graded A+
what would be the volume of a room that measures 7 meters long by 6 meters wide and
3 meters high - answer126 meters = 7*6*3
What would a mechanical drawing be used for? - answerlocation of heating , plumbing
and ventilation in a venue
How is the volume of a space calculated - answerLength times width times hight
What is the most important in formation to be gathered on a site visit - answerroom size
and layout
When conducting a site visit if a ladder is needed what type of ladder should be used
and why? - answerfiberglass or wood in case a surface might be electrified
A scale drawing unit of 1/1:20 signifies what type of scale-drawing measurement? -
answera common metric scale
When considering customer constraints for ___, the signal type, distance from viewers,
aspect ratio and source resolution are all limiting factors. - answerimage display
When documenting requirements for network services, a formal technical document
called a(n) _______ is often utilized. - answerSLA( service level agreement)
One major difference between the Service Level Agreement process and the traditional
Program Report is the SLA focuses upon - answerMeasurement of service through
monitoring procedures
"When gathering and documenting site information and requirements for the overall
functional needs of an AV system, a document called the _____ is usually produced." -
answerprogram report
"When gathering and documenting site information and requirements for the overall
functional needs of an AV system, a document called the _____ is usually produced." -
answer" Take pictures for reference and note any potential conflicts or obstructions"
"When collecting information during a site survey, it is good practice to do which of the
following?" - answer"Take pictures for reference and note any potential conflicts or
obstructions"