2025 Questions and Answers 100%
Pass
What are the basic typers of LEED improvements that are updated through revisions
on a regular development cycle? - ✔✔Addenda and the next version of the LEED rating
system.
Grammatically, what language is the appropriate usage to describe a project that has
been certified at any level? - ✔✔LEED-certified
Exemplary performance and pilot credits are awarded in what LEED category? -
✔✔Innovation
A university client asks about verifying multiple buildings. Which of the following is an
appropriate response? - ✔✔The campus program can be used for projects not
necessarily uniform in design or operations but located on a single campus location.
A member company wants to display its USGBC member logo What would be an
appropriate use for the USGBC member logo? - ✔✔On company letterhead.
LEED requires which of the following to be done in order for a project to earn
certification? - ✔✔Meet the minimum program requirements.
COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 1
, What term refers to a mandatory project characteristics, measurement, quality =, value
or function as identified within LEED rating system? - ✔✔Prerequisites
At a minimum, a project team must successfully do which of the following to obtain
LEED certification? - ✔✔Gather the minimum number of points (40) required for the
certification.
A building owner's project includes a major HVAC renovation, significant envelope
modifications, and core plumbing renovation. An interior fit-out is not part of the
project. What LEED rating system would most be appropriate for this project? -
✔✔LEED B+C - Core and Shell
Performance periods are part of which LEED rating system family? - ✔✔LEED O+M
projects.
A telecom company is building a new ten story office and data center. the office space
will be on the top seven floors and data center on the first 3 floors. Which of the
following rating system would be best suited for this project? - ✔✔LEED B+C:New
Construction
What is the exterior surge of the building referred to as? - ✔✔Envelope
Credit Interpretation Requests (CIRs) are most likely used for what part of the LEED
process? - ✔✔Technical guidance for LEED credits.
Anyone of the project team can submit one.
What best defines the project boundary? - ✔✔Platted property line of the project
defining land and water within it.
"To transform the way buildings and communities are designed, built, and operated,
enabling an environmentally and socially responsible, healthy, and prosperous
COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 2