100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Otro

GE CCC EXAM STUDY GUIDE

Puntuación
-
Vendido
-
Páginas
16
Subido en
01-05-2025
Escrito en
2024/2025

GE CCC EXAM STUDY GUIDE

Institución
GE CCC
Grado
GE CCC

Vista previa del contenido

GE CCC EXAM STUDY GUIDE
Define: General Engineering - Answers :Those engineering capabilities and activities,
other than combat engineering, that modify, maintain, or protect the physical
environment.

Examples include: the construction, repair, maintenance, and operation of
infrastructure, facilities, lines of communication and bases; terrain modification and
repair; and selected explosive hazards activities.
(ATP 3-34.40 General Engineering)

Base Camp Principles - Answers :Scalability:
- ability to tolerate population fluctuations and incorporate changes in the base camp
mission, level of services, or force protection level, without the need for redesign.

Sustainability:
- ability to maintain the necessary level and duration of sustainment/logistics support to
achieve military objectives.

Standardization:
- The Standardization of base camp policies, Service standards, guidance, system
solutions, standard designs, and construction provides consistent expectations for
commanders and drives the repetitive use of proven best practices and TTP

Survivability:
- A primary purpose of base camps is providing a protected location from which to
project and sustain combat power.

Types of Base Camps - Answers :Base: A locality from which operations are projected
or supported (JP 3-10)

Base Camp: A base camp is an evolving military facility that supports the military
operations of a deployed unit and provides the necessary support and services for
sustained operations.

Intermediate Staging Base: A tailorable, temporary location used for for staging forces,
sustainment, and/or extraction into and out of an operational area.

Forward Operating Base: An area used to support tactical operations without
establishing full support facilities

Base Camp Duration - Answers :Phase: Contingency
• Organic - Up to 90 Days

• Initial - Up to 6 months

,• Temporary - Up to 5 years

• Semi permanent - 2-10 years

Phase: Enduring
• Permanent - 5 years or longer

Base Camp Life Cycle - Answers :Planning and Design

Construction

Operations

Transfer & Closure

USACE Contingency Elements (UCE) - Answers :1. FEST-A or RT (Forward Engineer
Support Team-Advance or Reconnaissance Team)

2. Advanced Echelon (ADVON) Team

3. Contingency Engineer District (CED)

Types of Technical Reconnaissance - Answers :Infrastructure Assessment and
Reconnaissance: Think SWEAT-MSO. Sewage, Water, Electricity, Academics, Trash,
Medical, Safety, Other Considerations

Environment Assessment: focused on collecting technical information on existing
environmental conditions and identifying areas that are environmentally sensitive or of
relative environmental concern.

Airfield Assessment: An airfield assessment is conducted to collect detailed technical
information on selected airfields and heliports. The information collected can be used to
determine the airfield operating capacity and to estimate resources for repair or upgrade
of the airfield and its supporting facilities.

Route Classification: Route reconnaissance is normally a combat engineer task. Route
classification is normally a GE task. Executing a route classification is executed as
hasty or deliberate.

Types of Tactical Reconnaissance - Answers :Bridge Reconnaissance
• Bridge Site Reconnaissance:
access and approach roads, widths, banks, flow characteristics, stream bottoms,
elevations, materials.
• Existing Bride: determine whether the situation warrants emplacing a tactical, support,
or LOC bridge.

, Route Reconnaissance
• The information from route reconnaissance supports route selection decisions.
Classified as hasty or deliberate.
• Hasty route reconnaissance determines the immediate military trafficability of a
specified route.
• A deliberate route reconnaissance is conducted when sufficient time and qualified
technical personnel are available.

Obstacle Reconnaissance

Reconnaissance Support: Tools and Resources - Answers :•ENGINEER RESEARCH
AND DEVELOPMENT CENTER (ERDC)

•REACHBACK OPERATIONS CENTER

•TELEENGINEERING COMMUNICATIONS EQUIPMENT-DEPLOYABLE

•TELEENGINEERING TOOLKIT

•AUTOMATED ROUTE RECONNAISSANCE KIT

Real Estate - Answers :Authority delegated to Assistant Secretary of the Army who
further delegates it to United States Army Corps of Engineers (USACE).

Real Estate is essentially a collection of real property

Real Property - Answers :A building, structure, utility system, or land.

In garrison, Real Property is managed by the Department of Public Works (DPW)

Five Component of Concrete - Answers :Portland Cement

Water

Aggregates
- Coarse (many types)
- Fine

Air

Admixtures

Concrete is strong in ____ not in ____ - Answers :Concrete is strong in compression not
in tension

Escuela, estudio y materia

Institución
GE CCC
Grado
GE CCC

Información del documento

Subido en
1 de mayo de 2025
Número de páginas
16
Escrito en
2024/2025
Tipo
Otro
Personaje
Desconocido

Temas

$14.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA YALA UNIVERSITY
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2018
Miembro desde
4 año
Número de seguidores
1447
Documentos
49142
Última venta
6 horas hace

3.8

345 reseñas

5
172
4
61
3
44
2
16
1
52

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes