100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Otro

WGU D156 Leadership and Management E-Portfolio Template |Latest Update with Complete Solution

Puntuación
-
Vendido
-
Páginas
5
Subido en
16-05-2025
Escrito en
2024/2025

WGU D156 Leadership and Management E-Portfolio Template |Latest Update with Complete Solution

Institución
Grado









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
16 de mayo de 2025
Número de páginas
5
Escrito en
2024/2025
Tipo
Otro
Personaje
Desconocido

Temas

Vista previa del contenido

1

WGU D156 Leadership and Management E-Portfolio Template
|Latest Update with Complete Solution

Student Name: Robert Kennedy

Course Name: Business Case Analysis for Healthcare Improvement- D156

Instructions:



To fulfill the requirements for this course, you must complete the CPE Record. Refer to your
Assessment Task Overview for specific deliverables. You must include the required deliverables in
this e-portfolio.



Enter your written deliverables (e.g., reflections, etc.) into this template for each phase. Previously
created Word documents may also be inserted into this Word document by using the following
instructions or may be submitted as separate documents for evaluation.



To insert a PDF document or previously created Word Documents, follow these instructions:

1. Click or tap where you want to insert the content of the existing document.
2. Go to Insert and select the arrow next to Object.
3. Select Text from File.
4. Locate the file that you want and then double-click it.
5. To add in the contents of additional Word documents, repeat the above steps as needed.

CPE Schedule

Required CPE Activities Estimated Time Anticipated Completion
(hours and minutes) Date
Organizational problem 1 hour 4/2/25
Stakeholders 1 hour 4/2/25
Project Team 1 hour 30 min 4/2/25
Needs Assessment 2 hours 4/3/25
SWOT Analysis 2 hours 4/4/25
Impact Analysis 2 hours 4/4/25
Justification and Project Purpose 1 hour 30 min 4/5/25
Review of Scholarly Sources 3 hours 4/6/25
Project Environment 1 hour 4/6/25
SMART Goals 1.5 hours 4/6/25
Project Management Life Cycle 2 hours 4/7/25



1

, 2




Table of titles of stakeholders/project team members

Stakeholders/Team Members
Project Manager
Administrative Assistant
Preop nurses
HVIS Lab nurses
Anesthesia
Surgical Physicians
Information Technology
HVIS Leadership
Schedulers
Patients/families


Needs Assessment Template
• Why are first-case surgeries being delayed?

One significant cause of first-case delays is inefficient scheduling of the surgeries.

• Why is the scheduling inefficient?

Some first-case start delays result from patients being transported to the labs by staff
instead of in the preoperative area. Patients must have all preoperative work done quickly
before they come to the lab by surgical team members. This is considered a poor utilization
of resources. Some poor communication results from nurses in the preop and labs area not
being able to let each other know when tasks are completed and when others still need to
be finished by providers.

• Why is scheduling between teams and coordination poor?

In some cases, vendors are needed for specific specialized equipment. In other cases, they
may require anesthesia. There have been times when both groups have not been made
aware of the case, and communication must be made to ensure the case is completed. In
the first case of delays that must be transported directly to the lab and not to the
preoperative area, doctors may not always communicate that to staff beforehand.

• Why are there no standardized processes for communication and scheduling?

One reason for the poor communication is a lack of training from all caregivers involved.
Some physicians report that there is no way to communicate their needs in the current
scheduling system.

• Why is there a lack of a standardized process for scheduling and communication?

The surgical scheduling software has existed for many years and could be outdated. There
could be a lack of process improvement from leadership in the OR areas.

SWOT Analysis Template


2
$18.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
professoraxel Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2382
Miembro desde
3 año
Número de seguidores
1572
Documentos
19396
Última venta
2 días hace
THE EASIEST WAY TO STUDY NURSING EXAMS,STUDY GUIDES,TESTBANKS AND QUALITY EXAMS

Better grades start here! Find Study Notes, Exam answer packs, Assignment guided solutions and more. Study faster & better. Always leave a review after purchasing any document so as to make sure our customers are 100% satisfied.....All the Best!!!!!!

3.8

458 reseñas

5
214
4
80
3
86
2
26
1
52

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes