Apics CPIM Section A Exam 2025
Questions and Answers


Electronic Data Interchange (EDI) - Correct Answer✔️✔️-Paperless (electronic) exchange

documents, such as purchase orders, shipment authorizations, advanced shipment notices, and

invoices, using standardized formats


Lean production - Correct Answer✔️✔️-A philosophy of production that emphasizes the

minimization of the amount of all the resources (including time) used in the various activities of the

enterprise. It involves identifying and eliminating non-value-adding activities in design, production,

supply chain management, and dealing with customers.


U-lines - Correct Answer✔️✔️-Production lines shaped like the letter "U." The shape allows

workers to easily perform several non-sequential tasks without much walk time. The number of

workstations in a u-line is usually determined by line balancing.


MURI - Correct Answer✔️✔️-A Japanese word meaning strain or overburden.


Materials Management - Correct Answer✔️✔️-Grouping of management functions supporting the

complete cycle of material flow from the purchase and internal control of production materials to

the planning and control of work in process to the warehousing, shipping, distribution of the

finished product.


FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 1

,Postponement - Correct Answer✔️✔️-A product design or supply chain strategy that deliberately

delays final differentiation (assembly, production, packaging, tagging, etc.) until the latest possible

time in the process.


Genchi Genbutsu - Correct Answer✔️✔️-A Japanese phrase meaning to visit the shop floor to

observe what is occurring.


Make to Order - Correct Answer✔️✔️-A production environment where a good or service can be

made after receipt of a customers order. The final product is usually a combination of standard

items, and items custom-designed to meet the special needs of the customer.


Participative design/engineering - Correct Answer✔️✔️-A concept that refers to the simultaneous

participation of all the functional areas of the firm in the product design activity. Suppliers and

customers are often also included.


Order Winners - Correct Answer✔️✔️-Those competitive characteristics that cause a firms

customers to choose that firms goods and services over those of its competitors.


Purchasing Lead Time - Correct Answer✔️✔️-Total lead time required to obtain a purchased item.

Included here are order preparation and release time; supplier lead time; transportation time; and

receiving, inspection, and put-away time.


Component - Correct Answer✔️✔️-The raw material, part, or sub-assembly that goes into a

higher-level assembly, compound, or other item. May also include packaging materials for finished

items.




FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 2

, Delivery Lead Time - Correct Answer✔️✔️-The time from the receipt of a customer order to the

delivery of the product.


Gantt Chart - Correct Answer✔️✔️-The earliest and best-known type of planning and control

chart, especially designed to show graphically the relationship between planned performance and

actual performance over time.


Closed-loop MRP - Correct Answer✔️✔️-A system built around material requirements planning

that includes the additional planning processes of production planning (sales and operations

planning), master production scheduling, and capacity requirements planning. Once this planning

phase is complete and the plans have been accepted as realistic and attainable, the execution

processes come into play. These processes include the manufacturing control processes of input-

output (capacity) measurement, detailed scheduling and dispatching, as well as anticipated delay

reports from both the plant and suppliers, supplier scheduling, and so on. The term closed loop

implies not only that each of these processes is included in the overall system, but also that feedback

is provided by the execution processes so that the planning can be kept valid at all times.


Cellular Manufacturing - Correct Answer✔️✔️-A manufacturing process that produces families of

parts within a single line or cell of machines controlled by operators who work only within the line

or cell.


supply chain - Correct Answer✔️✔️-The global network used to deliver products and services

from raw materials to end customers through an engineered flow of information, physical

distribution, and cash.




FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 3

Información del documento

Subido en
30 de mayo de 2025
Número de páginas
18
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EmilyCharlene
3.7
(114)
Vendido
507
Seguidores
139
Artículos
22946
Última venta
2 semanas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes