early team formation to include key trade subcontractors; can
enable big decisions to be made early, affect project outcomes at lowest cost,
establish a need for co-location and collaboration, and compress time during
concurrent design and construction


traditional design build - CORRECT ANSWERS.✔️✔️typically two-phase best value
procurement with lump sum contract; owner defines project requirements and
scope of prescriptive work; use of performance-based technical requirements
with limited prescriptive specifications


progressive design build - CORRECT ANSWERS.✔️✔️design and price are
progressively developed after the design-builder is under contract; final project
cost and schedule commitment is not established as part of the selection process;
two phases: preliminary services and final design and construction services


criteria documents - CORRECT ANSWERS.✔️✔️describe the end result


bridging documents - CORRECT ANSWERS.✔️✔️prescribes how to achieve the
end result


design bid build paradigm - CORRECT ANSWERS.✔️✔️prior to bidding, owner
undertakes a process to design the project and all of its details to 100% complete
plans and specs. the owner is therefore responsible for success or failure of
details of the design, and warrants the sufficiency of design to the contractor. the
owner is therefore liable to the contractor for any gaps between plans and
specifications and owner's requirements for project performance




SUCCESS
$21.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
STUDYSAGE

Conoce al vendedor

Seller avatar
STUDYSAGE Yale University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
3
Miembro desde
1 año
Número de seguidores
0
Documentos
1049
Última venta
6 meses hace
SELLING NOTES ONLINE,,GET ALL YOUR STUDY MATERIALS,QUALITY DOCUMENTS FOR BETTER RESULTS

Welcome to my online store, where I offer a variety of high-quality study documents designed to help students excel in their studies. Whether you need notes, summaries, or exam preparation materials, you'll find resources tailored to different subjects and learning styles. My goal is to support your academic journey by providing accessible and effective study aids." offer a variety of high-quality study documents designed to help students excel in their studies. Whether you need notes, summaries, or exam preparation materials, you'll find resources tailored to different subjects and learning styles. My goal is to support your academic journey by providing accessible and effective study aids."

Lee mas Leer menos
0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes