LEED AP ID+C Practice Test C 2025 Questions and Answers 100% Pass If a building includes a multiple-zone recirculating system and the project team wants to increase ventilation for IEQ Credit Enhanced IAQ Strategies, which action will likely need to occur? - Increasing the required outdoor air intake for the system by more than 30% Flow rate calculation - (gallons per cycle x 60 seconds) / cycle duration (seconds) = flow rate In a goal-setting workshop, which info should be documented for IP Credit Integrative Process? - OPR and BOD -For this credit the analysis done is used to inform the OPR and BOD. The OPR is used to create the BOD A retail project is determining the best quality lighting to help showcase products for sale. What will be required of the project to achieve Lighting Quality for EQ Credit Interior Lighting? - Provide controls in sales areas that can reduce ambient lighting to a midlevel. Two things are additionally required for retail projects: -For at least 90% of the individual occupant spaces in office and administrative areas, provide individual lighting controls. 2COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED -In sales areas, provide controls that can reduce the ambient light levels to a midlevel (30% to 70% of the max illumination level not including daylight contributions) How can a project team avoid errors and expenses in LEED documentation prior to submitting the project for review? - Proofreading, checking numerical values (FTE, site area, etc.) are consistent across credits, and checking the application for completeness all cuts down on errors and additional expenses What design decisions will help a project earn points under the prescriptive path of EA Credit Optimize Energy Performance? - -Install occupancy sensors for at least 75% of the connected lighting load (1 pt for Interior Lighting Controls) -Comply with the recommendations in the appropriate ASHRAE 50% Advanced Energy Design Guide for all vertical fenestration (2 pts for Building Envelope, Glazing) When designing for flexibility, project teams should focus on the portions of the project typically subject to change, which include all of the following... - The credit focuses on the space plan, services, and movable items Which simulations must be performed if a project team wants to achieve the most points for EQ Credit Daylight? - Two simulations are performed for Option 1 that can earn up to 3 points for the credit: sDA and ASE A product will count toward the achievement of MR Credit BD&O-Sourcing of Raw Material in all EXCEPT: - The report is published

Mostrar más Leer menos
Institución
LEED
Grado
LEED









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
LEED
Grado
LEED

Información del documento

Subido en
26 de abril de 2025
Número de páginas
11
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

LEED AP ID+C Practice Test C 2025
Questions and Answers 100% Pass


If a building includes a multiple-zone recirculating system and the project team wants
to increase ventilation for IEQ Credit Enhanced IAQ Strategies, which action will likely
need to occur? - ✔✔Increasing the required outdoor air intake for the system by more
than 30%

Flow rate calculation - ✔✔(gallons per cycle x 60 seconds) / cycle duration (seconds) =
flow rate

In a goal-setting workshop, which info should be documented for IP Credit Integrative
Process? - ✔✔OPR and BOD

-For this credit the analysis done is used to inform the OPR and BOD. The OPR is used
to create the BOD

A retail project is determining the best quality lighting to help showcase products for
sale. What will be required of the project to achieve Lighting Quality for EQ Credit
Interior Lighting? - ✔✔Provide controls in sales areas that can reduce ambient lighting
to a midlevel.

Two things are additionally required for retail projects:

-For at least 90% of the individual occupant spaces in office and administrative areas,
provide individual lighting controls.



COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 1

, -In sales areas, provide controls that can reduce the ambient light levels to a midlevel
(30% to 70% of the max illumination level not including daylight contributions)

How can a project team avoid errors and expenses in LEED documentation prior to
submitting the project for review? - ✔✔Proofreading, checking numerical values (FTE,
site area, etc.) are consistent across credits, and checking the application for
completeness all cuts down on errors and additional expenses

What design decisions will help a project earn points under the prescriptive path of EA
Credit Optimize Energy Performance? - ✔✔-Install occupancy sensors for at least 75%
of the connected lighting load (1 pt for Interior Lighting Controls)

-Comply with the recommendations in the appropriate ASHRAE 50% Advanced
Energy Design Guide for all vertical fenestration (2 pts for Building Envelope, Glazing)

When designing for flexibility, project teams should focus on the portions of the project
typically subject to change, which include all of the following... - ✔✔The credit focuses
on the space plan, services, and movable items

Which simulations must be performed if a project team wants to achieve the most
points for EQ Credit Daylight? - ✔✔Two simulations are performed for Option 1 that
can earn up to 3 points for the credit: sDA and ASE

A product will count toward the achievement of MR Credit BD&O-Sourcing of Raw
Material in all EXCEPT: - ✔✔The report is published no less than 12 months prior to the
substantial completion of the project

Does count:

-The report covers a period that ends within one year of the project's registration date

-The report is published within 1 year of the project's LEED registration date

-The report is current for the product at the time of installation



COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 2
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GraceAmelia West Virginia University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
90
Miembro desde
1 año
Número de seguidores
32
Documentos
8992
Última venta
1 día hace
GraceAmelia\'s Emporium

Get a well Researched and Accurate Study Materials to Boost Your Grades and Excel Academically Offered by Seller Grace.

2.8

8 reseñas

5
2
4
1
3
1
2
1
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes