Earthwork Construction Inspection Level 1 Exam (With Correct Answers Marked) Question 1
Requirements for the QC Density Report include:
A. The Contractor's name
B. The EOR's name
C. The Project Administrator's name
D. The QC Manager's name
E. None of the above
ANS: E Question 2
For the initial gauge comparison of QC, VT, and IA, select the statement that is incorrect.
A. Only QC and VT gauges are required to be recorded on this sheet.
B. A separate line must be completed for each gauge used on the project.
C. If a gauge is calibrated or repaired during construction, comply with specification 120-10.1.1 and enter information above.
D. Enter Inspectors initials and TIN each time equipment is compared.
E. Include and retain a copy of gauge calibration parameters.
ANS: A Question 3
Which of the following does not apply to the Earthwork Records System?
A. Construction contracts with roadway earthwork items shall have an Earthwork Records System.
B. Each contract shall have an Earthwork Records System consisting of a Quality Control and a separate Verification record.
C. For convenience, the Earthwork Records System may be temporarily separated.
D. An Earthwork Density Report shall be used to record all test data.
E. Independent Assurance (IA) shall maintain their own separate Earthwork Record System for

Mostrar más Leer menos
Institución
Grado

Vista previa del contenido

Earthwork Construction Inspection Level 1 Exam
(With Correct Answers Marked)

Question 1
Requirements for the QC Density Report include:
A. The Contractor's name
B. The EOR's name
C. The Project Administrator's name
D. The QC Manager's name
E. None of the above
ANS: E

Question 2
For the initial gauge comparison of QC, VT, and IA, select the statement that is incorrect.
A. Only QC and VT gauges are required to be recorded on this sheet.
B. A separate line must be completed for each gauge used on the project.
C. If a gauge is calibrated or repaired during construction, comply with speci cation 120-10.1.1
and enter information above.
D. Enter Inspectors initials and TIN each time equipment is compared.
E. Include and retain a copy of gauge calibration parameters.
ANS: A

Question 3
Which of the following does not apply to the Earthwork Records System?
A. Construction contracts with roadway earthwork items shall have an Earthwork Records
System.
B. Each contract shall have an Earthwork Records System consisting of a Quality Control and a
separate Veri cation record.
C. For convenience, the Earthwork Records System may be temporarily separated.
D. An Earthwork Density Report shall be used to record all test data.
E. Independent Assurance (IA) shall maintain their own separate Earthwork Record System for




fi fi

,comparison purposes.
ANS: E

Question 4
After completing the Speedy Moisture Test, the dial reading is very near zero and you decide to
rerun the test. Which of the following is not one of the steps you should follow?
A. Re-run test with twice the standard sample size.
B. Place four scoops of reagent in the tester.
C. Perform the test in normal manner.
D. Divide the dial reading by 2.
E. Obtain Dry Weight from conversion chart.
ANS: B

Question 5
Compacting soil does which of the following?
A. Increase unit weight
B. Decrease compressibility
C. Decrease permeability
D. Increase voids
E. A, B & C
ANS: E

Use the picture below to answer question 6 and 7

, Question 6
Assuming 6-inch lifts and a total number of lifts of 14, the marked density is for lift:
A. 3/14
B. 6/14
C. 6/8
D. 5/14
E. 0/14
ANS: B

Question 7
At what station was the test taken?
A. 51+00
B. 50+25
C. 50+50
D. 50+00
E. None of the above
ANS: B

Question 8
The order in which the materials are placed into the Speedy are:
A. Steel Balls into the body, soil into the body, reagent into the cap, then the cap placed on the
body and turned upright, then tighten the top screw.
B. Steel Balls into the body, reagent into the body, soil into the cap, then the cap placed on the
body while vertical, then tighten the top screw.
C. Steel Balls into the body, soil into the body, reagent into the body, then with the body held
horizontal – tighten the top cap, then turn the body upright to mix the soil and reagent in the
body.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
15 de mayo de 2025
Número de páginas
17
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$28.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
NurseElena Miami Dade College Medical Campus
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
50
Miembro desde
2 año
Número de seguidores
36
Documentos
172
Última venta
4 meses hace
NURSING HELP STORE

Nursing school is hard… Here are some tools to help Hello FUTURE NURSES! Im here to make nursing school a little bit EASIER. Good luck with studying! Appreciate you all and wish you the best of luck going forward…now go get it going.

4.0

17 reseñas

5
10
4
1
3
4
2
0
1
2

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes