100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

LEED AP O+M Credits Exam 2025 Questions and Answers 100% Pass

Puntuación
-
Vendido
-
Páginas
28
Grado
A+
Subido en
26-04-2025
Escrito en
2024/2025

LEED AP O+M Credits Exam 2025 Questions and Answers 100% Pass Location and Transportation Credits - - Alternative Transportation Alternative Transportation - - Survey = 1 point - Results... 10% = 3 pts, 15% = 4 pts, etc all the way to 70% = 15 points Sustainable Sites credits - - Site Management Policy (prerequisite) - Site Development - Protect or Restore Habitat - Rainwater Management - Heat Island Reduction - Light Pollution Reduction - Site Management - Site Improvement Plan - Joint Use of Facilities (schools only) "Site Management Policy" intent - To preserve ecological integrity and encourage environmentally sensitive site management practices that provide a clean, well- maintained, and safe building exterior while supporting high-performance building operations and integration 2COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED Site Management Policy Requirements - Establishment: create and implement site management policy that employs best management practices for the operational elements on the building and grounds Performance: None Site Management Policy Required Documentation - - Site management policy document - Justification for operational elements not included in policy "Site Development - Protect or Restore Habitat" intent - To conserve existing natural areas and restore damaged areas to provide habitat and promote biodiversity "Site Development - Protect or Restore Habitat" Requirements - - Option 1: On-site Restoration (2 points) - Establishment: have native/adapted vegetation on 20% of the total site area and a minimum of 5,000 sf - Option 2: Financial Support (1 point) - Establishment: Financial support equal to $.05 per square foot of total site area. - Performance: Provide specifid financial support annually "Site Development - Protect or Restore Habitat" Referenced Standards - - U.S. EPA Ecoregions - Land Trust Alliance Accreditation "Site Development - Protect or Restore Habitat" Required Documentation - Option 1: 3COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED - Description of native or adapted vegetation - Site plan showing boundary, footprint, preserved greenfield area, previously developed area, restored area, vegetation, etc Option 2: - Confirmation land trust is accredited by Land Trust Alliance - Confirmation that financial support will be provided annually "Rainwater Management" intent - To reduce runoff volume and improve water quality by replicating the natural hydrology and water balance of the site, based on historical conditions and undeveloped ecosystems in the region. worth 3 points "Rainwater Management" Requirements - Establishment: Use low-impact development to capture and treat water from 25% of impervious surfaces for the 95th percentile storm event. Performance: Document annual inspections, identifying areas of erosion and maintenance needs. Provide necessary maintenance within 60 days of inspection. "Rainwater Management" Referenced Standards - U.S. EPA Technical Guidance on Implementing the Rainwater Runoff Requirements for Federal projects under Section 438 of the Energy Independence and Security Act "Heat Island Reduction" intent - To minimize the effects on microclimates and human and wildlife habitats by reducing heat islands. 4COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED "Heat Island Reduction" Requirements - Option 1: Nonroof (1 point) - Establishment: Use any combo of the strategies for a minimum of 50% of the site paving - Performance: implement maintenance program that cleans all high-reflectance paving surfaces every 3 years. Option 2: Roof (1 point) - Establishment: Use roofing materials of certain solar reflectance for at least 75% of the roof, or vegetated cover for at least 50% of roof. You ca

Mostrar más Leer menos
Institución
LEED
Grado
LEED










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
LEED
Grado
LEED

Información del documento

Subido en
26 de abril de 2025
Número de páginas
28
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

LEED AP O+M Credits Exam 2025
Questions and Answers 100% Pass


Location and Transportation Credits - ✔✔- Alternative Transportation

Alternative Transportation - ✔✔- Survey = 1 point

- Results... 10% = 3 pts, 15% = 4 pts, etc all the way to 70% = 15 points

Sustainable Sites credits - ✔✔- Site Management Policy (prerequisite)

- Site Development - Protect or Restore Habitat

- Rainwater Management

- Heat Island Reduction

- Light Pollution Reduction

- Site Management

- Site Improvement Plan

- Joint Use of Facilities (schools only)

"Site Management Policy" intent - ✔✔To preserve ecological integrity and encourage
environmentally sensitive site management practices that provide a clean, well-
maintained, and safe building exterior while supporting high-performance building
operations and integration



COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 1

,Site Management Policy Requirements - ✔✔Establishment: create and implement site
management policy that employs best management practices for the operational
elements on the building and grounds




Performance: None

Site Management Policy Required Documentation - ✔✔- Site management policy
document

- Justification for operational elements not included in policy

"Site Development - Protect or Restore Habitat" intent - ✔✔To conserve existing natural
areas and restore damaged areas to provide habitat and promote biodiversity

"Site Development - Protect or Restore Habitat" Requirements - ✔✔- Option 1: On-site
Restoration (2 points)

- Establishment: have native/adapted vegetation on 20% of the total site area and a
minimum of 5,000 sf




- Option 2: Financial Support (1 point)

- Establishment: Financial support equal to $.05 per square foot of total site area.

- Performance: Provide specifid financial support annually

"Site Development - Protect or Restore Habitat" Referenced Standards - ✔✔- U.S. EPA
Ecoregions

- Land Trust Alliance Accreditation

"Site Development - Protect or Restore Habitat" Required Documentation - ✔✔Option 1:




COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 2

, - Description of native or adapted vegetation

- Site plan showing boundary, footprint, preserved greenfield area, previously
developed area, restored area, vegetation, etc




Option 2:

- Confirmation land trust is accredited by Land Trust Alliance

- Confirmation that financial support will be provided annually

"Rainwater Management" intent - ✔✔To reduce runoff volume and improve water
quality by replicating the natural hydrology and water balance of the site, based on
historical conditions and undeveloped ecosystems in the region.




worth 3 points

"Rainwater Management" Requirements - ✔✔Establishment: Use low-impact
development to capture and treat water from 25% of impervious surfaces for the 95th
percentile storm event.




Performance: Document annual inspections, identifying areas of erosion and
maintenance needs. Provide necessary maintenance within 60 days of inspection.

"Rainwater Management" Referenced Standards - ✔✔U.S. EPA Technical Guidance on
Implementing the Rainwater Runoff Requirements for Federal projects under Section
438 of the Energy Independence and Security Act

"Heat Island Reduction" intent - ✔✔To minimize the effects on microclimates and
human and wildlife habitats by reducing heat islands.



COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 3
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GraceAmelia West Virginia University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
90
Miembro desde
1 año
Número de seguidores
32
Documentos
8992
Última venta
1 día hace
GraceAmelia\'s Emporium

Get a well Researched and Accurate Study Materials to Boost Your Grades and Excel Academically Offered by Seller Grace.

2.8

8 reseñas

5
2
4
1
3
1
2
1
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes