100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

LEED AP EXAM 2025 QUESTIONS AND ANSWERS 100% PASS

Puntuación
-
Vendido
-
Páginas
76
Grado
A+
Subido en
26-04-2025
Escrito en
2024/2025

LEED AP EXAM 2025 QUESTIONS AND ANSWERS 100% PASS LT Sensitive Land protection - minor improvements allowed in a water-body/wetland buffer - 1. Clearings are limited to 500 SF (45 m2), max. 300 linear feet 2. Maintenance shed 3. Bike path/walkway: a maximum of 12-feet wide (3.5 meters) with an impervious limit of 8-feet wide (2.5 meters). A good design might be an 8-foot impervious trail with 2 feet of gravel on either side. 4. One single-story structure, not exceeding 500 square feet (45 square meters), max. 300 linear feet 5. Grade changes necessary to ensure public access 6. Removal of the following tree types (by qualified arborist): 2COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED ● Hazardous trees, up to 75% of dead trees ● Trees less than 6 inches (150 millimeters) diameter at breast height ● Up to 20% of trees more than 6 inches (150 millimeters) diameter at breast height with a condition rating of 40% or higher. ● Trees under 40% condition rating 7. Brownfield remediation activities. LT baseline parking capacity calculation - The calculations of the base ratio is based on a project's use type and size LT transportation demand management strategies - Telecommuting Shuttles Shared parking between uses Residential units rented/sold separately from parking 3COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED Transit subsidies Compressed workweek schedules LT infill status - Determine the percentage of land that is previously developed by dividing the previously developed area by the total land area less streets and rights-of- way within 1/2 mile (800 meters) of the project boundary. Water bodies are not included in land area. In order to be considered an infill site, the percentage of previously developed land has to be at least 75%. LT Credit Green Vehicles - Discounted parking rate - the discounted rate must be available to all customers AND publically posted at the entrance of the parking area. The discounted rate must be available in perpetuity after the project's completion. MIN. 20% LT Credit Surrounding Density and Diverse Uses - Diverse Uses - - A use type only counts once (retail store that has a nail salon only counts once) - Uses must come from at least 3 of the 5 categories, exclusive of the building's primary use - No more than two uses of each type (maximum of 2 restaurants for example) 4COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED - Uses that are planned count if they are available within one year of LEED occupancy. LT bicycle network - - A continuous network of bike trails - Striped lines on streets (if speed limit is higher than 25mph) - The maximum speed limit on streets is 25 mph (40 kph). If the speed limit is low enough, streets do not need to have dedicated stripes to qualify as a part of the bicycle network. LT High-Priority Site - brownfield remidiation - the soil or groundwater must be contaminated. A building on the site or nearby doesn't count. LT Sensitive land criteria - Sensitive land criteria is listed for five land types: Prime farmland - For prime farm land check with the Natural Resources Conservation Service soil surveys for the area. Flood plain - Usually specified by FEMA. Threatened or endangered species - Any species listed by the U.S. Endangered Species Act listed on any state endangered species legislation or classified by Nature Serve as GH, G1, or G2 are considered threatened or endangered for purposes of this credit. 5COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED Water bodies - No development within 100 feet (30 meters) of water bodies. (for ex. streams, ponds) Wetlands - No development within 50 feet (15 meters) of wetlands. LT Credit Surrounding Density and Diverse Uses - Warehouses and Distribution Centers - Option 1 Development and Adjacency. For this option the project must: ● Construct or renovate the project on a previously developed site that was used for industrial or commercial purposes (2 points). OR ● Construct or renovate the project on a site that is both a previously developed and an adjacent site. The adjacent sites must be currently used for industrial or commercial purposes (3 points). Option 2 Transportation Resources, the site must be constructed or renovated on a site that has at least two of the following: ● The site is within a 10-mile (16 kilometer) driving distance of a main logistics hub, defined as an airport, seaport, intermodal facility, or freight village with intermodal transportation. ● The site is within a 1-mile (1600-meter) driving distance of an on-off ramp to a highway. 6COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED ● The site is within a 1-mile (1600-meter) driving distance of an access point to an active freight rail line. ● The site is served by an active freight rail spur. LT Credit Access to Quality Transit - Schools - Only school projects have options/requirements for bicycle lanes. For other project types, being able to bicycle to the transit service does not contribute to this credit. LT mapping the surrounding density - On the map, identify the buildings in the area as either residential, non-residential, or mixed use. Also include buildable land, which includes all of the land within that 1/4 mile except non-habitat space such as parking garages, or public rights of way, and land that is excluded from development by law. The project buildings are also not included in the surrounding density calculations (remember it is surrounding density, not project density). Schools only: Physical education spaces that are part of the project site (playing fields, associated bldgs, playgrounds) are excluded from the calculation. LT criteria for EVSE ( for green parking) - 1. A Level 2 or higher charging capacity 2. Compliance with the regional standard. In the U.S., the most common regional standard for these facilities is the Society of Automotive

Mostrar más Leer menos
Institución
LEED
Grado
LEED











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
LEED
Grado
LEED

Información del documento

Subido en
26 de abril de 2025
Número de páginas
76
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

LEED AP EXAM 2025 QUESTIONS
AND ANSWERS 100% PASS


LT Sensitive Land protection - minor improvements allowed in a water-body/wetland
buffer - ✔✔1. Clearings are limited to 500 SF (45 m2), max. 300 linear feet




2. Maintenance shed




3. Bike path/walkway: a maximum of 12-feet wide (3.5 meters) with an impervious
limit of 8-feet wide (2.5 meters). A good design might be an 8-foot impervious trail with
2 feet of gravel on either side.




4. One single-story structure, not exceeding 500 square feet (45 square meters), max. 300
linear feet




5. Grade changes necessary to ensure public access




6. Removal of the following tree types (by qualified arborist):




COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 1

,● Hazardous trees, up to 75% of dead trees




● Trees less than 6 inches (150 millimeters) diameter at breast height




● Up to 20% of trees more than 6 inches (150 millimeters) diameter at breast height with
a condition rating of

40% or higher.




● Trees under 40% condition rating




7. Brownfield remediation activities.

LT baseline parking capacity calculation - ✔✔The calculations of the base ratio is based
on a project's use type and size

LT transportation demand management strategies - ✔✔Telecommuting




Shuttles




Shared parking between uses




Residential units rented/sold separately from parking




COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 2

,Transit subsidies




Compressed workweek schedules

LT infill status - ✔✔Determine the percentage of land that is previously developed by
dividing the previously developed area by the total land area less streets and rights-of-
way within 1/2 mile (800 meters) of the project

boundary. Water bodies are not included in land area.




In order to be considered an infill site, the percentage of previously developed land has
to be at least 75%.

LT Credit Green Vehicles - Discounted parking rate - ✔✔the discounted rate must be
available to all customers AND publically posted at the entrance of the parking area.




The discounted rate must be available in perpetuity after the project's completion.

MIN. 20%

LT Credit Surrounding Density and Diverse Uses - Diverse Uses - ✔✔- A use type only
counts once (retail store that has a nail salon only counts once)




- Uses must come from at least 3 of the 5 categories, exclusive of the building's primary
use




- No more than two uses of each type (maximum of 2 restaurants for example)




COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 3

, - Uses that are planned count if they are available within one year of LEED occupancy.

LT bicycle network - ✔✔- A continuous network of bike trails




- Striped lines on streets (if speed limit is higher than 25mph)




- The maximum speed limit on streets is 25 mph (40 kph). If the speed limit is low
enough, streets do not need to have dedicated stripes to qualify as a part of the bicycle
network.

LT High-Priority Site - brownfield remidiation - ✔✔the soil or groundwater must be
contaminated. A building on the site or nearby doesn't count.

LT Sensitive land criteria - ✔✔Sensitive land criteria is listed for five land types:




Prime farmland - For prime farm land check with the Natural Resources Conservation
Service soil surveys for the area.




Flood plain - Usually specified by FEMA.




Threatened or endangered species - Any species listed by the U.S. Endangered Species
Act listed on any state endangered species legislation or classified by Nature Serve as
GH, G1, or G2 are considered threatened or endangered for purposes of this credit.




COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 4
$13.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GraceAmelia West Virginia University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
90
Miembro desde
1 año
Número de seguidores
32
Documentos
8992
Última venta
1 día hace
GraceAmelia\'s Emporium

Get a well Researched and Accurate Study Materials to Boost Your Grades and Excel Academically Offered by Seller Grace.

2.8

8 reseñas

5
2
4
1
3
1
2
1
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes