100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Resumen

Lean Manufacturing (lean toolbox) summary

Puntuación
3.0
(5)
Vendido
29
Páginas
22
Subido en
05-04-2014
Escrito en
2013/2014

Summary study book The Lean Toolbox of John Bicheno, Matthias Holweg - ISBN: 9780954124458, Edition: 1, Year of publication: - (.)

Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

¿Un libro?
Subido en
5 de abril de 2014
Número de páginas
22
Escrito en
2013/2014
Tipo
Resumen

Temas

Vista previa del contenido

Lean Manufacturing lecture 1 (chapter 2+3) – introduction,
value and waste




Value
Value
Stream



Continuous
improvement
Excel-
Flow
lence


Pull


Core goal: Reduce lead-time by reducing waste
Side goals:
1. Improve quality
2. Reduce costs
3. Improve morale
4. Improve safety




Fast Flexible Flow


From the Low cost Working steadily
moment the flexibility at the customer
order is by a batch rate
received till size of one
the moment
the order is
delivered
1

,Lean – eliminating wastes => typically 95% of total lead time is non-value added

7 wastes (TIMWOOD) => Muda’s (Type I: Necessary, Type II: avoidable)
1. Transportation
2. Inventory
3. Motion
4. Waiting
5. Overproduction -> Worst wastes since it includes all others
6. (Over) processing
7. Defects

5 lean principles:
1. Specify the value by the point of view of the customer
2. Value stream (map and measure performance of the value stream end-to-
end, you’re only as good as the weakest link in the supply chain).
3. Flow (make value flow, avoid batch and queue or parallel batches/queues
4. Pull (short-term response to customer, only operate when needed)
5. Excellence (continuously improve).



Lean terms:
Mura -> unevenness is the process
Muri -> heavy burden (unreasonableness)
Muda -> unnecessary/waste (can be objects, opposite of
gembutsu/gemba, or steps in the process)
Gemba -> place where value is added (production plant)
4 steps: Focused on actuals from the workplace (gemba) rather than opinions
gathered from the office:
1. Go to the actual workplace
2. Look at the actual process
3. Observe what is actually happening
4. Collect the actual data
Gembutsu -> tangible objects at the gemba (machinery, tools, etc.)


Toyota way
Jidoka:
1. Automation with a human touch
2. Quality is built in during the process
3. When a problem occurs, the equipment stops immediately to prevent
defective products
4. Prerequisite for Just-in-Time to work
5. Problem communication board (andon)
Just-in-Time:
1. Make only what is needed


2

, 2. Minimize presence of non-value-adding operations
3. Optimize kanban systems
Kaizen: Continuous improvement


Reduction of lead time by applying these rules:
1. 0.05 to 5 rule: many industries value is added for between 0.05 to 5% of
the time
2. 3/3 rule: Wait time is split in three ways;
a. Waiting for completion of batch
b. Waiting for rework
c. Waiting for management decisions
3. The ¼-2-20 rule: every quartering of total completion time there is
doubling of productivity and 20% cost reduction
4. 3 x 2 rule: time based competitors enjoy 3x the average growth rate and
2x the average profit margins

Lean manufacturing lecture 2 (chapter 5) – strategy, planning
and deployment
Product process matrix page 50!

Manufacturing strategies:
1. Make-to-Stock (MTS) => cookies, chocolate bars
a. Produce to keep inventory at a satisfactory level
b. Forecasting is extremely important
c. Lead-time= order processing + delivery time
2. Assemble-to-Order/Built-to-Order (ATO/BTO) => Dell
a. Receive order before assembling the product from components
b. Lead-time= order processing + assembling time + delivery
3. Make-to-Order => packaging machines
a. Receive an order before producing the product
b. Lead-time: order processing + production + delivery
4. Engineer-to-Order => luxury yachts
a. Design, engineer and produce the product to customer specs
after receiving the order
b. Lead-time: order processing + engineering + ordering (materials)
+ manufacturing + installation/delivery




3

, Customer Order Decoupling Point (CODP
Moment in the process where the product becomes customer specific.

Kano analysis – measurement tool to prioritize customer requirements
1. ‘Surprise & delight’ factors => make your product stand out
2. More is better
3. Must be things => internet, camera, etc. on phones
4. Dissatisfiers




4
$5.73
Accede al documento completo:
Comprado por 29 estudiantes

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Reseñas de compradores verificados

Se muestran los 5 comentarios
7 año hace

7 año hace

7 año hace

8 año hace

9 año hace

3.0

5 reseñas

5
0
4
2
3
2
2
0
1
1
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TvanHattem Fontys Hogeschool
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
88
Miembro desde
11 año
Número de seguidores
71
Documentos
9
Última venta
3 año hace

2.7

13 reseñas

5
1
4
3
3
3
2
3
1
3

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes