100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Fire inspector II Exam 2025 Questions and Answers

Puntuación
-
Vendido
-
Páginas
23
Grado
A+
Subido en
22-05-2025
Escrito en
2024/2025

Fire inspector II Exam 2025 Questions and Answers Fire inspector three functional areas - ANS Administration Field inspection Plans review Administrative duties - ANS Processing permits Applications Plans review New policies Respond to complaints Keeping records of written and spoken correspondence time management skills - ANS specific strategies for planning and using time in effective, healthful ways and complete your duties Purpose of field inspections - ANS Verify whether buildings are meeting federal, state, and local fire prevention codes. Requirements of field inspection - ANS Assessment of the outside and surrounding premises. Know and understand the fire safety codes and standards adopted in thier jurisdiction Pg. 2 Copyright © 2025 Jasonmcconell. ALL RIGHTS RESERVED. Plans review - ANS Process of reviewing building plans and specifications to determine the safety characteristics of the proposed building generally done before permission is granted to begin construction appropriate dress code - ANS Follows department regulations professional and neat shows organization and preparation for the job Effective fire prevention education program - ANS Positive Impressions Relationships with other agencies community educational programs National fire prevention week activities The two documents that establish the legal and ethical authority for fire inspection within the military - ANS DODI 6055.06 (DOD Fire and Emergency Services Program) UFC 3-600-01 (Fire Protection Engineering for Facilities) DODI 6055.06 (DOD Fire and Emergency Services Program) - ANS Establishes the foundation for fire pervention and education program UFC 3-600-01 (Fire Protection Engineering for Facilities) - ANS Specifies fire codes and standards that are adopted and implemented by all DOD fire departments Special Operation permits include - ANS Maintenance and storage of Haz products Haz ops (welding, fireworks, bonfires, open burning) Installation or operation of equipment in connection with haz ops. Two main goals for permitting process - ANS 1. ensures Haz operations or installments meets applicable requiremen

Mostrar más Leer menos
Institución
Fire Inspector II
Grado
Fire inspector II










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Fire inspector II
Grado
Fire inspector II

Información del documento

Subido en
22 de mayo de 2025
Número de páginas
23
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Fire inspector II Exam 2025 Questions and
Answers




Fire inspector three functional areas - ANS Administration
Field inspection
Plans review



Administrative duties - ANS Processing permits
Applications
Plans review
New policies
Respond to complaints
Keeping records of written and spoken correspondence



time management skills - ANS specific strategies for planning and using time in effective,
healthful ways and complete your duties



Purpose of field inspections - ANS Verify whether buildings are meeting federal, state, and
local fire prevention codes.



Requirements of field inspection - ANS Assessment of the outside and surrounding premises.
Know and understand the fire safety codes and standards adopted in thier jurisdiction




Pg. 1 Copyright © 2025 Jasonmcconell. ALL RIGHTS RESERVED.

,Plans review - ANS Process of reviewing building plans and specifications to determine the
safety characteristics of the proposed building generally done before permission is granted to
begin construction



appropriate dress code - ANS Follows department regulations
professional and neat
shows organization and preparation for the job



Effective fire prevention education program - ANS Positive Impressions
Relationships with other agencies
community educational programs
National fire prevention week activities


The two documents that establish the legal and ethical authority for fire inspection within the
military - ANS DODI 6055.06 (DOD Fire and Emergency Services Program)
UFC 3-600-01 (Fire Protection Engineering for Facilities)



DODI 6055.06 (DOD Fire and Emergency Services Program) - ANS Establishes the foundation
for fire pervention and education program



UFC 3-600-01 (Fire Protection Engineering for Facilities) - ANS Specifies fire codes and
standards that are adopted and implemented by all DOD fire departments



Special Operation permits include - ANS Maintenance and storage of Haz products
Haz ops (welding, fireworks, bonfires, open burning)
Installation or operation of equipment in connection with haz ops.



Two main goals for permitting process - ANS 1. ensures Haz operations or installments meets
applicable requirements


Pg. 2 Copyright © 2025 Jasonmcconell. ALL RIGHTS RESERVED.

, 2. ensures fire department personnel are aware of the haz ops being accomplished.



when does the permitting process begin? - ANS when a property owner or contractor
decides to perform a specific activity requiring a permit.



Before issuing a permit, fire inspector must do the following: - ANS 1. conduct a site visit
2. Make sure the permit is complete
3. make sure all supporting materials have been provided



determining wheter a hot work permit should be given: - ANS 1. ID if there are flammable
materials present in work location
2. Ensure combustibles are isolated from ignition
3. Prevent hot works ops from occuring when exposing combustibles to ignition
4. ensure extinguishing equipment is on hand
5. Half hour after operations are complete there must be a fire watch



Fire Watch Requirements - ANS 1. Watch for fires
2. ensure safe conditions are maintained
3. has authority to stop welding ops if it is unsafe
4. has fire extinquishing equipment on hand



the need for a fire watch - ANS 1. combusible material are 35 ft to point of ops
2. easily ignited combustibles are adjacent to the opposite side of partitions, walls, ceilings, or
roofs.



Permits must have these three conditions: - ANS 1. What activities are being allowed
2. guidelines that must be followed
3. The timeframe for which the permit is valid


Pg. 3 Copyright © 2025 Jasonmcconell. ALL RIGHTS RESERVED.
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
StarGuide Liberty University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
16
Miembro desde
1 año
Número de seguidores
0
Documentos
2591
Última venta
1 semana hace
FIRST CLASS GALORE

Accurate Exam Study Materials.Verified And Updated By Professionals.

4.3

4 reseñas

5
1
4
3
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes