Subsoil water - Answer - ✔ Water collected and carried to a storm sewer.
Storm drain pipe - Answer - ✔ A drain pipe not allowed to discharge factory or domestic
waste.
Sanitary drainage system - Answer - ✔ A system that must discharge into a public
sewer system for public health reasons.
Major outfall - Answer - ✔ A pipe or channel outside a building which conveys storm
water from the roof or gutter drains.
Storm sewer placement - Answer - ✔ Storm sewers are usually placed under the road
on wide roads.
Channeling sewage - Answer - ✔ Carrying rainfall runoff in open ditches.
Roof area consideration - Answer - ✔ Add 50% of the wall area above the roof when
sizing rainwater piping.
Building wall area exposure - Answer - ✔ One-half of the gross area of the side of a
building wall exposed to rain is considered.
French drains - Answer - ✔ A stormwater drainage system designed to keep stormwater
away from building foundations.
Conductor - Answer - ✔ A pipe installed to drain water from the roof into a storm roof
catchment.
Septic tank distance - Answer - ✔ Construction of a septic tank should be located 20
meters away from the source of water supply.
Sedimentation chamber - Answer - ✔ A compartment in the septic tank usually
extended above the surface of the ground.
Retention period - Answer - ✔ The time for which suspended matters in a septic tank
would settle and stabilize is 24 hours.