100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

IT 346 IT Project Management Comprehensive Final Exam 2025 (With Solns

Puntuación
-
Vendido
-
Páginas
40
Subido en
03-05-2025
Escrito en
2024/2025

IT 346 IT Project Management Comprehensive Final Exam 2025 (With SolnsIT 346 IT Project Management Comprehensive Final Exam 2025 (With SolnsIT 346 IT Project Management Comprehensive Final Exam 2025 (With Solns

Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
3 de mayo de 2025
Número de páginas
40
Escrito en
2024/2025
Tipo
Examen
Contiene
Desconocido

Temas

Vista previa del contenido

IT 346 Information Technology Project
Management

Comprehensive Final Exam (Qns & Ans)

2025
Question 1 (Multiple Choice)
Question:
Which project management methodology is best known for its
iterative, incremental approach involving “sprints” and regular
stakeholder feedback, making it particularly suited for dynamic IT
projects?
A) Waterfall
B) Agile
C) PRINCE2
D) Critical Chain


Correct ANS:
B) Agile
©2025

, Rationale:
Agile methodologies focus on iterative development, frequent
feedback, and adaptive planning. This flexible approach is
particularly useful for IT projects where requirements may
evolve, enabling teams to continuously adjust and deliver
incremental value.


---


Question 2 (Fill in the Blank)
Question:
The systematic process of identifying, analyzing, and prioritizing
potential project risks in order to mitigate their impact is known
as ________ management .


Correct ANS:
risk


Rationale:
Risk management in IT projects involves forecasting potential
issues, quantifying their impact, and planning mitigation
strategies. This proactive process is essential for minimizing
disruptions and ensuring project success.
©2025

,---


Question 3 (True/False)
Question:
True/False: Earned Value Management (EVM) is an effective
technique in IT project management because it integrates cost,
time, and scope performance to provide a clear picture of project
progress and variances.


Correct ANS:
True


Rationale:
EVM combines actual project performance against planned
baselines by measuring cost and schedule variances. This
integrated approach provides early warning signals and supports
informed decision-making for corrective actions.


---


Question 4 (Multiple Response)

©2025

, Question:
Select all components that are considered part of the classic Triple
Constraint in project management:
A) Scope
B) Time
C) Cost
D) Quality
E) Risk


Correct ANS:
A, B, C


Rationale:
The Triple Constraint traditionally consists of scope, time, and
cost. Although quality is a critical aspect of overall project
success, it is generally viewed as an outcome that results from
balancing the three constraints rather than being a core element of
the traditional model.


---


Question 5 (Multiple Choice)
©2025
$14.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Bankart Chamberlain College of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
150
Miembro desde
2 año
Número de seguidores
31
Documentos
4512
Última venta
1 semana hace

3.6

21 reseñas

5
9
4
0
3
9
2
1
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes