100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12) NEWEST 2025/2026 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Puntuación
-
Vendido
-
Páginas
13
Grado
A+
Subido en
05-05-2025
Escrito en
2024/2025

ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12) NEWEST 2025/2026 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Institución
ACI - Aggregate Base Testing Technician
Grado
ACI - Aggregate Base Testing Technician

Vista previa del contenido

ACI Certification- Concrete Field Testing
Technician Grade 1 CP-1 (12)

A 6 by using 12 in. [150 mm by 300 mm] cylinder mildew may be used for concrete containing
aggregate with debris now not exceeding _____ in length, without the want for moist sieving the
concrete. - ANS-2 in. [50 mm]

A mallet weighing _____ should be used to tap the sides of the bowl after rodding every layer. -
ANS-1.25 ± zero.50 lb. (600 ± two hundred g)

A maximum temperature of freshly blended concrete is laid out in ASTM C1064. True or False?
- ANS-False

A plastic field may be used for the measure on this method. True or False? - ANS-False,
measure should be steel or different suitable metal

After finishing the strike-off system, what need to be finished before weighing the degree and
sample? - ANS-Clean off any extra concrete

After consolidation of the very last layer, an extra of concrete _____ above the pinnacle of the
degree is taken into consideration choicest. - ANS-⅛ in. [3 mm]

After molding test specimens, you need to wait hours earlier than moving them to the vicinity of
initial garage. True or False? - ANS-False; the specimens ought to be moved straight away

After rodding every layer, what should be achieved to the degree earlier than including some
other layer of concrete? - ANS-Tap the edges of the degree well 10 to 15 times with the mallet

After the very last rodding, the sides of the stoop mould need to be tapped lightly with the
tamping rod. True or False? - ANS-False

Air Content Calculation
Your air meter has been damaged in transit to the job site. You do, however, own the theoretical
density that was decided within the lab; it's far 151.4 lb/ft3 (2425 kg/m3). Using the density
calculated in Question 21, calculate the air content material of the batch (in percentage). -
ANS-five.0% = [(151.4 lb/ft3 - 143.9 lb/ft3) / 151.4 lb/ft3] × 100
5.0% = [(2425 kg/m3 - 2305 kg/m3) / 2425 kg/m3] × one hundred

, Air meter bowls used for this test need to conform to ASTM _____ and be calibrated for quantity
according
to ASTM _____. - ANS-C231, C29

ASTM C1064 - ANS-Standard Test Method For Temperature of Freshly Mixed
Hydraulic-Cement Concrete

ASTM C138 - ANS-Standard Test Method for Density (Unit Weight),
Yield, and Air Content (Gravimetric) of Concrete

ASTM C143 - ANS-Standard Test Method for Slump of Hydraulic-Cement Concrete

ASTM C172 - ANS-Standard Practice for Sampling Freshly Mixed Concrete

ASTM C173 - ANS-Standard Test Method For Air Content of Freshly Mixed Concrete by the
Volumetric Method

ASTM C231 -
ANS-StandardTestMethodforAirContentofFreshlyMixedConcretebythePressureMethod

ASTM C31 - ANS-Standard Practice for Making and Curing
Concrete Test Specimens inside the Field

ASTM Method C31 gives standardized necessities for _____, _____, _____, and _____, of take
a look at specimens. - ANS-Making, curing, shielding, transporting

At the quit of the method, the air meter is _______. - ANS-Disassembled and its contents
examined

Concrete mixtures with specific strengths of 6000 psi [40 MPa] or more shall have an initial
curing temperature among ___________. - ANS-sixty eight and 78 ºF [20 and 26 ºC]

Concrete samples from a truck mixer have to be acquired earlier than any water or admixtures
are introduced to the mixer on the activity website online. True or False? - ANS-False

Cylinders made for the reason of figuring out when a structure may be placed into provider shall
be eliminated from the molds
_________________________________________________________. - ANS-At the time of
the elimination of formwork

Cylinders that are to be discipline cured are stored ___________________________ and
guarded _______. - ANS-In or at the structure as close to to the factor of deposit of the concrete
represented as feasible; In as close to as feasible the same way because the fashioned work

Escuela, estudio y materia

Institución
ACI - Aggregate Base Testing Technician
Grado
ACI - Aggregate Base Testing Technician

Información del documento

Subido en
5 de mayo de 2025
Número de páginas
13
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$15.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Legitexams Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
60
Miembro desde
1 año
Número de seguidores
1
Documentos
1201
Última venta
2 días hace

Welcome To my Store My Goal is to help you achieve your desired grades by providing credible study materials I'm happy to help you with quality documents On this page you will find quality study guides, Exams assignments, Research papers and Test Banks all verified correct . you'll find past and recent revised and verified study materials . Stay here and You'll find everything you need to pass !!! . I always ensure my documents are of high standards Be assured to get good grades and always leave a review after a purchase Refer a friend SUCCESS!!!!

Lee mas Leer menos
3.2

25 reseñas

5
12
4
1
3
2
2
0
1
10

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes