100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

SHP Final Exam Questions and Answers 100% Pass

Puntuación
-
Vendido
-
Páginas
8
Grado
A+
Subido en
01-05-2025
Escrito en
2024/2025

©JASONMcCONNELL 2025 ALL RIGHTS RESERVED 1 SHP Final Exam Questions and Answers 100% Pass True - AnswerThe firefighter may be installed next to a stand-alone battery smoke detector False - AnswerWhen performing a full system test, you may bypass any open doors or windows Always enable the emergency - AnswerWhen programming an skey1,you must False - AnswerWhen running power to the take345,polarity doesn't apply Audible alarm (7) - AnswerWhen programming the emergency key for the skey1,which zone/sensor type is used. True - AnswerWhen installing a smkt3,you must use the included screws and anchors True - AnswerWhen installing the firefighter, it is required to test the customers existing smoke detectors Between 6"(15cm) and 2'(61cm) from floor - AnswerWhen installing a Dw21, where is the approved location for the sensor ©JASONMcCONNELL 2025 ALL RIGHTS RESERVED 2 Provided double sided tape - AnswerWhen installing a dw11 on a vinyl or metal frame, what should primarily use to mount the sensor Beans & wire caps - AnswerWhich of the following materials can you use to group multiple ground terminals in a takeover. Smoke detector - AnswerWhich of the following sensors are you not allowed to program using a translator True - AnswerWhen installing the take345, you must always test the new 12v battery before using it. 16.5 - AnswerWhat is the output voltage of transformer used to power the sky control 12" - AnswerWhat is the minimum distance for placement of a co3 from the corners of the wall False - AnswerThe smkt3 has 2 function:smoke and heat detection Loop 1 Zone 14 - AnswerHow would you program a co3 if mounted on a hallway wall False - AnswerWhen installing a translator, you must program all of the existing sensors as new equipment on the panel True - AnswerThe dw21 should always be installed in the door frame (09) Smoke detector. (09) Heat detector. (08) Freeze - AnswerWhich of the following zone/sensor types are correct when programming an smkt3

Mostrar más Leer menos
Institución
SHP
Grado
SHP

Vista previa del contenido

©JASONMcCONNELL 2025 ALL RIGHTS RESERVED




SHP Final Exam Questions and Answers
100% Pass




True - Answer✔The firefighter may be installed next to a stand-alone battery smoke detector



False - Answer✔When performing a full system test, you may bypass any open doors or
windows



Always enable the emergency - Answer✔When programming an skey1,you must



False - Answer✔When running power to the take345,polarity doesn't apply



Audible alarm (7) - Answer✔When programming the emergency key for the skey1,which
zone/sensor type is used.



True - Answer✔When installing a smkt3,you must use the included screws and anchors



True - Answer✔When installing the firefighter, it is required to test the customers existing
smoke detectors



Between 6"(15cm) and 2'(61cm) from floor - Answer✔When installing a Dw21, where is the
approved location for the sensor




1

, ©JASONMcCONNELL 2025 ALL RIGHTS RESERVED


Provided double sided tape - Answer✔When installing a dw11 on a vinyl or metal frame, what
should primarily use to mount the sensor



Beans & wire caps - Answer✔Which of the following materials can you use to group multiple
ground terminals in a takeover.



Smoke detector - Answer✔Which of the following sensors are you not allowed to program
using a translator



True - Answer✔When installing the take345, you must always test the new 12v battery before
using it.



16.5 - Answer✔What is the output voltage of transformer used to power the sky control



12" - Answer✔What is the minimum distance for placement of a co3 from the corners of the
wall



False - Answer✔The smkt3 has 2 function:smoke and heat detection



Loop 1 Zone 14 - Answer✔How would you program a co3 if mounted on a hallway wall



False - Answer✔When installing a translator, you must program all of the existing sensors as
new equipment on the panel



True - Answer✔The dw21 should always be installed in the door frame



(09) Smoke detector. (09) Heat detector. (08) Freeze - Answer✔Which of the following
zone/sensor types are correct when programming an smkt3



2

Escuela, estudio y materia

Institución
SHP
Grado
SHP

Información del documento

Subido en
1 de mayo de 2025
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
StarGuide Liberty University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
16
Miembro desde
1 año
Número de seguidores
0
Documentos
2591
Última venta
3 semanas hace
FIRST CLASS GALORE

Accurate Exam Study Materials.Verified And Updated By Professionals.

4.3

4 reseñas

5
1
4
3
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes