Questions and Answers 100% Pass
After an office space was completed in June, a project team took daylight
measurements in all regularly occupied spaces. Which action must occur for the project
to earn EQ Credit Daylight? - ✔✔A second set of measurements must be taken in
October to determine compliant floor areas.
What is the benefit of preparing a concept model for compliance with IP Credit
Integrative Process? - ✔✔It can form the basis of the preliminary energy model for a
tenant-level energy simulation
-When doing a tenant-level energy simulation for EA Prerequisite Option 1, teams must
engage a qualified energy modeler to create a preliminary model to aid in design
decisions. This model will help as long as there is time to alter the design.
-The concept model prepared the project team to create the simple box energy analysis
that is part of the Integrative Credit and that can be used as the basis of the preliminary
model. The preliminary model analyzes building design configurations and heating and
cooling load reduction strategies and is used for Option 1.
Design or locate the project such that a functional entry and/or bicycle storage is within
a 200-yd walking distance or bicycling distance from a bicycle network that connects to
at least one of the following: - ✔✔-at least 10 diverse uses
COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 1
, -a school or employment center, if the project total floor area is 50% or more residential
-a bus rapid transit stop, light or heavy rail station, commuter rail station, or ferry
terminal
All destinations must be within a 3-mile bicycling distance of the project boundary.
A project team is designing a tenant space in the top 3 floors of a 50-story high-rise
building. WaterSense labeled fixtures and fittings are being reviewed for WE
Prerequisite Indoor Water Use Reduction. What action should occur to ensure building
occupants are satisfied with the fixtures and fittings? - ✔✔Determining the fixtures will
not have performance problems.
-In high-rises and in different areas where water pressure can vary, it is important for
the MEP engineer to address the delivery pressure of the water. By working with the
MEP engineer and architect at the project kickoff meeting, specifications can be set so no
water pressure issues occur.
Which document will serve as the foundation from which all design construction,
acceptance, and operational decisions are made? - ✔✔Owner's Project Requirements: A
written document that details the ideas, concepts, and criteria determined by the owner
to be important to the success of the project.
An office project in a cold climate burns natural gas on-site for heating and uses
electricity from the grid in warmer seasons for cooling. Which option can be used to
mitigate both Scope 1 and Scope 2 emissions? - ✔✔Carbon offsets. Only carbon offsets
can be used for both emission types - non-electricity and electricity.
-Scope 1 emissions are direct greenhouse gas emissions from sources owned or
controlled by the entity, such as emissions from fossil fuels burned on site. Scope 2
emissions are indirect greenhouse gas emissions associated with the generation of
purchased electricity.
COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 2