100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

WMGT 101-22A EXAM 3_ACTUAL EXAM QUESTIONS WITH COMPLETE SOLUTIONS!!_NEWEST UPDATE .

Puntuación
-
Vendido
-
Páginas
7
Grado
A+
Subido en
24-05-2025
Escrito en
2024/2025

WMGT 101-22A EXAM 3_ACTUAL EXAM QUESTIONS WITH COMPLETE SOLUTIONS!!_NEWEST UPDATE .WMGT 101-22A EXAM 3_ACTUAL EXAM QUESTIONS WITH COMPLETE SOLUTIONS!!_NEWEST UPDATE .p

Institución
WMGT 101-22A
Grado
WMGT 101-22A









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
WMGT 101-22A
Grado
WMGT 101-22A

Información del documento

Subido en
24 de mayo de 2025
Número de páginas
7
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

WMGT 101-22A EXAM 3/ACTUAL EXAM
QUESTIONS WITH COMPLETE
SOLUTIONS!!/NEWEST UPDATE
Save




Students also studied



Flashcard sets Study guides




ATP Rigging State Farm Estimatics Exam NYS Tow Truck Endo


40 terms 26 terms Teacher 20 terms




guzman2340 Preview nawf__king Preview linetkamau23




Stretch your brain before your first study session



Learn 1 /7 Study with Learn




Baseline threat used in the design of protective measures




Choose matching term




1 Environmental Impact Statement (EIS) 2 Environmental Assessment (EA)




3 AFMAN 91-203 4 Design Basis Threat (DBT)




Don't know?




CE shall: have at least 1 engineer at each base must complete

Security Eng AT Planning & Design Course, review, document,

and track construction projects AT compliance, provide
AFI 10-245, Antiterrorism
vulnerability assessment protection option program (VAPO)

analysis for all critical facilities and off-base leases, and work with

the Base Antiterrorism Officer

, 1. UFC 4-020-01

2. Is only the minimum standard required?

Antiterrorism Requirement 3. Yes: construction standoff distance available?

Planning No: UFC 4-020-02 and support manuals

4. If standoff distance is available, apply UFC 4-010-01 and

support manuals


Design Basis Threat (DBT) Baseline threat used in the design of protective measures


Based on planning team, local intel and Geographic Combatant
Initial DBT
Command (COCOM) Theater-Wide threat assessments


Modify Initial DBT Local threat assessments


The degree to which an asset is protected, defines the amount of
Level of Protection
damage a facility or asset can sustain during an attack


Progressive collapse is unlikely, but space in and around

damaged area will be unusable and onset of structural collapse

LOP: Very low occurs. Glazing is likely to be propelled into the building and

cause serious injuries. Doors may be propelled into rooms,

presenting serious hazards.


Building will not be economically repairable and space in and

around damaged area will not be usable, but progressive

LOP: Low collapse will not occur. Glazing will fracture and may come out

of the frame, but does not present a significant injury hazard.

Doors may fail but present minimal hazards.


Minor damage, space in and around damaged area can be used

and will be fully functional after cleanup and repairs. Glazing will
LOP: Medium
fracture but remain in the frame. Doors may stay in frames but

will not be reusable.


Minimal to no damage with no permanent definitions. Glazing
LOP: High
will not break. Doors will be reusable.


DoD minimum antiterrorism standards for buildings. Intent is to

UFC 4-010-01 reduce mass casualties, minimize collateral damage to nearby

facilities, and facilitate future upgrades and increases FPCON.


DoD Security Engineering Facility Planning Manual. Acts as a

starting point for Garrison Antiterrorism and a quantitative risk-

UFC 4-020-01 based model. Uses scoring model to evaluate asset value (0-1.0),

threat likelihood (0-1.0), and use of minimum AT standards (<0.5).

Includes cost data and helps establish a DBT and required LOP.


1. Bollards, fences, curbs, and barriers are and adequate

substitution for standoff
AT/FP misconceptions
2. Existing roads must be moved away from existing buildings

3. All building require standoff


Standard 1: Standoff distance

Standard 6: Progressive collapse
Mandatory design standards
Standard 10: Glazing

Standard 16: Air Intakes


Smallest permissible standoff distance for new and existing

Minimum standoff distance construction, regardless of analysis or hardening of the building.

Not used for master planning or programming.
$19.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Educator001 Johns Hopkins University School Of Medicine
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
64
Miembro desde
2 año
Número de seguidores
46
Documentos
1345
Última venta
2 meses hace
Hope is enough.

Hi, Worry no more. You can now access easily reliable, highly rated exam and learning materials directly from our stuvia page. We offer exams in Medical course , Nursing courses , Insurance ,Maternal newborn, Pediatric, NCLEX, Med surg, Hesi, Testbanks. Use search icon below to find your intended document among. You can contact me if you need any assistance on any exam, free samples, free advice, better preview etc. Thank you and Success in your studies.

Lee mas Leer menos
4.8

257 reseñas

5
225
4
20
3
5
2
3
1
4

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes