NETTCP TRAINING EXAM (2025) MOST RECENT
COMPREHENSIVE QUESTIONS AND ANSWERS
|COMPLETE SOLUTIONS |A+ GRADED |100%
CORRECT!!
Save
Terms in this set (81)
plans or action taken by an agency that provides
Quality assurance is confidence that a product or service with be
defined as satisfactory/adequate
I-15
the framework necessary for construction Quality
A Quality Assurance
Assurance implementation
program serves as
I-18
The making and revision agency and industry personnel (engineers,
of QA specs should inspectors, technicians)
include... I-19
The 6 elements used in True
"design bid build" QA I-22
programs are the same as
"Design build"
construction QA
programs
Quality control activities Sampling, testing and visual inspection
include... I-24
-are Project Specific
- Address specific processes for individual
QC plans ...
categories of work on a construction process
I-25
https://quizlet.com/1044327074/nettcp-training-exam-2025-most-recent-comprehensive-questions-and-answers-complete-solutions-a-graded-100… 1/9
, 5/15/25, 11:37 AM NETTCP TRAINING EXAM (2025) MOST RECENT COMPREHENSIVE QUESTIONS AND ANSWERS |COMPLETE SOLUTI…
Acceptance is the the transportation agency
responsibility of ... I-26
the absolute threshold values for individual test
Engineering limits are ... results
I-29
Quality measures
QA specs use
I-28
identify discrepancies or differences in testing
The purpose of IA is to... procedures or equipment
I-34
IA comparison is split samples
performed on ... I-34
If contractor QC test a dispute resolution system is not needed
results are not used in I-35
acceptance...
All agency central labs required to be accredited through AASHTO
are ... accreditation program AAP
Qualification/certification required to re-cert every 2-5 yrs
personnel should be... I-40
Each agency 23 CFR 637B and is required to be approved by
construction QA program FHWA
must meet I-41
The D-3665 Random 10000 numbers from 0.0000 to 1
number table contains... II-4
The purpose of random help the sampler obtain unbiased samples
numbers is to... I-1
an isolated quantity of materials from one source
that is assumed to be produced and placed by the
A lot is...
same process
II-2
ensure that samples obtained from a lot is not
Sublot are established to concentrated in one location
II-2