PJM 6015 Final Exam
Due No due date Points 140 Questions 35 Time Limit 60 Minutes


Instructions
Final Exam Parameters

Logistics: Online
Number of Questions: 35
Duration: 60 minutes
Possible points: 140 points
Questions Type: Fill in the blank, multiple choice, multiple answer, and matching
Question Delivery: One question at a time
Multiple Attempts: Not allowed. This Test can only be taken once
Force Completion: Once started, this Test must be completed in one sitting. Do not leave the Test before clicking
Save and Submit.
Due date: Saturday of the last week of the course

Special Instructions

This is an online and open book exam. Students are allowed to use their course materials, including electronic books
(eBooks) and lecture notes. No proctoring is required.




Attempt History
Attempt Time Score
LATEST Attempt 1 33 minutes 140 out of 140



Score for this quiz: 140 out of 140
Submitted Jul 1 at 9:10pm
This attempt took 33 minutes.


Question 1 pts



Assessing the probability and consequences of identified risks to the
project objectives, assigning a risk score to each risk, and creating a list of
prioritized risks describe which pf the following process?

,Correct!




Question 2 pts



Which of the following statement is false?




Correct! Proper risk management is reactive rather than proactive.


Proper risk management is participative rather than autocratic


Proper risk management is a team activity rather an individual activity



Proper risk management is an iterative process rather than a one-time
process

, Project Risk Management includes the processes of conducting
risk management planning, identification, analysis, response
planning, and monitoring and control on a project. The objectives
of Project Risk Management are to increase the probability and
impact of positive events, and decrease the probability and impact
of negative events in the project. Thus, risk management is
proactive management.




Question 3 pts



In qualitative risk analysis, the project team sometimes uses a numeric
scale and a color coding system assigning red, yellow and green to a pre-
determined value range. This color coding system breaks the risks into
groups requiring different level of attention. Green risks are those that
(selected the best answer).




Can be ignored


Require more attention


Should be closely monitored

Correct!
Are of least concern

, In a color coding system, green risks are usually those of least
concern but should not be ignored because risk status changes as
the project progresses.




Question 4 pts



You have just been selected as the project manager of a high-risk project.
You and your project team are working with key stakeholders to develop a
risk management plan (RMP). Which of the following documents you may
need to develop your RMP?




Scope management plan


Cost management plan


Schedule management plan


Communications management plan

Correct!
All of the above.

Información del documento

Subido en
17 de mayo de 2025
Número de páginas
32
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$25.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Bri254
4.0
(181)
Vendido
919
Seguidores
738
Artículos
3550
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes