AVIXA CTS-I study UPDATED ACTUAL Exam Questions and CORRECT Answers 1. Conducing Pre installation Activities/Evaluate Overall Facility Condia During a technical site survey for an installation with a display, informaion gathered should include: A. Color of the walls B. Receptionist name and phone number C. Ceiling height and construction method D. Rules governing use of the freight elevator - CORRECT ANSWER and construction method [Conducting Site Rough-In/ First-Fix/Mount Substructure] - C. Ceiling height When mounting a 34kg (75lb) projector with a 7kg (15lb) mount, the substructure should be able

Mostrar más Leer menos
Institución
Avixa
Grado
Avixa











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Avixa
Grado
Avixa

Información del documento

Subido en
27 de mayo de 2025
Número de páginas
40
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

AVIXA CTS-I study UPDATED ACTUAL
Exam Questions and CORRECT Answers
1. Conducing Pre installation Activities/Evaluate Overall Facility Condia During a technical site
survey for an installation with a display, informaion gathered should include:


A. Color of the walls
B. Receptionist name and phone number
C. Ceiling height and construction method

D. Rules governing use of the freight elevator - CORRECT ANSWER - C. Ceiling height
and construction method


[Conducting Site Rough-In/ First-Fix/Mount Substructure]
When mounting a 34kg (75lb) projector with a 7kg (15lb) mount, the substructure should be able
to support a minimum weight of:


A. 82kg (1801b)
B. 41kg (90lb)
C. 204kg (450lb)

D. 122kg (270lb) - CORRECT ANSWER - C. 204kg (450lb)


3. [Installing Audiovisual Systems/Prepare Audiovisual Rack]
Where should you place the wireless microphone receiver antenna in a rack assembly?


A. Line of sight to the transmitter
B. Inside the transmitter room
C. In the front of the rack

D. At the rear of the rack - CORRECT ANSWER - C. In the front of the rack

,4. [Performing Systems Closeout/Provide Training on Equipment Operation]
When training a customer on the operation of a touch-panel interface, an example that the GUI is
a good design that meets the customer's needs is:


A. The customer can easily use the touch panel with little explanation
B. The customer requires intensive training on how to use the touch panel
C. The customer thinks the panel looks cool

D. The customer wants only a few changes - CORRECT ANSWER - A. The customer can
easily use the touch panel with little explanation


1. Before developing a project plan, it is important to:


A. Make sure the client has made a deposit payment
B. Have a clear understanding of the scope of work
C. Order the AV equipment needed

D. List all the teams that will work on the project - CORRECT ANSWER - B. Have a
clear understanding of the scope of work


2. A scope statement should include:


A. Only the items within the project scope
B. Only the items within the deliverable scope
C. All the tasks that have to be performed

D. Both in-scope and out-of-scope items - CORRECT ANSWER - D. Both in-scope and
out-of-scope items


3. The key elements of a project should be driven by:


A. The cost of materials

,B. The overall budget
C. The client's need

D. The deadline for completion - CORRECT ANSWER - C. The client's need


4. What is a dependency within a project task schedule?


A. A task that cannot begin before another task has been completed
B. A task that must be completed by a specific date
C. A task that will be required if specific conditions occur at the project site
D. An optional task that the client can determine is needed once the project is underway -
CORRECT ANSWER - A. A task that cannot begin before another task has been
completed


5. Project budget refers to which of the following?


A. The amount of labor and materials the project manager has allocated to complete the project
B. The total amount that the client has paid the AV company for the project
C. The amount needed for purchasing the materials and supplies
D. The actual cost of labor and materials used to complete the project - CORRECT
ANSWER - A. The amount of labor and materials the project manager has allocated to
complete the project


6. A primary reason for attending construction meetings is to:


A. Develop a relationship with the other people on the job
B. Identify changes to the original design that will affect the AV installation
C. Find out the project's completion date

D. Submit invoices and other budget documentation - CORRECT ANSWER - B. Identify
changes to the original design that will affect the AV installation

, 7. In the event of a change in the placement of air-conditioning ducts in a boardroom, which of
the following documents should the AV integrator submit first?


A. Punch/snag/problem list
B. Change order (CO)
C. Request for change (RFC)

D. Request for information (RFI) - CORRECT ANSWER - D. Request for information
(RFI)


8. Which of the following documents should an AV integrator submit in the event that a
manufacturer has discontinued a projector model?


A. Letter of transmittal
B. Progress report (PR)
C. Request for change (RFC)

D. Construction change directive (CCD) - CORRECT ANSWER - C. Request for change
(RFC)


9. The ANSI/AVIXA 2M-2010 Standard Guide for Audiovisual Systems Design
Coordination Processes lays out a procedure for determining the _


A. functions and features that are required to support a given set of tasks
B. project communication that needs to take place on a given project
C. room types that are suitable for a given set of client needs
D. verification tests that should be performed during a given project - CORRECT
ANSWER - B. project communication that needs to take place on a given project


10. After which of the following activities is an AV project completed?


A. All hardware is installed
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
MGRADES Stanford University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1076
Miembro desde
1 año
Número de seguidores
102
Documentos
68972
Última venta
1 día hace
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

171 reseñas

5
73
4
30
3
46
2
8
1
14

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes