C51- STRUCTURAL STEEL CONTRACTOR TEST 1 QUESTIONS AND ANSWERS 100% PASS What is a sorting yard used for? - ANS Sorting steel members Tie-downs are generally used for cranes: - ANS To hold the crane body in place during shipment How do you prepare hot-rolled mill-finish steel for spray painting? - ANS It should be sandblasted first to remove rust from mill Which of the following is correct regarding air compressors? - ANS Don't use one that turns on and off What are four basic types of steel stairs? - ANS Straight, angle, curved, spiral Wire rope on equipment that has been idle for a period of _____________ or more should be inspected completely. - ANS 2 days What type of steel is designated for rivets? - ANS A502 ©THESTAR 2025 ALL RIGHTS RESERVED According to the Building Code, if a demolition of a building higher than 8 ft is taking place, what sort of protection is required within 6 ft of the building? - ANS A fence and a canopy The total of the following numbers 8 5/8", 6 1/4", 7 3/16", and 5 1/4" is ___________. - ANS 27 5/16" End columns anchored to foundations are exactly plumb only when the steel is at ___________ temperature. - ANS Normal On a crane with a relatively heavy capacity, the boom falls is secured to a ________ fastened to the back end of the crane-body frame. - ANS Gantry Who supplies the anchor bolts for a job? - ANS Structural Steel Fabricator According to the Building Code, if a structure is 8 ft or less in height, which of the following is not required when the structure is demolished? - ANS Fence and Canopy When a building is being designed, and a crane or guy derrick will have to be used, how is the building modified to accommodate the extra weight of the crane or derrick? - ANS Columns are made stronger The cost of making shop or working drawings for steel structures is usually figured by the: - ANS Number of sheets required for layout, details, erection diagrams, etc. What is commonly used as a pre-treatment for steel to improve the bond for the finish coat of paint? - ANS Zinc-based primer Referring to the drawings seen here, what is the approximate weight of the column along Grid Line E at Section CC? (No diagra

Mostrar más Leer menos
Institución
C51- STRUCTURAL STEEL CONTRACTOR
Grado
C51- STRUCTURAL STEEL CONTRACTOR









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
C51- STRUCTURAL STEEL CONTRACTOR
Grado
C51- STRUCTURAL STEEL CONTRACTOR

Información del documento

Subido en
9 de mayo de 2025
Número de páginas
11
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

©THESTAR 2025 ALL RIGHTS RESERVED




C51- STRUCTURAL STEEL
CONTRACTOR TEST 1 QUESTIONS AND
ANSWERS 100% PASS




What is a sorting yard used for? - ANS Sorting steel members



Tie-downs are generally used for cranes: - ANS To hold the crane body in place during
shipment



How do you prepare hot-rolled mill-finish steel for spray painting? - ANS It should be
sandblasted first to remove rust from mill



Which of the following is correct regarding air compressors? - ANS Don't use one that turns
on and off



What are four basic types of steel stairs? - ANS Straight, angle, curved, spiral


Wire rope on equipment that has been idle for a period of _____________ or more should be
inspected completely. - ANS 2 days



What type of steel is designated for rivets? - ANS A502

, ©THESTAR 2025 ALL RIGHTS RESERVED

According to the Building Code, if a demolition of a building higher than 8 ft is taking place,
what sort of protection is required within 6 ft of the building? - ANS A fence and a canopy


The total of the following numbers 8 5/8", 6 1/4", 7 3/16", and 5 1/4" is ___________. -
ANS 27 5/16"


End columns anchored to foundations are exactly plumb only when the steel is at ___________
temperature. - ANS Normal


On a crane with a relatively heavy capacity, the boom falls is secured to a ________ fastened to
the back end of the crane-body frame. - ANS Gantry



Who supplies the anchor bolts for a job? - ANS Structural Steel Fabricator


According to the Building Code, if a structure is 8 ft or less in height, which of the following is
not required when the structure is demolished? - ANS Fence and Canopy


When a building is being designed, and a crane or guy derrick will have to be used, how is the
building modified to accommodate the extra weight of the crane or derrick? - ANS Columns
are made stronger


The cost of making shop or working drawings for steel structures is usually figured by the: -
ANS Number of sheets required for layout, details, erection diagrams, etc.


What is commonly used as a pre-treatment for steel to improve the bond for the finish coat of
paint? - ANS Zinc-based primer


Referring to the drawings seen here, what is the approximate weight of the column along Grid
Line E at Section CC? (No diagram)(Find height of beam, drawings should have lb/ft) -
ANS 1072 lbs
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TheStar Florida State University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
584
Miembro desde
1 año
Número de seguidores
178
Documentos
23565
Última venta
1 día hace
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

117 reseñas

5
56
4
21
3
20
2
3
1
17

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes