ALREADY PASSED
"What septic systems require planning by Professional Engineer? - CORRECT ANSWER
low pressure dosing, absorptive mounds, soil substitution, secondary treatment, anything
aerobic"
"What does it mean to alter a septic system? - CORRECT ANSWER To change an on-site
sewage facility"
"Authorization to construct - CORRECT ANSWER first part of the permit"
"Authorized agent - CORRECT ANSWER delegated the authority by the executive
director to implement and enforce the rules"
"Certified professional soil scientist - CORRECT ANSWER individual who has met the
certification requirements of the American Society of Agronomy to engage in the practice of
soil science"
"Designated representative - CORRECT ANSWER An individual who holds a valid
license to review permit applications, site evaluations, or planning materials, or conduct
inspections on on-site sewage facilities."
"Floodplain (100-year) - CORRECT ANSWER has a 1% chance of flooding each year"
"Recharge feature - CORRECT ANSWER Permeable geologic or manmade feature
located on the Edwards Aquifer Recharge Zone, hydrologic interconnectedness and rapid
infiltration can occur"
"Sewage - CORRECT ANSWER is primarily organic and biodegradable or
decomposable, and originates as human, animal, or plant waste"
"Site evaluator - CORRECT ANSWER conducts preconstruction site evaluations,
performs soil analysis, a site survey, or other activities necessary to determine the
suitability of a site for OSSF"
"Can a professional engineer perform sit evaluation without SE license - CORRECT
ANSWER Yes"
1
,"What is a well - CORRECT ANSWER defined under Texas Water Code, Chapters 26, 32,
and 33, and 16 TAC Chapter 76"
"How often does an install renew their registration - CORRECT ANSWER every 3 years"
"Types of penalties for violating OSSF regulations - CORRECT ANSWER injunction, civil
or criminal"
"Health and Safety Code, Chapter 366 - CORRECT ANSWER Updated February 7, 2017"
"On-Site Sewage Facilities, Title 30, TAC Chapter 285 - CORRECT ANSWER Effective
December 29, 2016"
"Occupational Licenses and Registrations, Title 30, TAC Chapter 30, Subchapters A and G -
CORRECT ANSWER Effective September 29, 2016"
"Major steps in permitting process - CORRECT ANSWER Site/soil evaluation
Select OSSF system
System planning
Submit for permit
Review permit application
Authorization to construct issued
Construction
Inspection
Notice of approval"
"What are bacteria that can cause disease called - CORRECT ANSWER pathogens"
"Microorganisms in wastewater include - CORRECT ANSWER bacteria, viruses,
protozoa and melminths"
"What is a solid that can be filtered from waste called - CORRECT ANSWER TOS total
suspended solids"
"What is a solid that cannot be filtered from wastewater called - CORRECT ANSWER
TDS total dissolved solids"
"What OSSF should be used in clay soil - CORRECT ANSWER drip or spray irrigation"
2
, "Adsorption will occur - CORRECT ANSWER in water with high hardiness and pH 6.5-
7"
"Can a septic tank be considered a pretreatment system - CORRECT ANSWER yes"
"A standard disposal system does NOT include - CORRECT ANSWER gravel less pipes"
"A nonstandard disposal system does NOT include - CORRECT ANSWER drip
irrigation"
"What should a site evaluation include - CORRECT ANSWER soil and geologic
conditions, lot size, topography and slope, setbacks /separation distances, flood hazard
info"
"Soil from largest to smallest - CORRECT ANSWER gravel (2+mm) sand (.05-2mm) silt
(.002-.05mm) clay (less than .002mm)"
"What are the 4 major components of soil - CORRECT ANSWER organic, air filled,
water filled, mineral"
"Soil texture - CORRECT ANSWER the relative proportion of sand, silt and clay in soil"
"Porosity - CORRECT ANSWER the percentage of soil that is occupied by pores or
space"
"Specific yeild - CORRECT ANSWER the amount of water drained from soil by gravity"
"Specific retention - CORRECT ANSWER amount of water remaining after gravity
drainage"
"Permeability - CORRECT ANSWER the capacity of a material to transmit water"
"Uniform grains have high porosity - CORRECT ANSWER true"
"Non uniform grains have low porosity - CORRECT ANSWER true"
"Fractured rock has what type of porosity - CORRECT ANSWER high"
"Clay porosity and specific yield - CORRECT ANSWER 45-55% and 1-10"
3