100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Caso

Fdny p-99 c of Exam 2024/2025 Latest Update With Practice Questions & verified Answers 100% Updated!

Puntuación
-
Vendido
-
Páginas
7
Subido en
24-04-2025
Escrito en
2024/2025

Fdny p-99 c of Exam 2024/2025 Latest Update With Practice Questions & verified Answers 100% Updated! What is a general requirement of the location of the installation of a boiler? - ANS Adequate clearance from combustile construction What temperature must the materials remain under during combustion? - ANS 170 degrees What is a requirement for the access of the boiler? - ANS Access for operation and maintenance must not be hazardous What is required upon installation to operate a boiler? - ANS Inspection and test resulting in equipment use permit from commissioner How often should a boiler be inspected? - ANS Once a year What documentation is required from a certificate holder? - ANS Owners annual statement What is required to hydrostatically test upon installation and who should perform these tests? - ANS Liquid fuel piping and fuel oil storage tanks by the installing contractor At what pressure should piping be tested? - ANS 1/2 max working pressure but less than pressure required for storage tank At what pressure should oil storage tanks be tested? - ANS At 1 1/2x max working pressure but never 25 psi How long should hydrostatic pressure be maintained? - ANS Until all joints and connections are inspected for leaks and at 30 minutes have passed

Mostrar más Leer menos
Institución
Fdny P-99 C O
Grado
Fdny p-99 c o

Vista previa del contenido

Fdny p-99 c of Exam 2024/2025 Latest
Update With Practice Questions &
verified Answers 100% Updated!

What is a general requirement of the location of the installation of a boiler?
- ANS>> Adequate clearance from combustile construction

What temperature must the materials remain under during combustion? -
ANS>> 170 degrees

What is a requirement for the access of the boiler? - ANS>> Access for
operation and maintenance must not be hazardous

What is required upon installation to operate a boiler? - ANS>> Inspection
and test resulting in equipment use permit from commissioner

How often should a boiler be inspected? - ANS>> Once a year

What documentation is required from a certificate holder? - ANS>> Owners
annual statement

What is required to hydrostatically test upon installation and who should
perform these tests? - ANS>> Liquid fuel piping and fuel oil storage tanks
by the installing contractor

At what pressure should piping be tested? - ANS>> 1/2 max working
pressure but less than pressure required for storage tank

At what pressure should oil storage tanks be tested? - ANS>> At 1 1/2x
max working pressure but never < 25 psi

How long should hydrostatic pressure be maintained? - ANS>> Until all
joints and connections are inspected for leaks and at 30 minutes have
passed

, If ventilation is supplied mechanically, what is required of the pressure? -
ANS>> It must be greater than the atmospheric pressure outdoors

How are flue dampers designed? - ANS>> So that they cannot completely
cut off passage of flue gasses at any time

When can tight closing dampers be installed? - ANS>> When accompanied
by approved automatical draft and combustion controls.

What is the minimum flashpoint for fuel oils to mean hydrocarbon oils? -
ANS>> 100 degrees

What type of oils should be used in low pressure burners? - ANS>> No.
1(range oil), no. 2(diesel oil), no. 4, no. 5, no. 6

What oil is prohibited? - ANS>> Crank case refuse oil

What is required of the size of overflow pipes? - ANS>> They should at
least be the same size as supply pipes

Where should a relief valve be installed? - ANS>> In the discharge line
between the pump and the first shut off valve

How is oil heated in storage tanks? - ANS>> Coils using low pressure hot
water/steam or approved electric heaters.

Where are shut off valves required? - ANS>> One at the supply line at the
tank and and one at the supply line at the burner

What stops the flow of oil? - ANS>> Remote control

Where is the remote control located? - ANS>> As close to the entrance of
the boiler room as practical or immediately inside as long as it's accessible
at all times. On tank if 60 gal or less

What are the 4 safety controls implemented? - ANS>> Oil temperature
control, ignition, stack/combustion control, and high pressure and
temperature control.

Is a chimney required to install a burner? - ANS>> Yes

Escuela, estudio y materia

Institución
Fdny p-99 c o
Grado
Fdny p-99 c o

Información del documento

Subido en
24 de abril de 2025
Número de páginas
7
Escrito en
2024/2025
Tipo
Caso
Profesor(es)
Desconocido
Grado
Desconocido

Temas

$20.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
mumbimakinya21

Conoce al vendedor

Seller avatar
mumbimakinya21 Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
1 año
Número de seguidores
0
Documentos
89
Última venta
-
ONE STOP

One stop store where you find all the reading materials you need .Let us help you study and Prepare for your exams.

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes