100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

BICSI RTPM Exam Guide Questions with Answers 2025 Update

Puntuación
-
Vendido
-
Páginas
50
Grado
A
Subido en
01-05-2025
Escrito en
2024/2025

design and implementation/installation - Answer-Telecommunications project management (TPM) typically consists of two distinct processes: Design PM Tasks - Answer-Review expression of interest for client Perform a user needs analysis Perform site surveys and meet with client Generate preliminary design submittals Respond to/incorporate client comments Prepare final bid documents/RFP and engineer's cost estimate Issue final RFP package to client Client makes RFP available to potential bidders Implementation of TPM Project Flowchart - Answer-Review client RFP Perform Site Survey Organize and Submit Bid Questions Organize and Submit Final Proposal Client Awards Contract NTP Contractor Mobilizes Project Implementation Project - Answer-Temporary endevour that has a definite beginning and end, whose end result is the delivery of a product or service. Projects are governed by limits (constraints). Project Constraints - Answer-Time, Cost, Quality, Resources, Risks, Safety, Technology, Stakeholders, Environment Project Stakeholders - Answer-Sponsor Portfolio Manager Client Sellers Business Partner Operations Manager Functional Manager Project Manager Program Manager Project Team Members - Answer-Manufacturer Engineer Government / Regulatory Supplier Vendor Admin/ Clerical Supervisor Other Trades Consultant Coworker Customer ICT Professional's Role is Affected By: - Answer-Current & future technology Availability of resources Complex equipment Advanced tools Constant refinement of standards International, National, Regional and Local Codes Intricate and evolvoing designs Phases of a Project - Answer-Design Bidding Construction Post-Construction PM Tools - Answer-Program Evaluation Review Technique (PERT) Gantt - Schedule of activity, bar chart Critical Path Management Earned Value Management TPM Steps - Answer-Developing a Plan Implementing the Plan Managing/ Tracking the Plan Closeout the Project TPM Knowledge Areas - Answer-Integration Scope Time Cost Quality Human Resources Communications Risks Procurement Stakeholders Human Resource Management - Answer-Personnel issues, engaging the right people to do the job, (trained, equipped, motivated) Project Safety Scope Management - Answer-Development of a scope statement, approved by client and compay Scope statement defines type/ amount/ limits of the work to be performed Scope is the fence around the project Integration Management - Answer-Breaks up multiple small projects to one big project One big project broken down to multiple small projects Integration of subteams into project organization with integrated plan Time Management - Answer-Time estimate and schedules Integration of time schedules from various subteams and calculation of the critical path of events on the project Cost Management - Answer-Cost estimate and project budget Quality Management - Answer-Detailed review of the design documentation throughout the project If ICT completes build, include test results and workmanship Client value Items Communications Management - Answer-Scheduled meetings and the use of electronic media War room - to post schedule and project results on a whiteboard Risk Management - Answer-Injury Professional damage Scheduling conflicts Errors & omissions Cost risks When should the risk management plan be completed? - Answer-Before a company submits a proposal

Mostrar más Leer menos
Institución
BICSI RTPM
Grado
BICSI RTPM











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
BICSI RTPM
Grado
BICSI RTPM

Información del documento

Subido en
1 de mayo de 2025
Número de páginas
50
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

BICSI RTPM 2025


BICSI RTPM Exam Guide Questions with
Answers 2025 Update
design and implementation/installation - Answer-Telecommunications project
management (TPM) typically consists of two distinct processes:



Design PM Tasks - Answer-Review expression of interest for client

Perform a user needs analysis

Perform site surveys and meet with client

Generate preliminary design submittals

Respond to/incorporate client comments

Prepare final bid documents/RFP and engineer's cost estimate

Issue final RFP package to client

Client makes RFP available to potential bidders



Implementation of TPM Project Flowchart - Answer-Review client RFP

Perform Site Survey

Organize and Submit Bid Questions

Organize and Submit Final Proposal

Client Awards Contract NTP

Contractor Mobilizes

Project Implementation

,BICSI RTPM 2025


Project - Answer-Temporary endevour that has a definite beginning and end, whose end
result is the delivery of a product or service. Projects are governed by limits
(constraints).



Project Constraints - Answer-Time, Cost, Quality, Resources, Risks, Safety, Technology,
Stakeholders, Environment



Project Stakeholders - Answer-Sponsor

Portfolio Manager

Client

Sellers

Business Partner

Operations Manager

Functional Manager

Project Manager

Program Manager



Project Team Members - Answer-Manufacturer

Engineer

Government / Regulatory

Supplier

Vendor

Admin/ Clerical

Supervisor

Other Trades

,BICSI RTPM 2025


Consultant

Coworker

Customer



ICT Professional's Role is Affected By: - Answer-Current & future technology

Availability of resources

Complex equipment

Advanced tools

Constant refinement of standards

International, National, Regional and Local Codes

Intricate and evolvoing designs



Phases of a Project - Answer-Design

Bidding

Construction

Post-Construction



PM Tools - Answer-Program Evaluation Review Technique (PERT)

Gantt - Schedule of activity, bar chart

Critical Path Management

Earned Value Management



TPM Steps - Answer-Developing a Plan

Implementing the Plan

, BICSI RTPM 2025


Managing/ Tracking the Plan

Closeout the Project



TPM Knowledge Areas - Answer-Integration

Scope

Time

Cost

Quality

Human Resources

Communications

Risks

Procurement

Stakeholders



Human Resource Management - Answer-Personnel issues, engaging the right people to
do the job, (trained, equipped, motivated)

Project Safety



Scope Management - Answer-Development of a scope statement, approved by client
and compay

Scope statement defines type/ amount/ limits of the work to be performed

Scope is the fence around the project



Integration Management - Answer-Breaks up multiple small projects to one big project

One big project broken down to multiple small projects
$18.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
Tommrexy
4.0
(1)

Conoce al vendedor

Seller avatar
Tommrexy Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2
Miembro desde
1 año
Número de seguidores
0
Documentos
111
Última venta
7 meses hace

4.0

1 reseñas

5
0
4
1
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes