100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

ACI Concrete Field Testing Technician- Grade I NEWEST 2025/2026 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Puntuación
-
Vendido
-
Páginas
11
Grado
A+
Subido en
05-05-2025
Escrito en
2024/2025

ACI Concrete Field Testing Technician- Grade I NEWEST 2025/2026 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Institución
ACI - Aggregate Base Testing Technician
Grado
ACI - Aggregate Base Testing Technician

Vista previa del contenido

ACI Concrete Field Testing Technician-
Grade I

A 6 by way of 12 in [150 mm by 300 mm] cylinder mould may be used for concrete containing
aggregate with debris now not exceeding _____ in size, with out the want for moist sieving the
concrete. - ANS-2 in. [50 mm]

A composite sample of concrete is needed even if the simplest cause for obtaining the pattern is
to decide temperature. True of False? - ANS-False

A mallet weighing ____ should be used to faucet the perimeters of the bowl after rodding each
layer. - ANS-1.25 +- zero.50 lb. (six hundred +- 200 g)

A most temperature of freshly combined concrete is specified in ASTM C1064. True of False? -
ANS-False

A plastic field may be used for the degree in this approach. True or False? - ANS-False, degree
need to be steel or any other appropriate steel

According to ASTM C1064, what's one cause to take the temperature of concrete? - ANS-Verify
conformance to a certain requirement for temperature of concrete

After finishing the strike-off technique, what have to be done before weighing the measure and
pattern? - ANS-Clean off any excess concrete

After consolidation of the very last layer, an excess of concrete ____ above the pinnacle of the
measure is considered premier. - ANS-1/8 in. [3 mm]

After molding check specimens, you have to wait hours earlier than shifting them to the place of
preliminary garage. True or False? - ANS-False; the specimens must be moved right away

After rodding every layer, what have to be executed to the degree before adding another layer
of concrete? - ANS-Tap the perimeters of the measure well 10 to fifteen instances with the
mallet

After the very last rodding, the edges of the droop mildew need to ought to be tapped lightly with
the tamping rod. True or False? - ANS-False

After the temperature of the concrete is read, what is required? - ANS-Reporting of temperature

, Air meter bowls used for this check should comply with ASTM _____ and be calibrated for
volumee according to ASTM _____. - ANS-C231, C29

ASTM Method gives standardized necessities for _____, _____, _____, and _____, of check
specimens. - ANS-Making, curing, shielding, transporting

At the stop of the process, the air meter is _____. - ANS-Disassembled and its contents tested

Concrete mixtures with special strengths of 6000 psi [40 MPa] or more shall have an initial
curing temperature between __________. - ANS-68 and 78 degrees F [20 and 26 C]

Concrete samples from a truck mixer have to be acquired earlier than any water or admixtures
are added to the mixer at the process web page. True or False? - ANS-False

Cylinders made for the purpose of figuring out when a structure may be placed into provider
shall be eliminated from the mould __________. - ANS-At the time of the removal of formwork

Cylinders which might be to be area cured are stored __________ and guarded __________. -
ANS-In or on the shape as close to to the factor of deposit of the concrete represented as
viable; In as close to as feasible the same manner because the shaped paintings

During transportation, check specimens ought to be protected from damage due to _____,
_____, and _____. - ANS-Jarring, freezing temperatures, moisture loss

Each layer need to fill approximately _____ the extent of the mould. - ANS-One-0.33

Field Curing is the curing technique used when test specimens are to be used for __________.
- ANS-Determination of whether or not the shape is able to being placed into carrier;
Comparison with preferred cured specimens check results or with outcomes from numerous
in-region take a look at methods; Adequacy of curing and protection of concrete in the Structure,
or Form or shoring elimination time requirements

For a measure of 0.5 feet^three [14 L], what's the specified range of strokes of the tamping rod
for consolidation of every layer? - ANS-25

For concrete with a slump of much less than 1 in. [25 mm], the check specimens have to be
consolidated with the aid of _____. - ANS-Vibration

For cylinders with a diameter of 6 in. [150 mm] or greater, the tamping rod must be a spherical,
straight steel rod with a diameter of _____. - ANS-5/8 +- 1/16 in [16 mm +- 2 mm]

For use in the droop check, the give up or both ends of the tamping rod need to be _____. -
ANS-Rounded to a hemispherical tip

Escuela, estudio y materia

Institución
ACI - Aggregate Base Testing Technician
Grado
ACI - Aggregate Base Testing Technician

Información del documento

Subido en
5 de mayo de 2025
Número de páginas
11
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$15.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Legitexams Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
60
Miembro desde
1 año
Número de seguidores
1
Documentos
1201
Última venta
2 días hace

Welcome To my Store My Goal is to help you achieve your desired grades by providing credible study materials I'm happy to help you with quality documents On this page you will find quality study guides, Exams assignments, Research papers and Test Banks all verified correct . you'll find past and recent revised and verified study materials . Stay here and You'll find everything you need to pass !!! . I always ensure my documents are of high standards Be assured to get good grades and always leave a review after a purchase Refer a friend SUCCESS!!!!

Lee mas Leer menos
3.2

25 reseñas

5
12
4
1
3
2
2
0
1
10

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes