Leadership in Energy and Environmental Design (LEED) - ANSWER✔✔-has 4
certification levels.
Installation of EVSE at an existing building - ANSWER✔✔-is worth as many as 15
LEED points.
Installing electric vehicle charging equipment - ANSWER✔✔-may improve public
perception of a business.
When a business installs charging equipment - ANSWER✔✔-the public may sense that
the business supports sustainability.
Determining the appropriate location for EVSE - ANSWER✔✔-requires the person
planning the installation to consider all of the above.
Proper location of EVSE - ANSWER✔✔-may include consideration of ADA guidelines
depending on location.
COPYRIGHT © 2025 BY OLIVIA GREENWAYS, ALL RIGHTS RESERVED 1
, Jurisdictional codes and requirements - ANSWER✔✔-should always be checked when
determining the location and other features of the EVSE.
Bollards, curbs, and wheel stops - ANSWER✔✔-can protect charging equipment from
physical damage from vehicles.
Adequate site lighting - ANSWER✔✔-increases the safety of an EVSE location.
Trailblazing signs - ANSWER✔✔-are for directing drivers to the location of EV
charging equipment.
According to the ADA guidelines - ANSWER✔✔-4% of general parking spaces should
be accessible.
ADA parking space guidelines - ANSWER✔✔-can be used as a guide when
determining the number of EV charging spaces that should be made accessible.
ADA guidelines - ANSWER✔✔-are useful when planning an EVSE installation because
all of the above.
Operable parts of accessible equipment - ANSWER✔✔-should be located 15"-48" above
finish grade per ADA guidelines.
The maximum depth of a barrier - ANSWER✔✔-such as a curb or housekeeping pad, in
front of accessible equipment is 10".
COPYRIGHT © 2025 BY OLIVIA GREENWAYS, ALL RIGHTS RESERVED 2
QUESTIONS AND CORRECT ANSWERS | LATEST EXAM |
GRADED A+ | VERIFIED ANSWERS | JUST RELEASED
Leadership in Energy and Environmental Design (LEED) - ANSWER✔✔-has 4
certification levels.
Installation of EVSE at an existing building - ANSWER✔✔-is worth as many as 15
LEED points.
Installing electric vehicle charging equipment - ANSWER✔✔-may improve public
perception of a business.
When a business installs charging equipment - ANSWER✔✔-the public may sense that
the business supports sustainability.
Determining the appropriate location for EVSE - ANSWER✔✔-requires the person
planning the installation to consider all of the above.
Proper location of EVSE - ANSWER✔✔-may include consideration of ADA guidelines
depending on location.
COPYRIGHT © 2025 BY OLIVIA GREENWAYS, ALL RIGHTS RESERVED 1
, Jurisdictional codes and requirements - ANSWER✔✔-should always be checked when
determining the location and other features of the EVSE.
Bollards, curbs, and wheel stops - ANSWER✔✔-can protect charging equipment from
physical damage from vehicles.
Adequate site lighting - ANSWER✔✔-increases the safety of an EVSE location.
Trailblazing signs - ANSWER✔✔-are for directing drivers to the location of EV
charging equipment.
According to the ADA guidelines - ANSWER✔✔-4% of general parking spaces should
be accessible.
ADA parking space guidelines - ANSWER✔✔-can be used as a guide when
determining the number of EV charging spaces that should be made accessible.
ADA guidelines - ANSWER✔✔-are useful when planning an EVSE installation because
all of the above.
Operable parts of accessible equipment - ANSWER✔✔-should be located 15"-48" above
finish grade per ADA guidelines.
The maximum depth of a barrier - ANSWER✔✔-such as a curb or housekeeping pad, in
front of accessible equipment is 10".