What element is targeted by water quality criteria? - ANSWER Phosphorous, it indicates pollution by bonding with other pollutants. At what % impervious cover are streams substantially affected? - ANSWER 25% what is the site-based load limit for water quality? - ANSWER 0.41 lbs/acre/yr total phosphorous

Mostrar más Leer menos
Institución
VA Deq Swm Inspector
Grado
VA deq swm inspector









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
VA deq swm inspector
Grado
VA deq swm inspector

Información del documento

Subido en
2 de mayo de 2025
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

VA DEQ SWM INSPECTOR EXAM
CORRECT QUESTIONS & ANSWERS||
2025 LATEST UPDATE!!
What element is targeted by water quality criteria? - ANSWER Phosphorous, it indicates
pollution by bonding with other pollutants.

At what % impervious cover are streams substantially affected? - ANSWER 25%

what is the site-based load limit for water quality? - ANSWER 0.41 lbs/acre/yr total
phosphorous

Virginia Runoff Reduction Method- method of load calculations - ANSWER load
calculations based on land cover type and soil type.

what must happen to potentially harmful sheet flow runoff? - ANSWER Must be diverted
to stormwater conveyance system.

SWM ponds must be able to convey water safely up to what level storm event? -
ANSWER must be able to safely convey up to a 100 yr storm.

Define LDA - ANSWER Land disturbing activity; any man-made change to the land
surface that potentially changes its runoff characteristics; includes clearing, grading, and
excavation.

What size LDA must comply with stormwater management regulation? in CPBA areas?
- ANSWER anything of 1 acre or more, or 2500 ft^2 in CPBA areas; may be more
stringent locally.

what are some activities exempt from SWM regulations? - ANSWER mining, agriculture,
sewer discharges, local reclamation programs, routine maintenance of preexisting
operations, public emergency activity

what term basically means a plea deal for stormwater offenders? - ANSWER consent
order, which replaces penalties with fines.

how long does VSMP authority have to review SWM plan? - ANSWER 15 days to
review and determine approval, and notify applicant.

How often must a VSMP authority inspect an LDA? - ANSWER Periodically.

all SWPPP requirements may be met by - ANSWER incorporating other plans into
reference, or by developing missing elements.

, What must the DEQ issue to an operator before an LDA? - ANSWER a construction GP

How soon after final grade of a site must vegetation be put in place? - ANSWER within
7 days.

How many days does DEQ have to complete review of real or potential inter-
jurisdicitonal impacts upon request? - ANSWER 90 days

Who is required to maintain a certificate of competency by the Stormwater Management
Act? - ANSWER staff of a stormwater program, anyone contracted by a VSMP
authority, and all standard and specification holders

A SWM Plan must be approved by who prior to land disturbance? - ANSWER the
VSMP Program Authority

What is the TP limit for a site? - ANSWER 0.41 lbs/ac/yr

The phosphorus load limit uses what % impervious cover? - ANSWER 10%

Part II B and II C water quantity criteria addresses: - ANSWER channel protection and
flood protection

Of all the plans included in the SWPPP, which two must be approved? - ANSWER the
SWM and ESC Plans

Does a SWM plan address runoff during or after construction? - ANSWER post-
construction

What is the lower limit of imperviousness which could result in stream degradation? -
ANSWER 10%

If land disturbance occurs as a result of emergency work, what is the timeline for
advising the VSMP authority of the disturbance? - ANSWER within 7 days of
commencing the LDA and a permit application must be submitted within 30 days

DEQ is responsible for enforcing the ______ while locality _______ are responsible for
enforcing local ordinances. - ANSWER Construction GP, VSMP

BMPs use these three mechanisms to control pollution: - ANSWER Infiltration, settling,
and vegetative uptake

How long does a locality VSMP authority have to determine the completeness of a
SWM plan? - ANSWER 15 days
$16.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
shantelleG West Virgina University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
609
Miembro desde
2 año
Número de seguidores
368
Documentos
17845
Última venta
7 horas hace
GOLD PREMIUM

HELLO? welcome to my store thanks for visiting this page here you are guaranteed of well revised and assured EXAMS ALL GRADED A+ thus making your education journey easy and seamless . DO NOT HESITATE TO CONTACT ME IF YOU ARE IN NEED OF ANY EXAM .I AM READY 24/7 TO ASSIST YOU ALSO REFER YOUR FRIENDS.

4.1

115 reseñas

5
69
4
10
3
22
2
2
1
12

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes