Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 9 páginas
Examen

3M 302 RPPO EXAM QUESTIONS AND ANSWERS

Document preview thumbnail
Vista previa 2 fuera de 9 páginas

3M 302 RPPO EXAM QUESTIONS AND ANSWERS

Vista previa del contenido

3M 302 RPPO EXAM QUESTIONS
AND ANSWERS

What is RPPOs main responsibility during CASREP - Answer-To order essential
parts/technical assistance and provide updates to the work center chain of command as
needed

CASREP Category 3 - Answer-Deficiency exists in mission essential
material/equipment that causes a MAJOR degradation but not the loss of a primary
mission

CASREP - Answer-Casualty report, used to initially report equipment degradations or
loss

Define the four types of casualty reports (CASREPs): CASUP - Answer-Casualty
update, formal mechanism to provide updates to a CASREP or to correct erroneous
data to previous CASREP product

Define the four types of casualty reports (CASREPs): CASCOR - Answer-Casualty
correction, identifies to all stakeholders that corrective actions are complete and the
CASREP is closed. May/may not be tied to an operational test depending on how
CASREP was written

Define the four types of casualty reports (CASREPs): CASCAN - Answer-Casualty
cancel, reports that a CASREP is being cancelled.

Discuss the relationship between a CASREP and the following: 3-m system - Answer-
When work center sends out CASREP, 3MC must review equipment and items that are
being reported for accountability and to reflect current maintenance status and impact
toward the commence operations and work center

Discuss the relationship between a CASREP and the following: supply system -
Answer-The supply office reviews all CASREPS and ensures a specific urgency code is
attached to the requisition in order to expedite the parts procurement

Discuss how repair parts and consulate items are ordered via: relational supply (R-
supply) - Answer-Repair parts and consumable items ordered in MDS are reviewed by
the supply department and ordered through the most appropriate supply channel

, Discuss how repair parts and consulate items are ordered via: MDS - Answer-Repair
parts ordered under JSN/WORK candidate created in OMMS for specific unit of
equipment
-non-repair/non-maintenance items can also be ordered in OMMS by manually entering
the item information OMMS

Discuss how repair parts and consulate items are ordered via: open purchase - Answer-
The ordering company/department does parta research for items not carried in the
supply system and submits OPR forms to supply after approval by the departments
leadership

Explain the procedures for ordering non-NSN materials - Answer-Forms DD 1348 or
NAVSUP form 1250-2 will be used to acquire material/equipment

Explain the procedures for ordering non-cosal supported parts/materials - Answer-
RPPO may use OMMS-NG to order parts not listed in the CoSAL under a work
candidate

Discuss the importance of configuration change as it applies to repair parts - Answer-
Used the report the installation, removal, relocation, or modification of any system
equipment, component, or unit. This process updates the units COSAL and APLs. It
may result in a change to the parts carried by the unit.

Define the following and their relationship to configuration change: fleet cosal feedback
report (FCFBR) - Answer-Shops/battalion may submit CoSAL feedback reports to report
issues/discrepancies with the units COSAL and to seek correction
-FCFBR submitted via NAVY 311 webiste

Define the following and their relationship to configuration change: allowance change
request - Answer-A request to increase or decrease the requirements in COSAL

NAVSUP P-409 - Answer-Is a MILSTRIP/MILSTRAP desk guide

Depot Level Repairable (DLR) - Answer-The DLRs are repairable items for which the
codoemnation should be made at the depot level



ASI - Answer-Automated shore interface

Discuss the procedure of asi processing and up-line reporting - Answer--3mc updated
the equipment file in OMMS with changes made by CDM
-3mc requests/downloads updated files from online server then process them through
OMMS
-completed every 10 days

CDM - Answer-Configuration Data Manager

Información del documento

Subido en
20 de mayo de 2025
Número de páginas
9
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$13.89

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Scholarsstudyguide
3.9
(168)
Vendido
826
Seguidores
475
Artículos
16210
Última venta
6 días hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes