Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 1 The Activated Sludge Process: A. requires preaeration B. requires Activated Carbon C. is an aerobic biological process. D. Usually precedes primary sedimentation. E. Requires 50% by volume old sludge to work effectively. - ANS C. Is an Aerobic biological process A complete mix activated sludge plant has a fast settling sludge and high amounts of pin floc leaving the clarifier. One way to correct this problem is to : A. Increase the RAS Flow B. Reduce Wasting Rates C. Increase dissolved oxygen levels. D. Increase the F/M ratio by wasting more E. Increase the sludge age by wasting less. - ANS D. Increase the F/M Ratio by Wasting More Which of the following flow rates should be measured if the operator is to control plant properly? WASTEWATER CLASS C EXAM 2025 QUESTIONS AND ANSWERS Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 2 A. Aeration rate or resulting dissolved oxygen level. B. Influent or effluent. C. return sludge D. waste sludge E. all the above - ANS E. all the above During start up your aeration tank produces excessive amounts of billowing white foam. This can be corrected by: A. Doing nothing, it will go away in a few hours B. Increasing the sludge wasting rate C. Seeding the process with sufficient good quality sludge D. Spraying water on the foam until it is gone E. Taking a weeks vacation - ANS C. Seeding the process with sufficient good quality sludge In solving an operational problem at a treatment plant: A. there is almost always a good technical solution. It may require considerable experience and time to learn whaat it is. B. Human errors have to be corrected since the operator is at fault. C. don't let the laboratory personnel influence you're judgement as to what the best solution is. D. standard textbooks in sanitary engineering are the best source of information. E. It is best to do nothing until the TNRCCC sends a violation notice. - ANS A. there is almost always a good technical solution. It may require considerable experience and time to learn whaat it is. When the return slu

Mostrar más Leer menos
Institución
WASTEWATER
Grado
WASTEWATER









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
WASTEWATER
Grado
WASTEWATER

Información del documento

Subido en
27 de mayo de 2025
Número de páginas
14
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

WASTEWATER CLASS C EXAM 2025
QUESTIONS AND ANSWERS



The Activated Sludge Process:


A. requires preaeration
B. requires Activated Carbon
C. is an aerobic biological process.
D. Usually precedes primary sedimentation.

E. Requires 50% by volume old sludge to work effectively. - ANS C. Is an Aerobic biological
process


A complete mix activated sludge plant has a fast settling sludge and high amounts of pin floc
leaving the clarifier. One way to correct this problem is to :


A. Increase the RAS Flow
B. Reduce Wasting Rates
C. Increase dissolved oxygen levels.
D. Increase the F/M ratio by wasting more

E. Increase the sludge age by wasting less. - ANS D. Increase the F/M Ratio by Wasting More


Which of the following flow rates should be measured if the operator is to control plant
properly?


Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 1

, A. Aeration rate or resulting dissolved oxygen level.
B. Influent or effluent.
C. return sludge
D. waste sludge

E. all the above - ANS E. all the above


During start up your aeration tank produces excessive amounts of billowing white foam. This
can be corrected by:


A. Doing nothing, it will go away in a few hours
B. Increasing the sludge wasting rate
C. Seeding the process with sufficient good quality sludge
D. Spraying water on the foam until it is gone

E. Taking a weeks vacation - ANS C. Seeding the process with sufficient good quality sludge


In solving an operational problem at a treatment plant:


A. there is almost always a good technical solution. It may require considerable experience and
time to learn whaat it is.
B. Human errors have to be corrected since the operator is at fault.
C. don't let the laboratory personnel influence you're judgement as to what the best solution is.
D. standard textbooks in sanitary engineering are the best source of information.

E. It is best to do nothing until the TNRCCC sends a violation notice. - ANS A. there is almost
always a good technical solution. It may require considerable experience and time to learn
whaat it is.


When the return sludge rate is too low, what happens?

Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 2
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Brightstars Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
193
Miembro desde
1 año
Número de seguidores
7
Documentos
12191
Última venta
5 días hace
VERIFIED EXAMS AND STUDY GUIDES.

Here, you will find Study Notes, Exam answer packs 100% Guarenteed success.

3.3

31 reseñas

5
10
4
4
3
8
2
3
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes