100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

MGMT 339 Newest Final Test Exam With correct Verified Answers Graded A+

Puntuación
-
Vendido
-
Páginas
14
Grado
A+
Subido en
23-05-2025
Escrito en
2024/2025

MGMT 339 Newest Final Test Exam With correct Verified Answers Graded A+

Institución
Business Management.
Grado
Business Management.









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Business Management.
Grado
Business Management.

Información del documento

Subido en
23 de mayo de 2025
Número de páginas
14
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

MGMT 339 Newest Final Test Exam
With correct Verified Answers Graded
A+

Waiting-line problems that cannot be studied with
waiting-line models must be analyzed with which
analytical tool?
simulation
In general, a less capital-intensive industry such as a
hotel chain would do well with a utilization rate of
60-70%
Capacity planning requires demand forecasts for an
extended period of time. Forecast accuracy tends to
_______ as the forecasting horizon _______.
decline; lengthens
Input measures of capacity are preferred when there
are flexible flow processes
Which of the following is a principal reason that
explains why economies of scale can drive costs
down when output increases?
all of the above
Anna's landscaping business has a capacity gap;
which alternative can best be described as "simply to
do nothing"?
base-case strategy
Which tool deals more formally with demand
uncertainty and variability of capacity decisions?

, waiting-line models
Chang and Chang observe that the competition is
increasing the size of its warehouses. They have
decided to do the same. They are following _______
strategy.
a follow the leader
A diseconomy of scale is realized when
the average cost per unit increases as the facility's
size increases
Using input measures of capacity is least appropriate
in which of the following situations?
product variety and process divergence is low
Long-term capacity planning deals with which of the
following factors?
investment in new facilities
An expansionist capacity strategy is NOT indicated
when
expansion will lead to economies of scale
When evaluating alternative capacity decisions,
qualitative concerns exclude
cash flow
Waiting-line models often are used in capacity
planning in order to
select an appropriate capacity cushion for a high
customer-contact process
A measure of the reserve capacity a process has to
handle in unexpected increases in demand is the
capacity cushion
Throughput time is defined as
the total elapsed time from the start to the finish of a
job being processed at one or more workcenters
$38.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
georgemutahi4

Conoce al vendedor

Seller avatar
georgemutahi4 oxford
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
2 año
Número de seguidores
0
Documentos
45
Última venta
-
@KUNTAH'S

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes