Elevator Mechanic Exam 2025/2026 Exam Questions with 100% Correct Answers | Latest Update A Latching relay: Used for call registration,direction selection or as selector relays Two types are: Set/Rest are electrical and Mechanical Latching relays Need to know latching relay symbol, Its a box with shaded triangle in lower right hand corner. -

Mostrar más Leer menos
Institución
Elevator Mechanic
Grado
Elevator mechanic











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Elevator mechanic
Grado
Elevator mechanic

Información del documento

Subido en
27 de mayo de 2025
Número de páginas
71
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Elevator Mechanic Exam 2025/2026
Exam Questions with 100% Correct
Answers | Latest Update



A Latching relay: Used for call registration,direction selection or as selector

relays

Two types are: Set/Rest are electrical and Mechanical Latching relays

Need to know latching relay symbol, Its a box with shaded triangle in lower

right hand corner. - 🧠 ANSWER ✔✔Which relay do you need to Order




710 Pg, 7

RPM = 60 ∙ ƒ ÷ P÷2 =

Step 1. 60 x Frequency (Hz.) =

Step 2. Poles ÷ 2 =


Take answer 1 and ÷ by answer 2 = - 🧠 ANSWER ✔✔Know the formula for

RPM



COPYRIGHT©NINJANERD 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
1

,435 Pg. 5

If you are referring to a megohm meter, it is a test of the insulation

properties of such things as electric wiring, motor windings and high power

antenna mounts.




We use a "megger" or "meg out" electrical wiring and equipment to see if it

is shorted to ground or the frame in any way.




The megger uses much higher voltages to check resistance than a normal

Volt-ohm meter.




Minimum resistance is 1 Meg Ohm - 🧠 ANSWER ✔✔Know what a Megger

is and what it does




636 Pg. 13




COPYRIGHT©NINJANERD 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
2

,(1) A parallel connection. (2) A resistive element placed across the

terminals of an armature to bypass a portion of the current. (3) A flexible

electrical conductor designed to conduct current around the mechanical

joint between two conductors. (4) The resistive element (Usually of very low

resistance) used in parallel with a DC ammeter movement to bypass a

calibrated portion of the total circuit current. - 🧠 ANSWER ✔✔Shunt

Overloads




425 All Pages


Bad Ground - 🧠 ANSWER ✔✔You are using a Temp Run Box and you get

shocked! Why!




520 Pg. 4

The bridle hitch can consist of two,three, or four single hitches (fig. 3-22),

used together to form a bridle hitch for hoisting an object

A sling with two legs used to lift a 1,000 pound object will have 500 pounds

of the load on each leg when the sling angle is 90 degrees. The load stress

on each leg increases as the angle decreases; and if the sling angle was


COPYRIGHT©NINJANERD 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
3

, 30 degrees lifting the same 1,000 pound object, the load will be 1,000

pounds on each leg. Try to keep all sling angles greater than 45 degrees;

sling angles approaching 30 degrees are considered extremely hazardous

and must be avoided at all cost. - 🧠 ANSWER ✔✔Bridal Hitch




128 Pg 17

Scaffolding should be tied to the structure using

#9 wire or tie-in devices. The first vertical tie

should be at the maximum height of 4 times the

narrowest base dimension. Additional ties are not

to exceed 26' vertically. Maximum horizontal


distance between ties is not to exceed 30'. - 🧠 ANSWER ✔✔Scaffolding,

You have 32' of rise, you are using 3x5 scaffolding. Where will the tie off

points be ?




140 PG. 287-288




COPYRIGHT©NINJANERD 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
4
$13.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
NinjaNerd Liberty University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
207
Miembro desde
1 año
Número de seguidores
4
Documentos
12254
Última venta
23 horas hace
NinjaNerd

Here You will All Documents and Package Deals Offered by Seller NinjaNerd.

3.7

32 reseñas

5
14
4
5
3
7
2
2
1
4

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes