Which if the following MUST be clearly defined in a project charter? - ANSWER✔✔-Scope
Which of the following is the MAIN difference between an open-ended and close-ended problem
statement? - ANSWER✔✔-An open-ended problem statement leads to multiple solutions while a
close-ended one has limited solutions
A project team member, Joe, has completed his project work. Although the project is not completed
yet, Joe has been assigned by the PMO (Project Management Office) director to a new project.
Which of the following describes the organization structure Joe works in? - ANSWER✔✔-Project
based
Which if the following is used to provide a functional description if the efforts which are required in
order to accomplish a task? - ANSWER✔✔-WBS dictionary
A project manager is entering the list of a project's activities with their estimated begin and end time
to visualize which activities overlap and when the project is scheduled to end. Which if the following
is the project manager building? - ANSWER✔✔-Gnatt chart
The project manager is sequencing a set of activities. They discover that some of the activities may
or may not occur based on the outcome of other activities. Which of the following is BEST suited in
FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 1
, this situation to show the activities' logical relationship? - ANSWER✔✔-ADM (Arrow diagramming
method)
Which if the following is the MAIN difference between bottom up and top down cost estimation? -
ANSWER✔✔-Bottom up leads to more accurate cost estimate than top down because it is
performed by subject matter experts
Which of the following purchasing processes should a project team use to ensure that the work will
be done per company specifications, while selecting the overall cheapest provider? - ANSWER✔✔-
RFP (Request for Proposal)
One of the MAIN purposes of a kick-off meeting is to: - ANSWER✔✔-Assign and review roles
and responsibilities to the project team.
After the ground breaking at the new construction site, the pile driving operation comes to a full
stop due to the nature of the terrain. Which of the following is MOST likely to occur? -
ANSWER✔✔-The project manager must manage the new issue as the project schedule could be
delayed.
A new software solution is being deployed. The customer realizes that an important piece of the
software must be purchased in order for the project to be successful. Which of the following is
TRUE about this scenario? - ANSWER✔✔-Project schedule may be affected and the project
manager must follow the change control process.
While performing a scheduled walk through at a construction site, the customer points out a
discrepancy. Which of the following is the FIRST step that should be taken before submitting a
change control form? - ANSWER✔✔-Identify the change
FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 2
Questions and Answers
Which if the following MUST be clearly defined in a project charter? - ANSWER✔✔-Scope
Which of the following is the MAIN difference between an open-ended and close-ended problem
statement? - ANSWER✔✔-An open-ended problem statement leads to multiple solutions while a
close-ended one has limited solutions
A project team member, Joe, has completed his project work. Although the project is not completed
yet, Joe has been assigned by the PMO (Project Management Office) director to a new project.
Which of the following describes the organization structure Joe works in? - ANSWER✔✔-Project
based
Which if the following is used to provide a functional description if the efforts which are required in
order to accomplish a task? - ANSWER✔✔-WBS dictionary
A project manager is entering the list of a project's activities with their estimated begin and end time
to visualize which activities overlap and when the project is scheduled to end. Which if the following
is the project manager building? - ANSWER✔✔-Gnatt chart
The project manager is sequencing a set of activities. They discover that some of the activities may
or may not occur based on the outcome of other activities. Which of the following is BEST suited in
FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 1
, this situation to show the activities' logical relationship? - ANSWER✔✔-ADM (Arrow diagramming
method)
Which if the following is the MAIN difference between bottom up and top down cost estimation? -
ANSWER✔✔-Bottom up leads to more accurate cost estimate than top down because it is
performed by subject matter experts
Which of the following purchasing processes should a project team use to ensure that the work will
be done per company specifications, while selecting the overall cheapest provider? - ANSWER✔✔-
RFP (Request for Proposal)
One of the MAIN purposes of a kick-off meeting is to: - ANSWER✔✔-Assign and review roles
and responsibilities to the project team.
After the ground breaking at the new construction site, the pile driving operation comes to a full
stop due to the nature of the terrain. Which of the following is MOST likely to occur? -
ANSWER✔✔-The project manager must manage the new issue as the project schedule could be
delayed.
A new software solution is being deployed. The customer realizes that an important piece of the
software must be purchased in order for the project to be successful. Which of the following is
TRUE about this scenario? - ANSWER✔✔-Project schedule may be affected and the project
manager must follow the change control process.
While performing a scheduled walk through at a construction site, the customer points out a
discrepancy. Which of the following is the FIRST step that should be taken before submitting a
change control form? - ANSWER✔✔-Identify the change