A project team is working on the preliminary calculations for reusing interior
nonstructural elements for MR Credit Interiors Life-Cycle Impact Reduction (MRC2).
How should the reused interior be quantified? - ✔✔the surface area of the materials
A tenant is moving into a new space and is planning for the future growth of the
company. What project feature allows the space to be changed more easily to support
growth? - ✔✔demountable partitions
Which project team members' presence on a project would help meet the requirements
of multiple credits for a prospective LEED ID+C Retail project? - ✔✔LEED AP ID+C
and a qualified CxA
Which project strategy would earn an exemplary performance point under IN credit
Innovation Option 3 Additional Strategies? - ✔✔achieving double the credit
requirements or the next incremental percentage threshold
What best defines the project boundary? - ✔✔Platted property line of the project
defining land and water within it
Under what circumstances are projects exempt from WE Prerequisite Indoor Water Use
Reduction? - ✔✔When fixtures or fittings are not within the tenant spaces
COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 1
, Which of the following may be considered a unique and nonstandard fixture? -
✔✔Toilets with flush valve control and separate bowls, prison fixtures, children's
toilets, squat (floor-mounted) toilets
The LEED reviewer response from a preliminary review indicates a project will be 1
point short of LEED Platinum. What should the project team do if they still want to
pursue LEED Platinum? - ✔✔Submit new or revised documentation for credits that
were denied or require more information, or attempt additional credits before
submitting the final review
Which water-using equipment can be excluded from the 20% reduction threshold of
WE Prerequisite Indoor Water Use Reduction? - ✔✔Janitor's sink, fixtures regulated by
health codes, coffee maker
What is the threshold for an sDA simulation? - ✔✔300 lux for 50% of the hours between
8AM and 6PM local time for a full calendar year
Which 2 systems need to be metered for individual energy use for EA Credit Advanced
Energy Metering? - ✔✔-Two space-cooling systems that each use 6% of the total annual
consumption of the tenant space
-Interior lighting that represents 13% of the total annual consumption of the tenant
space
(any individual energy end uses that represent 10% or more of the total annual
consumption of the tenant space)
A CxA has finished preparing their Cx report for the building owner, and the project
team is compiling the current facility requirements (CFR) and operations and
maintenance (O&M) plan. Which information should the CFR and O&M plan include to
operate a building efficiently by the facility manager? - ✔✔Set points for all HVAC
equipment, sequence of operations for the building, lighting levels